APsystems YC1000-3 3-Phase Micro-Inverter User Manual
- June 6, 2024
- APsystems
Table of Contents
YC1000-3 3-Phase Micro-Inverter
Installation / User Manual
APsystems YC1000-3 3-Phase Microinverter
ALTENERGY POWER SYSTEM Inc. WEB: usa.APsystems.com WEB: canada.APsystems.com
APsystems America 600 Ericksen Ave NE, Suite 200 Seattle, WA 98110 TEL:
844-666-7035 EMAIL:
info.usa@APsystems.com
APsystems Canada 600 Ericksen Ave NE, Suite 200 Seattle, WA 98110 TEL:
844-666-7035 EMAIL:
info.canada@APsystems.com
Tips:If you need to inquire about related technical issues, please email to
the info mailbox of your area.
Please scan the QR code to get mobile app and more support to help the
installation.
© All Rights Reserved
Table of Contents
Important Safety Instructions………………………………………………………………………………………2
Radio interference statement…………………………………………………………………………………………………….. 2 Safety
Instructions……………………………………………………………………………………………………………………….. 3
APsystems YC1000-3 System Introduction……………………………………………………………….4 APsystems
Three-phase Microinverter YC1000-3…………………………………………………… 6 APsystems
Microinverter System Installation………………………………………………………….. 7
Additional Installation components from APsystems……………………………………………………………. 7
Required Parts and Tools from you……………………………………………………………………………………………7 PV Rapid
Shut Down Equipment………………………………………………………………………………………………..8 Installation
Procedures………………………………………………………………………………………………………………… 9
Step 1 – Lay the AC bus according to the arrangement of APsystems
Microinverter… 9 Step 2 – Attaching the APsystems Microinverters to the
Racking………………………………… 9 Step 3 – Connecting the APsystems Microinverter Cables
to the AC bus cable………..10 Step 4 – Connecting APsystems Microinverters to the
PV Module………………………………11 Step 5 – Install a Bus Cable End Cap at the end of AC
bus cable……………………………….. 11 Step 6 – Installing the AC Branch Circuit Junction
Box………………………………………………….12 Step 7 – Completing the APsystems Installation
Map…………………………………………………….13
APsystems microinverter system operating instructions…………………………………….. 14
Troubleshooting……………………………………………………………………………………………………………15
Status Indications and Error Reporting……………………………………………………………………………………15
Troubleshooting a non-operating APsystems Microinverter……………………………………………….. 16
Technical Data…………………………………………………………………………………………………………………… 18
YC1000-3 3-Phase Microinverter Datasheet………………………………………………………………………….. 19
Wiring Diagram……………………………………………………………………………………………………………. 21
Sample Wiring Diagram – 208Y/120V Three Phase………………………………………………………………. 21
Sample Wiring Diagram – 480Y/277V Three Phase……………………………………………………………….22
YC1000-3 Accessory…………………………………………………………………………………………………… 23
Wiring Diagram…………………………………………………………………………………………………………………………… 23 Accessories
Summary…………………………………………………………………………………………………………………24
YC1000-3 Installation/User Manual
1
Important Safety Instructions
This manual contains important instructions to follow during installation and
maintenance of the APsystems Photovoltaic Grid-connected Inverter
(Microinverter). To reduce the risk of electrical shock and ensure the safe
installation and operation of the APsystems Microinverter, the following
symbols appear throughout this document to indicate dangerous conditions and
important safety instructions. SAVE THESE INSTRUCTIONS! This manual contains
important instructions for models YC1000-3-208/YC1000-3-480 that must be
followed during Installation and maintenance of the Photovoltaic Grid-
connected Inverter. Specifications subject to change without notice – please
ensure you are using the most recent update found at www.APsystems.com
This indicates a situation where failure to follow instructions may cause a
serious hardware failure or personnel danger if not applied appropriately. Use
extreme caution when performing this task.
This indicates information that is important for optimized Microinverter
operation. Follow these instructions closely.
