APsystems DS3 DS3 Series Microinverter Instruction Manual
- June 3, 2024
- APsystems
Table of Contents
- APsystems DS3 DS3 Series Microinverter
- Important Safety Instructions
- APsystems Microinverter System Introduction
- APsystems Microinverter DS3 Series Introduction
- APsystems Microinverter System Installation
- APsystems microinverter system operating instructions
- Troubleshooting
- Replace a microinverter
- Technical Data
- Wiring Diagram
- APsystems Microinverters Installation Map
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
APsystems DS3 DS3 Series Microinverter
Important Safety Instructions
This manual contains important instructions to follow during installation and
maintenance of the APsystems Photovoltaic Grid-connected Microinverter. To
reduce the risk of electrical shock and ensure a safe installation and
operation of the APsystems Microinverter, the following symbols appear
throughout this document to indicate dangerous conditions and important safety
instructions.
Specifications are subject to change without notice. Please ensure you are
using the most recent update found at
https://usa.apsystems.com/resources/library/ or
https://canada.apsystems.com/resources/library/
Warning
This indicates a situation where failure to follow instructions may cause a
serious hardware failure or personnel danger if not applied appropriately. Use
extreme caution when performing this task.
Notice
This indicates information that is important for optimized microinverter
operation. Follow these instructions closely.
Safety Instructions
-
Do NOT disconnect the PV module from the APsystems Microinverter without first disconnecting the AC power.
-
Only qualified professionals should install and/or replace APsystems Microinverters.
-
Perform all electrical installations in accordance with local electrical codes.
-
Before installing or using the APsystems Microinverter, please read all instructions and cautionary markings in the technical documents and on the APsystems Microinverter system and the solar-array.
-
Be aware that the body of the APsystems Microinverter is the heat sink and can reach a temperature of 80°C. To reduce risk of burns, do not touch the body of the Microinverter.
-
Do NOT attempt to repair the APsystems Microinverter. If it fails, contact APsystems Customer Support to obtain an RMA number and start the replacement process. Damaging or opening the APsystems Microinverter will void the warranty.
-
Caution!
The external protective earthing conductor is connected to the inverter protective earthing terminal through AC connector. When connecting, connect the AC connector first to ensure the inverter earthing then do the DC connections. When disconnecting, disconnect the AC by opening the branch circuit breaker first but maintain the protective earthing conductor in the branch circuit breaker connect to the inverter ,then disconnect the DC inputs. -
Please install AC breakers on the AC side of the inverter.
-
CAUTION – Hot surfaces – To reduce the risk of burns – Do not touch. Risk of electric shock-(a) both ac and dc voltage source are terminated inside this equipment. Each circuit must be individually disconnected before servicing, and (b) When the photovoltaic array is exposed to light, it supplies a dc voltage to this equipment. Warranty void if cover removed. No user serviceable parts inside.Refer servicing to qualified service personnel. This inverter has an integral ground-fault detector / interrupter (GFDI).This Utility-InteractiveInverter contains active anti-islanding protection(IEEE1547) and is tested per FCC/IC.
Radio Interference Statement
This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
- Reorient or relocate the receiving antenna.
- Increase the separation between the equipment and receiver.
- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
- Consult the dealer or an experienced radio/TV technician for help.
Warning
RF exposure warning
This equipment must be installed and operated in accordance with provided
instructions and the antenna(s) used for this transmitter must be installed to
provide a separation distance of at least 20 cm from all persons and must not
be co-located or operating in conjunction with any other antenna or
transmitter. End-users and installers must be provide with antenna
installation instructions and transmitter operating conditions for satisfying
RF exposure compliance.
Symbols in lieu of words
- Trademark.
- Caution, risk of electric shock.
- Caution, hot surface.
- NOTICE, danger!This device directly connected with electricity generators and public grid.
- Qualified personnel
Person adequately advised or supervised by an electrically skilled person to enable him or her to perceive risks and to avoid hazards which electricity can create. For the purpose of the safety information of this manual, a “qualified person” is someone who is familiar with requirements for safety, electrical system and EMC and is authorized to energize, ground, and tag equipment, systems, and circuits in accordance with established safety procedures. The inverter and photovoltaic system may only be commissioned and operated by qualified personnel.
