ULINE S-7447 2-1 Quart Paint CAN Shipper Installation Guide
- June 7, 2024
- ULINE
Table of Contents
ULINE S-7447 2-1 Quart Paint CAN Shipper Installation Guide
ASSEMBLY INSTRUCTIONS
- Fold flaps on bottom of carton so that they meet. Manufacturer’s certification must be visible on the outside of the carton. (See Figure 1)
- Seal bottom of carton down the center seam with one strip of 2″ wide (2 mil) polypropylene tape (Uline Model # S-472). The tape must extend 3″ over each end of the carton. (See Figure 2)
- Fill cans. Do not overfill.
- Secure lids completely on cans by applying even pressure with a paint can closer until lids are fully nested. (See Figure 3)
- Align locking rings evenly over can lids and secure by applying even pressure with a paint can closer. Make sure rings snap into place. (See Figure 4)
- Place cans into carton – bottom first.
- Fold flaps on top of carton so that they meet. “THIS SIDE UP” must be visible on the outside of the carton. (See Figure 5)
- Seal top of carton down the center seam with one strip of 2″ wide (2 mil) polypropylene tape (Uline Model # S-472). The tape must extend 3″ over each end of the carton. (See Figure 6)
1-800-295-5510
uline.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>