Radio interference statement
FCC Compliance The equipment can comply with the limits for a class B digital
device, pursuant to part 15 of the FCC Rules, which are designed to protect
against harmful interference in a residential installation. The equipment
could radiate radio frequency energy and this might cause harmful interference
to radio communications if not following the instructions when installing and
using the equipment. But there is no guarantee that interference will not
occur in a particular installation. If this equipment causes harmful
interference to radio or television reception, the following measures might
resolve the issues: A) Relocate the receiving antenna and keep it well away
from the equipment. B) Consult the dealer or an experienced radio / TV
technical for help.Changes or modifications not expressly approved by the
party responsible for compliance may void the user’s authority to operate the
equipment.
YC1000-3 Installation/User Manual
2
Safety Instructions
Do NOT disconnect the PV module from the APsystems Microinverter without first
disconnecting the AC power.
Only qualified professionals should install and/or replace APsystems
Microinverters. Perform all electrical installations in accordance with local
electrical codes. Before installing or using the APsystems Microinverter,
please read all instructions and
cautionary markings in the technical documents and on the APsystems
Microinverter system and the solar-array. Be aware that the body of the
APsystems Microinverter is the heat sink and can reach a temperature of 80°C.
To reduce risk of burns, do not touch the body of the Microinverter. Do NOT
attempt to repair the APsystems Microinverter. If it fails, contact APsystems
Customer Support (206-855-5100) to
obtain an RMA number and start the replacement process. Damaging or opening
the APsystems Microinverter will void the warranty. Do NOT expose the
connection to directed, pressurized liquid (water jets, etc.). Do NOT expose
the connection to continuous immersion. Do NOT expose the AC connector to
continuous tension (e.g., tension due to pulling or bending the cable near the
connection). Use only the connectors and cables provided. Do NOT allow
contamination or debris in the connectors. Use the cable and connectors only
when all parts are present and intact. Use the terminator to seal the
conductor end of the Engage Cable; no other method is allowed. To reduce the
risk of fire, connect only to a circuit provided with 25 amperes maximum
branch circuit overcurrent protection in accordance with the National
Electrical Code, ANSI/NFPA 70. a) Both AC and DC voltagesource are terminated
inside thisequipment. Each circuit must beindividually disconnected before
servicing. b) When the photovoltaicarray is exposed to light, it supplies a DC
voltage to this equipment. Warrantyvoid if cover removed. This Utility-
InteractiveInverter contains activeanti-islanding protection(IEEE1547) and is
tested per FCC/IC.
YC1000-3 Installation/User Manual
3
APsystems YC1000-3 System Introduction
The APsystems Microinverter is used in utility-interactive grid-tied
applications, comprised of three key elements:
APsystems Microinverter APsystems Energy Communication Unit (ECU) APsystems
Energy Monitor and Analysis (EMA) web-based monitoring and analysis
system
PV Module
PV Module
Microinverter ECU
Branch J-box
Meter
Neutral
Ground AC Distribution Panel
Figure 1
YC1000-3 Installation/User Manual
4
APsystems YC1000-3 System Introduction
This integrated system improves safety; maximizes solar energy harvest;
increases system reliability, and simplifies solar system design,
installation, maintenance, and management.
APsystems Microinverters maximize PV energy production
The APsystems microinverter ensures top performance from the array by
maximizing the performance of the module within the array when PV modules in
the array are affected by shading.
More reliable than centralized or string inverters
The distributed microinverter system ensures that no single point of system
failure exists across the PV system. APsystems microinverters are designed to
operate at full power at ambient temperatures of up to +65°C (+149° F). The
inverter housing is designed for outdoor installation and complies with the
Type 6 environmental enclosure rating.
Simple to install
You can install individual PV modules in any combination of module quantity,
orientation, different type and power rate (check on-line module compatibility
or contact APsystems).