Warning
English Warning Statement:
This device complies with Industry Canada license-exempt RSS standard(s).
Operation is subject to the following two conditions:
- This device may not cause interference, and
- This device must accept any interference, including interference that may cause undesired operation of the device.
APsystems Microinverter System Introduction
The APsystems Microinverter is used in utility-interactive grid-tied applications, comprised of three key elements:
- APsystems Microinverter
- APsystems Energy Communication Unit (ECU)
- APsystems Energy Monitor and Analysis (EMA) web-based monitoring and analysis system
This integrated system improves safety; maximizes solar energy harvest; increases system reliability, and simplifies solar system design, installation, maintenance, and management.
Safety with APsystems Microinverters
In a typical string inverter installation, PV modules are connected in series.
The voltage adds-up to reach high voltage value (from 600Vdc up to 1000Vdc) at
the end of the PV string. This extreme high DC voltage brings a risk of
electrical shocks or electrical arcs which could cause fire.
When using an APsystems microinverter, PV modules are connected in parallel.
Voltage at the back of each PV module never exceeds PV modules Voc, which is
lower than 60Vdc for most of PV modules used with APsystems microinverters.
This low voltage is considered “safe to touch” by fire departments and negates
the risk of electrical shock, electrical arcs and fire hazards.
APsystems Microinverters maximize PV energy production
Each PV module has individual Maximum Peak Power Tracking (MPPT) control,
which ensures that the maximum power is produced to the utility grid
regardless of the performance of the other PV modules in the array. When PV
modules in the array are affected by shade, dust, different orientation, or
any situation in which one module underperforms compared with the other units,
the APsystems Microinverter ensures top performance from the array by
maximizing the performance of each module individually within the array.
More reliable than centralized or string inverters
The distributed APsystems Microinverter system ensures that no single point of
system failure exists across the PV system. APsystems Microinverters are
designed to operate at full power at ambient outdoor temperatures of up to 65
deg C (or 149 F). The inverter case is designed for outdoor installation and
complies with the Type 6 environmental enclosure rating.
Simple to install
APsystems Microinvertes are compatible with most of 60 and 72 cell PV modules
or 120 and 144 half-cut cells PV modules. (In order to confirm compatibility
of PV module with APsystems microinverter, feel free to check our online
“E-decider” module compatibility tool or contact your local APsystems
Technical Support).
Installation requires a minimum number of accessories and microinverters offer
a lot of versatility to the installer: microinverters can indeed be installed
on different roofs with different orientation or with modules having different
orientation.
In the same way, end-users can extand their system whenever they want with
microinverters.
Smart system performance monitoring and analysis
The APsystems Energy Communication Unit (ECU) is installed by simply plugging
it into any wall outlet and providing an Ethernet or Wi-Fi connection to a
broadband router or modem. After installing and setting the ECU (see ECU
Instruction Manual), the full network of APsystems Microinverters
automatically reports to the APsystems Energy Monitor and Analysis (EMA) web
server.
APsystems Microinverter DS3 Series Introduction
APsystems’3rd generation of dual-module microinverters, the DS3 product family
represents the culmination of years of power conversion expertise and
innovation in high-efficiency, high-density power conversion to maximize the
peak performance of today’s high-capacity PV modules.
The DS3 series reaches unprecedented levels of power output and is fully
backwards compatible with QS1 and YC600 microinverters and accessories. It
features 2 input channels, each with independent MPPT, and encrypted wireless
ZigBee communication. An innovative and compact design makes the product
lighter while maximizing power production, and silicone-encapsulated
components reduce stress on electronics, facilitate thermal dissipation, and
enhance weatherproofing. Reliability is significantly increased thanks to 20%
fewer components than previous generations. A 24/7 energy access through apps
or web based portal facilitate remote diagnosis and maintenance.
