Penguin 17-000 Ancrage Permanent Installation Guide
- June 1, 2024
- Penguin
Table of Contents
Penguin 17-000 Ancrage Permanent Installation Guide’
STEP 1
Using a drill, make 7/8″ holes in the ground 12″ to 18″ deep, 2″ away from
the poles.
STEP 2
Ensure to screw in the driving head completely into each anchor so that you
will be able to drive it even with the ground.
STEP 3
Remove the driving head and install the push rod.
STEP 4
Use a mallet to make the push rod penetrate until each anchor curves out in
the ground. Do not hit too much. Remove the push rod.
STEP 5
Install an eyebolt by screwing into each anchor, then attach stucture
securely to eyebolt.
STEP 6
When the season is over, replace the eyebolts with the screws supplied.
**WITH EYEBOLT
UP TO 28 FT.
32 PI. ET + / 32 FT. & +
**Put the anchors as show in the schema. The number of anchors depends upon
the lenght of the shelter.
CONTENTS
- 4 anchors
- 4 screws
- 4 eyebolts
- 1 push rod
- 1 drive head
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>