Smart system performance monitoring and analysis
The APsystems Energy Communication Unit (ECU) is installed by simply plugging
it into any wall outlet and providing it with an Ethernet or Wi-Fi connection
to a broadband router. After installing and setting the ECU (see ECU manual),
the full network of APsystems Microinverters automatically reports to the
APsystems Energy Monitor and analysis (EMA) web server. The EMA software
displays performance trends, informs you of abnormal events, and controls
system shutdown when it is needed.Reference the ECU Manual for installation
and operation instructions.
YC1000-3 Installation/User Manual
5
APsystems Three-phase Microinverter YC1000-3
The APsystems YC1000-3 Microinverters connect with the Three-phase grid, and
operate with most 60, 72, 84 and 96 cell PV modules. For more information,
please see the Technical Data page (p.16) of this manual.
Model Number
YC1000-3-208 YC1000-3-480
AC grid
208Y/120V 480Y/277V
PV Module
60,72,84,96 Cell 60,72,84,96 Cell
Module Connector
MC-4 Compatible or Customize MC-4 Compatible or Customize
YC1000-3 Installation/User Manual
6
APsystems Microinverter System Installation
A PV system using APsystems Microinverters is simple to install. Each
Microinverter easily mounts on the PV racking, directly beneath the PV
module(s). Low voltage DC wires connect from the PV module directly to the
Microinverter, eliminating the risk of high DC voltage. Installation MUST
comply with local regulations and technical rules.
Special Statement! An AC GFCI device should not be used to protect the
dedicated circuit to the APsystems microinverter even though it is an outside
circuit. None of the small GFCI devices (5mA-30 mA) are designed for back
feeding and will be damaged if back feed. In a similar manner, AC AFCIs have
not been evaluated for back feeding and may be damaged if back feed with the
output of a PV inverter.
Perform all electrical installations in accordance with local electrical
codes. Be aware that only qualified professionals should install and/or
replace APsystems
Microinverters. Before installing or using an APsystems Microinverter, please
read all instructions
and warnings in the technical documents and on the APsystems Microinverter
system itself as well as on the PV array. Be aware that installation of this
equipment includes the risk of electric shock. Do not touch any live parts in
the system, including the PV array, when the system has been connected to the
electrical grid.
Strongly recommend to install Surge protection Devices in the dedicated meter
box.
Additional Installation components from APsystems
Bus Cable End Cap (sold separately) Bus Cable T-CONN Cap ( sold separately)
Required Parts and Tools from you
In addition to your PV array and its associated hardware, you will need the
following items:
An AC connection junction box Mounting hardware suitable for module racking
Sockets and wrenches for mounting hardware Continuous grounding conductor and
grounding washers A Phillips screwdriver A torque wrench
The AC output is bonded to ground, but the neutral is not. Overcurrent
protection for the AC output circuit shall be provided in the end
installation. A disconnect switch shall be provided by others for the AC
output circuit. (May be required by local code or AHJ).
YC1000-3 Installation/User Manual
7
APsystems Microinverter System Installation
PV Rapid Shut Down Equipment
This product is PV Rapid Shut Down Equipment and conforms with NEC-2014 and
NEC-2017 section 690.12, for AC and DC conductors, when installed according to
the following requirements:
Microinverters and all DC connections must be installed inside the array
boundary. The array boundary is defined as 305 mm (1 ft.) from the array in
all directions, or 1 m
(3 ft.) from the point of entry inside a building. This rapid shutdown system
must be provided with an initiating device and (or with) status indicator
which must be installed in a location accessible to first responders, or be
connected to an automatic system which initiates rapid shutdown upon the
activation of a system disconnect or activation of another type of emergency
system. The initiator shall be listed and identified as a disconnecting means
that plainly indicates whether it is in the “off” or “on” position. Examples
are:
Service disconnecting means PV system disconnecting means Readily accessible
switch or circuit breaker The handle position of a switch or circuit breaker
is suitable for use as an indicator. Refer to NEC for more information.
Additionally, in a prominent location near the initiator device, a placard or
label must be provided with a permanent marking including the following
wording: ‘PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN’ The term
PHOTOVOLTAIC’ may be replaced with
PV.’ The label requires reference NEC
690.65 to meet the audit requirements.