The DS3 series is grid-interactive and fully compliant with CA Rule 21
requirements. With its unparalleled performance, efficiency of 97.3%, and
increased reliability, the APsystems DS3 series is a gamechanger for
residential and commercial solar.
Key Product Feature:
- One microinverter connects to two solar modules
- Max output power reaching 640VA, 768VA or 880VA
- Two independent input channels (MPPT)
- CA Rule 21 (UL 1741 SA) compliant
- NEC 2020 690.12 Rapid Shutdown Compliant
- Encrypted Wireless ZigBee Communication
- Phase Monitored and Phase Balanced
APsystems Microinverter System Installation
A PV system using APsystems Microinverters is simple to install. Each
Microinverter easily mounts on the PV racking, directly beneath the PV
module(s). Low voltage DC wires connect from the PV module directly to the
Microinverter, eliminating the risk of high DC voltage. Installation MUST
comply with local regulations and technical rules.
Special Statement: we advise installation of an RCD breaker only if required
by the local electrical code.
Warning
- Perform all electrical installations in accordance with local electrical codes.
- Be aware that only qualified professionals should install and/or replace APsystems Microinverters.
- Before installing or using an APsystems Microinverter, please read all instructions and warnings in the technical documents and on the APsystems Microinverter system itself as well as on the PV array.
- Be aware that installation of this equipment includes the risk of electric shock.
- Do not touch any live parts in the system, including the PV array, when the system has been connected to the electrical grid.
Notice
Even if not required by local electrical code, we strongly recommend to
install surge protection devices in the dedicated AC box.
Additional accessories supplied by APsystems
- AC Y3 Bus cable
- AC Y3 Bus Cable End Cap
- AC Y3 Bus Cable Y-CONN Cap
- AC Y3 Bus Cable Unlock Tool
- ECU
- AC connectors male/female
Other required accessories not supplied by APsystems
In addition to your PV array and its associated hardware, you may need the following items:
- An AC connection junction box
- Mounting hardware suitable for module racking
- Sockets and wrenches for mounting hardware
PV Rapid Shut Down Equipment
This product is PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12, for AC and DC conductors, when installed according to the following requirements:
- Microinverters and all DC connections must be installed inside the array boundary.
- The array boundary is defined as 305 mm (1 ft.) from the array in all directions, or 1 m (3 ft.) from the point of entry inside a building.
This rapid shutdown system must be provided with an initiating device and (or
with) status indicator which must be installed in a location accessible to
first responders, or be connected to an automatic system which initiates rapid
shutdown upon the activation of a system disconnect or activation of another
type of emergency system.
The initiator shall be listed and identified as a disconnecting means that
plainly indicates whether it is in the “off” or “on” position. Examples are:
- Service disconnecting means
- PV system disconnecting means
- Readily accessible switch or circuit breaker
The handle position of a switch or circuit breaker is suitable for use as an
indicator. Refer to NEC for more information.
Additionally, in a prominent location near the initiator device, a placard or
label must be provided with a permanent marking including the following
wording:
’PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN’ The term ‘PHOTOVOLTAIC’ may
be replaced with ‘PV.’
The label requires reference NEC 690.65 to meet the audit requirements.
Installation Procedures
- Step 1 – Verify that grid voltage matches microinverter rating
- Step 2 – Y3 AC Bus Cable distribution
- Each connector drop of the AC Bus cable matches the position of the microinverter.
- One end of the AC bus cable is used to access the junction box into the power grid.
- Wire the conductors of the AC bus: L1 – BLACK ; L2 – RED;PE – GREEN.
Warning
Wiring color code can be different according to local regulations. Check all
the wires of the installation before connecting to the AC bus to be sure they
match. Improper cabling can irreparably damage the microinverters: such damage
is not covered by the warranty.
Warning
Do NOT carry the microinverter by the AC cable. This may cause the AC cable to
partially or fully disconnect from the unit, resulting in no or poor
operation.
- Step 3 – Attach the APsystems Microinverters to the Racking
- Mark the location of the microinverter on the rack, with respect to the PV module junction box or any other obstructions.
