Penguin 17-000 Ancrage Permanent Installation Guide

June 1, 2024
Penguin

Penguin 17-000 Ancrage Permanent Installation Guide’
Penguin 17-000 Ancrage Permanent Installation Guide

STEP 1
Using a drill, make 7/8″ holes in the ground 12″ to 18″ deep, 2″ away from the poles.

STEP 2
Ensure to screw in the driving head completely into each anchor so that you will be able to drive it even with the ground.

STEP 3
Remove the driving head and install the push rod.

STEP 4
Use a mallet to make the push rod penetrate until each anchor curves out in the ground. Do not hit too much. Remove the push rod.
Installation Instruction

STEP 5
Install an eyebolt by screwing into each anchor, then attach stucture securely to eyebolt.
Installation Instruction

STEP 6
When the season is over, replace the eyebolts with the screws supplied.
Installation Instruction

**WITH EYEBOLT

UP TO 28 FT.
Installation Instruction
32 PI. ET + / 32 FT. & +
Installation Instruction
**Put the anchors as show in the schema. The number of anchors depends upon the lenght of the shelter.

CONTENTS

  • 4 anchors
  • 4 screws
  • 4 eyebolts
  • 1 push rod
  • 1 drive head

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Penguin User Manuals

Related Manuals