Cossiga Dtght6 Dtg Ht Heated Multideck Instructions
- June 29, 2024
- cossiga
Table of Contents
Dtght6 Dtg Ht Heated Multideck
“`html
Specifications:
-
Model: DTGHT6, DTGHT9
-
Cabinet Dimensions & Specifications:
-
Cabinet: Stainless steel construction
-
Shelving: Four stainless steel heated
shelves -
Operating Temp: 70 – 85°C
-
Shelf Dimensions: DTGHT6 – 486mm x 387mm,
DTGHT9 – 786mm x 387mm -
Base Tray Dimensions: W x D – 520mm x
533mm -
Display Frequency: M2
-
Operating Current: 0.98 Amps (DTGHT6), 1.63
Amps (DTGHT9)
-
-
Power: 1.9 Kw (DTGHT6), 2.33 Kw (DTGHT9)
-
Connection: Electrical power cord 2200mm,
Voltage: 220-240V
Product Features:
- Canopy LED light
- Shelf air curtain
- LED Under shelf lighting
- Frameless acrylic front doors
- Silicone base heating pad (HT9 unit only)
- Roll in on castors with screw down feet
- Opening front grille
Usage Instructions:
Power Switch:
All fans and heating elements are on when the power switch is
on. If the ECO switch is off, this is the standard operating
state.
LED Light Switch:
All LED lights are on when the LED light switch is activated. If
an optional light box is installed, it will power on with the power
switch.
ECO Switch:
The ECO switch must be on for operation. When ECO is on, the two
lower shelves, fans, and silicone base heating pad (HT9 unit only)
are off. When ECO is off, all shelves, fans, and the silicone base
heating pad are on.
Frequently Asked Questions (FAQ):
Q: Can the heated multideck be used without the ECO mode?
A: Yes, the multideck can be operated without the ECO mode by
switching it off, which will activate all shelves, fans, and the
silicone base heating pad.
Q: What is the minimum gap required between cold and heated
units?
A: A minimum gap of 150mm is required between cold and heated
units to avoid heat transfer between cabinets.
“`
DTG HT HEATED MULTIDECK
HT DTGHT6 DTGHT9
Stainless steel construction Four Stainless steel heated shelves Ticket strips
on shelves Shelf mounted air curtains Forced air circulation Under shelf and
canopy LED lights Hinged arcylic front doors Opening front grille panel Roll
in on castors with adjustable feet ECO mode turns of heat on two bottom
shelves and base
CABINET DIMENSIONS & SPECIFICATIONS
MODEL
CABINET
SHELVING OPERATING TEMP
SHELF
BASE TRAY
DISPLAY FREQUENCY
OPERATING CURRENT
LENGTH DEPTH HEIGHT WEIGHT
[MM] [MM] [MM] [KG]
DTGHT6 600 775 1860 139 4 + BASE
DEG C
70 -85
W X D
W X D
486 X 387 520 X 533
M2
Hz
0.98 50/60 HZ
Amps
7.2
DTGHT9 900 775 1860 178 4 + BASE 70 -85 786 X 387 820 X 533 1.63 50/60 HZ 10.5
POWER
Kw
1.9 2.33
CONNECTION ELECTRICAL POWER CORD 2200MM
VOLTAGE
PACKED FOR SHIPPING
NZ/AUS 10 AMP
10 AMP 3 PIN PLUG
15 AMP LEAD ONLY
UK AMP
10 AMP 3 PIN PLUG
15 AMP LEAD ONLY
Volts
220-240V 220-240V
LENGTH [MM]
DEPTH [MM]
HEIGHT [MM]
WEIGHT [KG]
700
830 2030 175
1000 830 2030 215
Page 1 Date Modified: 01/05/24 Check website for latest version
Download or contact us on COSSIGA.COM
DTG HT HEATED MULTIDECK – PRODUCT FEATURES
Canopy LED light
Shelf air curtain
LED Under shelf lighting Frameless acrylic front doors Silcone base heating
pad (HT9 unit only )
Roll in on castors with screw down feet
Opening front grille
POWER SWITCH All fans and heating elements on (with ECO swith off) standard
operating state.