- Mount one microinverter at each of these locations using hardware recommended by your module racking vendor.
-
Step 4 – Ground the system
Y3 AC Bus cable has an embedded PE wire: this might be sufficient to ensure proper grounding of the whole PV array. However, in areas with special grounding requirements, external grounding work may still be needed, using the grounding lug supplied with the Microinverter.
-
Step 5 – Connect the APsystems microinverter to AC bus cable
Insert the microinverter AC connector into the trunk cable connector. Make sure to hear the “click” as a proof of robust connection.
Best Practice: Use the AC Bus Cable Unlock Tool to disconnect the connectors.
Notice
Check the microinverter technical data page 19 to confirm maximum allowable
number of microinverters on each AC branch of the circuit.
AC connector interface as from left to right.Cover any unused connectors with Bus Cable
Y-CONN Cap to protect the unused connectors.
-
Step 6 – Install a Bus Cable End Cap at the end of AC bus cable
-
Step 7 – Connect APsystems Microinverters to the PV Modules
Notice
When plugging in the DC cables, the microinverter should immediately blink
green ten times. This will happen as soon as the DC cables are plugged in and
will show that the microinverter is functioning correctly. This entire check
function will start and end within 10 seconds of plugging in the unit, so pay
careful attention to these lights when connecting the DC cables.
Warning
Double check to make sure all of the AC and DC wiring has been correctly
installed. Ensure that none of the AC and/or DC wires are pinched or damaged.
Make sure that all of the junction boxes are properly closed.
Warning
Each PV panel must be carefully connected to the same channel.
Make sure to not split positive and negative DC cables into two different
input channels: microinverter will become damaged and warranty will not apply.
- Step 8 – Connect APsystems Microinverters to Grid
Notice
- Please install bi-polar circuit breakers with proper rated current or according to the local regulation, which are mandatory to connect to grid.
- Leakage current breakers or AFCI/GFCI breakers are not recommended to install.
-
Step 9 – AC Extension Cable
-
Step 10 – Complete the APsystems installation map
- Each APsystems Microinverter has 2 removable serial number labels.
- Complete the installation map by sticking the ID label of each microinverter in the right location.
- The second serial number label, could be stuck on the solar module frame, which could help later to confirm the position of the microinverter without dismantling the PV module.
Notice
- The layout of the microinverters’ serial number installation map is only suitable for a typical installation.
- Installation Map is available in the last page appendix of this manual.
- Use ECU_APP (available in the EMA Manager) to scan the serial numbers on the map when setting up the ECU (see ECU instruction manual for more info).
APsystems microinverter system operating instructions
To operate the APsystems microinverter PV system:
- Turn ON the AC circuit breaker on each microinverter AC branch circuit.
- Turn ON the main utility-grid AC circuit breaker. Your system will start producing power after approximately one minute of waiting time.
- Microinverter data will be available in the EMA Manager APP or in the EMA web portal. Alternatively, LED sequences could be an indicator of microinverters status (see section 6.1)
Notice
Once the ECU has been commissioned properly, the APsystems Microinverters
will start to send performance data to the ECU. The time required for all of
the Microinverters in the system to report to the ECU will vary depending on
the number of Microinverters in the system.
Troubleshooting
Qualified personnel can use the following troubleshooting steps if the PV system does not operate correctly:
Status Indications and Error Reporting
Assuming they are easily accessible and visible, Operation LEDs can give a good indication of the microinverters status
Start up LED
Ten short green blinks when DC power is first applied to the Microinverter
indicates a successful Microinverter startup.
Operation LED
Flashing Slow Green (5 sec. gap) – Producing power and communicating with ECU
Flashing Slow Red (5 sec. gap) – Not producing power
Flashing Fast Green (2 sec. gap) – Not communicating with ECU over 60mins, but
still producing power.
Flashing Fast Red (2 sec. gap) – Not communicating with ECU over 60mins and
not producing power.
Steady Red – default, DC side ground fault protection, see 6.1.3
GFDI Error
A solid red LED indicates the Microinverter has detected a Ground Fault
Detector Interrupter (GFDI) error in the PV system. Unless the GFDI error has
been cleared, the LED will remain red and the ECU will keep reporting the
fault. Please contact your local APsystems Technical Support.
