INSTALLATION GUIDE
Specifications
- Height Clearance to Building Element (HCB): 25mm
- Side Clearance to Insulation (SCI): 72.5mm
- Side Clearance to Auxiliary Equipment (SCB): 25mm
Product Usage Instructions
1. Installation Procedure
Follow the steps below for proper installation:
- Switch off the power before starting the installation process.
- Switch on the power only after the complete installation and examination of the circuit.
2. Installation Spacing
Ensure the following spacing requirements are met:
- Height Clearance to Building Element (HCB): 25mm
- Side Clearance to Insulation (SCI): 72.5mm
- Side Clearance to Auxiliary Equipment (SCB): 25mm
3. Product Modification and Warranty
Product modification and improper installation will void the warranty. The light source of the luminaire is non-user-replaceable. If damaged, the luminaire should be destroyed.
4. Caution and Safety
There is a risk of electric shock and overheating/fire if clearance distances are compromised. Select the preferred color temperature for the product according to installation requirements.
5. Cutout
Refer to the cutout table for the appropriate cutout dimensions.
FAQ
Q: Can the light source be replaced by the user?
A: No, the light source of the luminaire is non-user-replaceable.
Q: What should I do if the luminaire is damaged?
A: If the luminaire is damaged, it should be destroyed as the light source is not replaceable.
Q: How should I adjust the sensor setting?
A: Adjust the sensor setting according to the installation requirements and preferred color temperature for the product.