YC1000-3 Installation/User Manual
8
Installation Procedures
APsystems Microinverters are designed to only operate when they can sense
power coming from the grid. Even if they are plugged into the solar array,
they will not turn themselves on until they can read power from the grid.
Do NOT connect APsystems Microinverters to the utility grid or energize the AC
circuit until you have completed all of the installation procedures as
described in the following sections.
Step 1 – Lay the AC bus according to the arrangement of APsystems
Microinverter.
Step 2 – Attaching the APsystems Microinverters to the Racking.
Figure 2
a. Mark the location of the Microinverter on the rack, with respect to the PV
module junction box or any other obstructions.
b. Mount one Microinverter at each of these locations using hardware
recommended by your module racking vendor.
Prior to installing any of the microinverters, verify that the utility voltage
at the point of common connection matches the voltage rating on microinverter
label.
Do not place the inverters (including DC and AC connectors) Where exposed to
the sun, rain or snow, even gap between modules. Allow a minimum of
3/4”(1.5cm.) between the roof and the bottom of the Microinverter to allow
proper air flow.
YC1000-3 Installation/User Manual
9
Installation Procedures
Step 3 – Connecting the APsystems Microinverter Cables to the AC bus cable.
Click
Cover all unused T connectors with Bus Cable T-CONN Cap to protect the T connectors.
Figure 3
AC connector interface as follows, from left to right PE, N, L3, L2, L1.
PE N L3 L2 L1
Figure 4 Figure 5
YC1000-3 Installation/User Manual
10
Installation Procedures
Step 4 – Connecting APsystems Microinverters to the PV Module.
Place the PV modules into position on the racking and connect the DC input
cables to the microinverters based on optimum layout configuration (up to four
PV modules per microinverter).
CH4 CH3 CH2 CH1
Figure 6
The status LED for on each microinverter will blink green three (3) times to indicate normal operation once DC power is applied. It is important to understand that this “start up” sequence occurs once the first module is connected to the microinvert and is successfully generating DC power. The “start up” sequence does NOT reoccur as additional modules are connected to the same microinverter.
Step 5 – Install a Bus Cable End Cap at the end of AC bus cable.
aWire stripping
cInsert five wires into the core wires hole of the body.
bSet the parts on the cable.
dInsert seal and Clamp Finger into the body ,then tighten the nut, torque 2.5±0.5NM.
Figure 7
YC1000-3 Installation/User Manual
11
Installation Procedures
Step 6 – Installing the AC Branch Circuit Junction Box.
Figure 8
a. Install an appropriate junction box at a suitable location on the PV
racking system (typically at the end of a branch of modules).
b. Connect the open wire end of the AC bus cable into the junction box using
an appropriate gland or strain relief fitting.
c. Wire the conductors of the AC bus: L1- BLACK; L2 – RED; L3 – BLUE; N –
WHITE; PE GREEN.
d. Connect the AC branch circuit junction box to the point of utility
Interconnection.
The neutral line from the inverter is NOT allowed to be floating, MUST be
connected to grid.
Wiring colour code can be different according local regulation, check all the
wires of the installation before connecting to the AC bus to be sure they
match.Wrong cabling can damage irreparably the microinverters, such an issue
is not covered by the warranty.
Double check to make sure all of the AC and DC wiring has been correctly
installed. Ensure that none of the AC and/or DC wires are pinched or damaged.
Make sure that all of the junction boxes are properly closed.
APsystems YC1000-3 Installation/User Manual
12
Installation Procedures
Step 7 – Completing the APsystems Installation Map
Fill in the APsystems Warranty Cards, which provide system information and the
installation map. Feel free to provide your own layout if a larger or more
intricate installation map is required. The layout map provided is designed to
accommodate labels in vertical or horizontal orientation to meet all the field
PV connections.
a. Each APsystems microinverter has removable serial number labels. Peel
labels off, and affix one to the respective location on the APsystems
installation map, and affix another to the PV module frame which is easy to
see.The warranty cards can be obtained from the appendix of this manual or
APsystems website: www.APsystems.com
b. Fill out the warranty cards and email to APsystems at
support@APsystems.com. c. Register the system using your Installer Account on
the APsystems EMA. You can
then use the EMA website to view detailed performance of the PV system.