LED LIGHT SWITCH All LED lights on. If optional light box is fitted the light box will power on with power switch.
ECO SWITCH – power switch must be on.
ECO ON – two lower shelves , fans and silcone base heating pad (HT9 unit only
) – ARE OFF
ECO OFF – all shelves , fans and silcone base heating pad (HT9 unit only ) –
ARE ON
Page 2 Date Modified: 01/05/24 Check website for latest version
Download or contact us on COSSIGA.COM
DTG L.E.D. LIGHT BOX
Top mounting bracket 8mm Glass front light box with L.E.D. white back lit panel Custom PVC graphic slides into light box
Custom graphic panel inserted into frame ( see sizes in table )
LIGHT BOX SIZES
MODEL
DTG6 DTG9
OVER ALL LENGTH
600 900
See Light box assembly document
LIGHT BOX SIZES
HEIGHT MM
200 200
GRAPHIC PANEL SIZE W X H
595 X 189 895 X 189
Page 3 Date Modified: 01/05/24 Check website for latest version
Download or contact us on COSSIGA.COM
DTG HT OPEN FRONT MULTIDECK – PRODUCT ACCESSORIES
Fitted to top of unit with supplied brackets
Top mounting bracket Digital display screen High Gloss picture Data input from
USB
Steel rack black coated Clips onto front grille
1
25
750
19
55
572
19
794 291
344
1861 2152
DIGITAL SCREEN sold as accessory kit
Page 4 Date Modified: 01/05/24 Check website for latest version
SAUCE RACK AVAILABLE UK / EUR ONLY sold as accessory kit
Download or contact us on COSSIGA.COM
DTG OR HT
Separation between cold and heated units
Cold and heated units must be separated with a minimum gap of 150mm to avoid
heat transfer between cabinets
DTG OR REFRIGERATED
DTG HT HEATED
No Minimum gap required between cold units together
No Minimum gap required between hot units together
DTG OR REFRIGERATED
DTG HT HEATED
1b5e0tmwemenmcinoilmd aunmd
gap hot
units
Page 5 Date Modified: 01/05/24 Check website for latest version
Download or contact us on COSSIGA.COM
DTG HT COLOUR WRAP OPTIONS
–
Full Wrap
front and side facing areas covered (excludes top and rear)
Page 6 Date Modified: 01/05/24 Check website for latest version
Front Wrap
Only front facing areas covered
Download or contact us on COSSIGA.COM
DTG BUFFER STRIP
Stainless steel buffer Screw fixed to unit frame
BUFFER STRIP BAR
MODEL
BUMPER STRIP SIZES
DTG6 DTG9
OVER ALL BUFFER LENGTH
600 900
HEIGHT MM
75 75
SCREW FIXING POINTS
2 2
Page 7 Date Modified: 01/05/24 Check website for latest version
self tapping screws with spacers
Download or contact us on COSSIGA.COM
DTG HT UNPACK AND LIFT
REAR
Tools Required
1. Lift off truck on pallet with the rear of the unit facing the forklift
REAR
3. Lift with forks under centre of frame. Check span of forks under unit to
avoid any damage to components.
Page 8 Date Modified: 01/05/24 Check website for latest version
2 Unpack. Remove front grill.
4. Transport to required location
Download or contact us on COSSIGA.COM
DTG HT UNPACK AND ROLL
Tools Required
REAR
REAR
1. Lift of transport on pallet with the rear of the unit facing the forklift
2
Place the boxed unit on a level floor area. Remove plywood top cover and put aside.
Remove front, side and corner pieces and
discard.
REAR
extreme care required due to toppling risk
3 Locate the four metal brackets in the accessory pack.
4. Place three or four of the metal brackets on a level floor in front of the
bottom pallet with the rear of the cabinet facing the ramp. Place the plywood
top cover on the floor and corner brackets to form a ramp.
Page 9 Date Modified: 01/05/24 Check website for latest version
5. Carefully roll the unit off the pallet down the ramp. Two or more people
may be required depending on the size of the unit.
Download or contact us on COSSIGA.COM
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>