ECU_APP
Psystems ECU_APP (available in the EMA Manager APP) is the recommended tool to do on-site troubleshooting. When connecting the ECU_APP to the ECU hotspot (please check ECU User Manual for more detailed information), installer can check every microinverter status (production, communication) but also ZigBee signal strength, grid profile and other insightful data helping the troubleshooting.
Installer EMA (web portal or EMA Manager APP)
Before going on site for troubleshooting, installer can also check all information remotely using his installer account, either on the web or using the EMA Manager APP (see EMA Manager APP User Manual for more detailed information). Having access to module data (DC, AC, voltages and currents) gives the first indication on potential issues.
Trouble Shooting Guide
Professional installers can also refer to our Troubleshooting Guide
(https://usa.apsystems.com/resources/library/ or
https://canada.apsystems.com/resources/library/, section libraries) for more
in depth guidelines on how to troubleshoot and fix PV installations powered by
APsystems microinverters.
APsystems Technical Support
The APsystems local Technical Support team is available to support professional installers in becoming familiar with our products and to troubleshoot installations when needed.
Warning
Do not attempt to repair APsystems Microinverters. Please contact your local
APsystems Technical Support.
- Never disconnect the DC wire connectors under load. Ensure that no current is flowing in the DC wires prior to disconnecting.
- Always disconnect AC power before disconnecting the PV module wires from the APsystems Microinverter.
- The APsystems Microinverter is powered by PV module DC power. AFTER disconnecting the DC power, when reconnecting the PV modules to the Microinverter, be sure to watch for the quick red light followed by ten short green LED flashes.
Maintenance
APsystems microinverters do not require any specific regular maintenance.
Replace a microinverter
Follow the procedure to replace a failed APsystems Microinverter
- Disconnect the APsystems Microinverter from the PV Module, in the order shown below:
- Disconnect the AC by turning off the branch circuit breaker.
- Disconnect the inverter AC connector from the AC Bus.
- Disconnect the PV module DC wire connectors from the microinverter.
- Remove the Microinverter from the PV array racking.
- Install a replacement Microinverter to the rack. Remember to observe the flashing green LED light as soon as the new Microinverter is plugged into the DC cables.
- C. Connect the AC cable of the replacement Microinverter to the AC bus.
- Close the branch circuit breaker, and verify proper operation of the replacement Microinverter.
- Update the microinverter in the EMA Manager through the “Replace” function and update the system’s map with new serial number labels.
Technical Data
For technical data, please refer to the datasheet.
Warning
- Be sure to verify that the voltage and current specifications of your PV module are compatible with the range allowed on APsystems Microinverter. Please check the microinverter datasheet.
- DC operating voltage range of the PV module must be within allowable input voltage range of the APsystems Microinverter.
- The maximum open circuit voltage of the PV module must not exceed the specified maximum input voltage of the APsystems.
Wiring Diagram
Sample Wiring Diagram – Split Phase
APsystems Microinverters Installation Map
The APsystems Installation Map is a diagram of the physical location of each
microinverter in your PV installation. Each APsystems microinverter has two
serial number labels. Peel the one label and affix it to the respective
location on the APsystems installation map.
Installation Map Template
Installer:| PV module type: Qty:|
Sheet of | N
---|---|---|---
Owner:| Microinverter type: Qty:
| Column 1| Column 2| Column 3| Column 4| Column 5| Column 6| Column 7
Row 1| | | | | | |
Row 2| | | | | | |
Row 3| | | | | | |
Row 4| | | | | | |
Row 5| | | | | | |
Row6| | | | | | |
Row 7| | | | | | |
Row 8| | | | | | |
Row 9| | | | | | |
Row10| | | | | | |
References
- APsystems Canada | The global leader in multi-platform MLPE technology
- APsystems USA | The global leader in multi-platform MLPE technology
- Document Library - APsystems USA | The global leader in multi-platform MLPE technology
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>