Figure 9
1. Step 17 can change sequence for convenience of installation. 2.
Installation card is located in Appendix last page of this manual.
YC1000-3 Installation/User Manual
13
APsystems microinverter system operating instructions
To operate the APsystems microinverter PV system:
1. Turn ON the AC circuit breaker on each microinverter AC branch circuit. 2.
Turn ON the main utility-grid AC circuit breaker. Your system will start
producing power after a five-minute safety delay period. 3. The APsystems
microinverters will start to send performance data over wireless to the ECU.
The time required for all the microinverters in the system to report to the
ECU will vary with the number of microinverters in the system. You can verify
proper operation of the APsystems microinverters via the ECU. See the ECU
Installation and Operation Manual for more information.
YC1000-3 Installation/User Manual
14
Troubleshooting
Qualified personnel can use the following troubleshooting steps if the PV
system does not operate correctly:
Status Indications and Error Reporting
Start up LED
Three (3) short green blinks, when DC power is first applied to the
microinverter, indicates a successful microinverter start up. It is important
to understand that this “start up” sequence occurs once the first module is
connected to the microinvert and is successfully generating DC power.
The”start up” sequence does NOT reoccur as additional modules are connected to
the same microinverter.
Operation LED
Flashing Slow Green (10 sec. gap) – Producing power and communicating with ECU
Flashing Fast Green (2 sec. gap) – Producing power and not communicating with
ECU over 60 minutes Flashing Red – Not producing power Steady Red – Electrode
assembly ground fault protection
Other Faults
All other faults are reported to the ECU. Refer to the ECU Installation and
Operation Manual for a list of additional faults and troubleshooting
procedures.
Only qualified personnel should directly handle the APsystems Microinverter.
. Never disconnect the DC wire connectors under load. Ensure that no current
is flowing in the DC wires prior to disconnecting.
. Always disconnect AC power before disconnecting the PV module wires from the
APsystems Microinverter.
. The APsystems Microinverter is powered by DC current of the PV module. AFTER
reconnecting DC, please check that the LED behaves as in 6.1.1 above.
YC1000-3 Installation/User Manual
15
Troubleshooting
Troubleshooting a non-operating APsystems Microinverter
To troubleshoot a non-operating APsystems Microinverter, Follow the steps
below in order:
1. Verify the utility voltage and frequency are within ranges shown in the
Technical Data section of this manual.
2. Check the connection to the utility grid. Verify utility power is present
at the inverter in question by removing AC, then DC power. Never disconnect
the DC wires while the microinverter is producing power. Re-connect the DC
module connectors and watch for three short LED flashes.
3. Check the AC branch circuit interconnection between all the
microinverters. Verify each inverter is energized by the utility grid as
described in the previous step.
4. Make sure that any AC breaker are functioning properly and are closed. 5.
Check the DC connections between the microinverter and the PV module. 6.
Verify the PV module DC voltage is within the allowable range shown in the
Technical
Data of this manual. 7. If the problem persists, please call APsystems
Technical Support.
Do not attempt to repair the APsystems microinverter. If troubleshooting
methods fail, please call APsystems Customer Support.
YC1000-3 Installation/User Manual
16
Replace a microinverter
Qualified personnel can use the following troubleshooting steps if the PV
system does not operate correctly:
Follow the procedure to replace a failed APsystems Microinverter.
A. Remove the APsystems microinverter from the PV Module, in the following
order: 1. Disconnect the AC by turning off the branch circuit breaker. 2.
Cover the module with an opaque cover. 3. Disconnect the first AC connector in
the branch circuit. 4. Disconnect the PV module DC wire connectors from the
microinverter. 5. Remove the Microinverter from the PV array racking.
B. Remove the opaque cover, install a replacement Microinverter to the rack.
Remember to observe the flashing LED light as soon as the new Microinverter is
plugged into the DC cables.
