ZALMAN Z1 NEO ATX Mid Tower Computer Case Installation Guide
- June 5, 2024
- ZALMAN
Table of Contents
ZALMAN Z1 NEO ATX Mid Tower Computer Case
Cautionary Note
- Please read this manual thoroughly prior to installation.
- Before installing, check the components and condition of the product, and if any problem is found, contact the retailer.
- Please wear gloves while handling this product to prevent injuries.
- Incorrect cable connections may cause short circuits leading to fire hazards.
- Do not block the front intake vent or the rear exhaust vent.
- Keep this unit away from heat sources, direct sunlight, water, oil and place the unit on a flat and well-ventilated area.
- Do not clean the product surface with chemicals or wet cloth. (chemicals: industrial alcohol, pait thinner and organic solvent etc.)
- Avoid inserting objects or hands into the system while it is in operation to prevent product damage and injuries.
- Zalman Tech Co., Ltd. is not responsible for any improper use.
- Product design and specifications may be revised to improve quality and performance.
Components
Contents
Front I/O Ports
| Part| #| Part
---|---|---|---
①| Power Button| ②| Reset Button
③| Mic| ④| Headphones
⑤| USB 2.0 Ports| ⑥| USB 3.0 Port
Installation
- Side Panel Removal
- Motherboard Installation
There are 6 Stand-offs preinstalled.Please refer to the diagrams below for additional Stand Off positions (based on motherboard type).
- 5.25” Drive Installation
- Front Cover Removal
- ODD Installation
- 3.5”, 2.5” HDD Installation
- Install the Drive on HDD tray then remove the HDD Tray as shown in the figure. Install the tray on the drive.
- Install the Drive on HDD tray
- Tips
- When transporting an assembled system,please secure the HDD with Bolt as shown above.
- Cable Connection
Power Button
- 2.5 “HDD, SSD Installation
2.5″ HDD and SSDs can be installed on the side of case as shown in the diagram below.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>