ULINE Shoe Box Installation Guide
- June 7, 2024
- ULINE
Table of Contents
ULINE Shoe Box Installation Guide
ASSEMBLY
Base Assembly
-
Open up box base and lay flat. (See Figure 1)
NOTE:
Before assembling, crease along all folds to ensure a proper fit -
Along the short end, fold side tabs Push in and fold corners to form one end of the base. (See Figure 2)
-
After folding the corners completely in, tuck snugly against the end panel. (See Figure 3)
-
Fold the top flap over so it is flat against the end. (See Figure 4)
LID ASSEMBLY
-
Open up box lid and lay (See Figure 5)
NOTE:
Before assembling, crease along all folds to ensure a proper fit -
Along the short end, fold side tabs Push in and fold corners to form one end of the lid.
-
After folding the corners completely in, tuck snugly against the end panel. (See Figure 7)
-
Fold the top flap over so it is flat against the end. (See Figure 8)
-
Repeat on the other side of the
Contacts us
1-800-295-5510
uline.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>