C. Connect the AC cable of the replacement Microinverter.
D. Close the branch circuit breaker, and verify operation of the replacement
Microinverter.
YC1000-3 Installation/User Manual
17
Technical Data
. Be sure to verify the voltage and current specifications of your PV module.
It should match with those of the Microinverter. Please refer to the datasheet
or usermanual which can be download from APsystems website www.APsystems.com.
. You must match the DC operating voltage range of the PV module with the
allowable input voltage range of the APsystems Microinverter. . The maximum
open circuit voltage of the PV module must not exceed the specified maximum
input voltage of the APsystems.
YC1000-3 Installation/User Manual
18
YC1000-3 3-Phase Microinverter Datasheet
Region
Input Data (DC)
MPPT Voltage Range
PV Module Compatibility
Operation Voltage Range Maximum Input Voltage Startup Voltage Maximum Input
Current
Output Data (AC)
3-Phase Grid Type Rated Output Power Maximum Output Power Maximum Output
Current Nominal Output Voltage/Range Adjustable Output Voltage Range Nominal
Output Frequency/Range Adjustable Output Frequency Range
Maximum output fault current (ac) and duration
Power Factor
Total Harmonic Distortion Maximum Units per Branch
Efficiency
Peak efficiency
CEC Weighted efficiency Nominal MPPT efficiency
Night Power Consumption Utility interconnection voltage and frequency trip
limits and trip times
Voltage
Trip limit and trip time accuracy
Frequency Alternate Trip Time
Mechanical Data
Operating Ambient temperature range
Storage Temperature Range Dimensions (W x H x D)
AC Bus Cable Weight Enclosure rating
Cooling
USA / Canada
16V-55V 60-cell / 120 split-cell and 72-cell / 144 split-cell PV modules,
including bi-facial 16V-55V
60V 22V
14.8A x 4
208Y/120V
480Y/277V
208Y/120V 900W 1130W
480Y/277V 900W 1130W
3.14Ax3 120V×3/105.6V-132V
1.35Ax3 277V×3/243.8V-304.7V
82V-152V 60Hz/59.3Hz-60.5Hz
55.1Hz-64.9Hz 124.23 Apk, 12.10ms of duration,4.97 Arms, over 3
cycles >0.99
190V-350V 60Hz/59.3Hz-60.5Hz
55.1Hz-64.9Hz
6.57 Apk, 40 ms of duration , 1.32 Arms, over 3 cycles
0.99
<3% 3units per 15AX3 AC breaker
<3% 8units per 15AX3 AC breaker
95.5% 95% 99.9% 300mW
+/- 5% but not less than 160ms
+/- 2VL-N +/- 0.05 Hz
See NOTE 1 below
-40 oC to +65 oC (-40 oF to +149 oF) -40 oC to +85 oC (-40 oF to +185 oF) 259mm X 242mm X 36mm (10.2″ X 9.5″ X 1.4″)
14AWG 3.5kg/7.7lbs
Type 6 Natural Convection – No Fans
YC1000-3 Installation/User Manual
19
YC1000-3 3-Phase Microinverter Datasheet
Features
Communication Transformer Design
Integrated ground
Compliance NEC Compliance
Wireless Zigbee, 2.4GHz High Frequency Transformers, Galvanically Isolated The
DC circuit meets the requirements for ungrounded PV arrays in NEC690.35.
Equipment ground is provided by the PE in the AC cable. No additional ground
is required. Ground fault protection
(GFP) is integrated into the microinverter. UL-1741* / IEEE-1547, FCC Part 15
Class B, ICES-003 Class B NEC 2014, 2017 and 2020 690.12 for Rapid Shutdown /
Module Level
Shutdown, CAN / CSA-C22.2 NO. 107.1
*Meets the standard requirements for Distributed Energy Resources (UL 1741) and identified with the CSA Listed Mark
Note 1: Utility Interconnection Voltage and Frequency Trip Limits and Trip Times
Condition
A B C D E F
Voltage and frequency limits for utility Interaction
Simulated utility source
Maximum time (sec) (cycles) at 60 Hza before
Voltage (V) < 0.50 Vnor
Frequency (Hz) Rated
cessation of current to the simulated utility 80ms
0.50 Vnor V < 0.88
Rated
200ms
Vnor
1.10 Vnor < V < 1.20 Vnor
Rated
200ms
1.20 Vnor V
Rated
80ms
Rated
f > 60.5
160ms
Rated
f < 59.3
160ms
*Programmable through ECU in field to meet customer need. **Depending on the local regulations.
Specifications subject to change without notice – please ensure you are using
the most recent update found at www.APsystems.com
© All Rights Reserved
2021/8/10 REV4.1
YC1000-3 Installation/User Manual
20
Wiring Diagram
Sample Wiring Diagram – 208Y/120V Three Phase
SOLAR PANEL
YC1000-3
BRANCH END CAP INSTALLED ON THE END OF AC BUS CABLE
ECU
ENERGY COMMUNICATION UNIT
METER
TO METER OR AC DISTRIBUTION PANEL
AC BUS CABLE
BLACK – L1 RED – L2 BLUE – L3 WHITE – N GREEN – PE
AC JUNCTION BOX
15 AMP CIRCUIT BREAKER PER
BRANCH CIRCUIT
NEUTRAL
GROUND
DISTRIBUTION PANEL 120V/ 208V THREE PHASE
Figure 11
APsystems YC1000-3 Installation/User Manual
21
Wiring Diagram
Sample Wiring Diagram – 480Y/277V Three Phase
SOLAR PANEL
YC1000-3
BRANCH END CAP INSTALLED ON THE END OF AC BUS CABLE
ECU
ENERGY COMMUNICATION UNIT
METER
TO METER OR AC DISTRIBUTION PANEL
AC BUS CABLE
BLACK – L1 RED – L2 BLUE – L3 WHITE – N GREEN – PE
AC JUNCTION BOX
NEUTRAL
15 AMP CIRCUIT BREAKER PER
BRANCH CIRCUIT
GROUND
DISTRIBUTION PANEL 277V/ 480V THREE PHASE
Figure 12
YC1000-3 Installation/User Manual
22
YC1000-3 Accessory
Wiring Diagram
6AC Connector (Male)
7AC Connector (Female)
2Bus Cable End Cap
3Bus Cable T-CONN Cap
5DC Female Connector Cap 4DC Male Connector Cap
Grid 1Bus Cable
8DC Extension Cable
YC1000-3 Installation/User Manual
23
Accessories Summary
Category
Part NO.
Name
Pic
Bus Cable 1
Mandatory
2322302552 2322402552
5-wire Bus Cable(14AWG,TC-ER,2m, BK-RD-BU-WT-GN) 5-wire Bus Cable(14AWG, TC- ER,4m, BK-RD-BU-WT-GN)
Bus Cable End Cap 2
Mandatory Bus Cable T-CONN Cap 3
Optional DC Male Connector Cap 4
Optional DC Female Connector 5
CapOptional AC Connector (Male) 6
Optional AC Connector (Female) 7
Optional
2062050005 2061252032 2060401006 2060402006 2300711032 2300812032
5-wire Bus Cable End Cap 5-wire Bus Cable T-CONN Cap DC Male Connector CapMC4 DC Female Connector CapMC4 25A AC Male Connector (EN,5-wire) 25A AC Female Connector (EN,5-wire)
DC Extension Cable 8
Optional
2310310274 2310360214
1m DC Extension CableMC4 2m DC Extension CableMC4
YC1000-3 Installation/User Manual
24
APsystems Microinverter &Energy Communication Unit Installation Card
The APsystems Installation Map is a diagram of the physical location of each
microinverter in your PV installation. Each APsystems microinverter has a
removable serial number label located on the mounting plate. Peel the label
and affix it to the respective location on the APsystems installation map.
Installation Map Template
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 A
B
C
YC1000-3 Installation/User Manual
25