bsaunas Halden M Log Sauna Instruction Manual

June 1, 2024
bsaunas

bsaunas Halden M Log Sauna Instruction Manual
bsaunas Halden M Log Sauna

HOUSE: HALDEN M 40

POS. DESCRIPTION NOTE PCS. PROFILE LENGTH
AR5 IMPREGNATED FLOOR FRAMING 1 45×95 3915
AR4 IMPREGNATED FLOOR FRAMING CUTOUT 1 45×95 3915
AR3 IMPREGNATED FLOOR FRAMING 13 45×95 1980
AR1 IMPREGNATED FLOOR FRAMING CUTOUT 1 45×95 1980
AR2 IMPREGNATED FLOOR FRAMING 1 45×70 1980
PL-1 FLOOR BOARD SAUNA ROOM 18+2 24×112 1965
PL-2 FLOOR BOARD FRONT ROOM 18+2 24×112 996
KL-1 ROOF BOARD 40+4 24×112 2668
SL-1 CEILING BOARD SAUNA ROOM 18+2 14×111 2013
TL-1 IMPREGNATED TERRACE BOARD 17+2 28×120 800
TL-2 IMPREGNATED TERRACE BOARD 1 28×120 2070
PP-1 FLOOR/CEILING/ROOF MOULDING 18+2 15×55 2100
DL-1 SPACER 4 15×55 1996
R-1 BATTEN BEVELLED 2 45×45 1996
RLT-1 ROOF EDGE SUPPORT 2 45×45 4446
RL-1 ROOF EDGE BOARD 2 18×95 2800
RL-2 ROOF EDGE BOARD 2+1 18×95 4500
APL55-1 **** MOULDINGS FOR 845+845×1792 WINDOW **** 1 SET 2
15×55 1752
APL95-1 2 18×95 1650
APL95-2 2 18×95 1900
APL95-3 4 18×95 1877
APL95-4 **** MOULDINGS FOR 690×1792 WINDOW **** 1 SET 2 18×95 650
APL95-5 2 18×95 900
APL95-6 4 18×95 1877
UPL95-1 **** MOULDINGS FOR 690×1860 DOOR **** 2 SETS 2 18×95 920
UPL95-2 4 18×95 1890
UPL-1 EXTRA MOULDING 2 18×95 2400
DESCRIPTION NOTE PCS.
--- --- --- ---
**** DOORS/WINDOWS EXTERIOR DOOR WITH WOODEN FRAME 88x690x1860 1
GLASS DOOR 88x690x1860 1
WINDOW 45x845x1792 2
WINDOW 45x690x1792 1
DOOR HANDLE SET FOR EXTERIOR DOOR 1
DOOR KNOB SET FOR GLASS DOOR 1
**** COMPONENTS BENCH MODULE 600×1992 1
BENCH MODULE 400×1992 1
BENCH MODULE 500×992 1

BENCH SUPPORTS SET 45×45 (560-3PCS, 500-1PC, 465-2PCS, 452-2PCS, 375-2PCS)| | 1
ADDITIONAL VERTICAL BENCH SUPPORT 45x45x1000| ADJUSTABLE| 1
OUTDOOR BENCH 563×750| | 1
|
GRID WALL 650×1711| | 1
3MM SLOPE BOARD| 1996MM| 1
6MM SLOPE BOARD| 1996MM| 1
9MM SLOPE BOARD| 1996MM| 1
12MM SLOPE BOARD| 1996MM| 1
INSULATION SHEET 30x600x1200| | 6
ALUMINUM TAPE| | 20M
WOODEN VENTILATION LOUVER D100| | 2
METAL VENTILATION GRID D100| | 2
DRAINAGE 2000+| OPENS RIGHT| 1
FASTENERS| 3.5×50 SCREW FOR FLOOR BOARDS| 200
3×40 STAINLESS SCREW FOR DOOR/WINDOW MOULDINGS| 200
4.2×55 STAINLESS SCREW FOR TERRACE AND ROOF EDGE BOARDS| 200
5×40 SCREW FOR ANGLE BRACKETS| 100
4.5×60 SCREW FOR ROOF EDGE SUPPORT| 50
4.5×70 SCREW FOR BENCH MODULES, BATTENS, GRID WALL AND DOOR FRAME| 150
5×90 SCREW FOR FLOOR FRAMING AND CONNECTING WALL LOGS WITH FLOOR FRAMING|
100
6×120 SCREW FOR WALL LOG INTERSECTIONS| 250
6×180 SCREW FOR PURLINS, CONNECTING WALL LOGS WITH FLOOR FRAMING AND WALL LOGS| **** 40
75MM NAIL FOR ROOF BOARDS| 400
40MM LOST HEAD NAIL FOR CEILING BOARDS| 300
ADJUSTABLE POST SUPPORT 60×60| 1
SLIDING BRACKET 35x35x130 FOR GRID WALL| 2
WASHER M5 FOR SLIDING BRACKET| 2
ANGLE BRACKET 40x40x40 FOR WINDOWS| 12

BASE PLAN

Base Plan

FLOOR FRAMING 45 x 95

NB! Check diagonals, remember that A=B=4429
Check Diagonals

Use two 5×90 screws to fasten joist ends with crossing joists. Fix with parallel joists, when there is no crossing joists. AR3

FASTENING WALL LOGS

Fasten first row to floor framing. Use 5×90 screws for half logs (fix those first) and 6×180 screws for full logs. It is recommended to predrill holes. If necessary use rubber hammer and hit block to secure logs tightly on top of each other.
Fastening Wall Logs

Use 6×120 screws in each intersection. Try to alternate placement of drill holes so screws dont end up on top of each other. It is recommended to predrill the holes.

Framing should be 5mm inside from outer wall.
Fastening Wall Logs

Pos| | Pcs| Profile
Imm)| Length
(mm)
---|---|---|---|---
001| Dimensions Instructions| 1| 40×136| 4446
002| Dimensions Instructions| 2| 40×136| 4446
003| Dimensions Instructions| 2| 40×136| 4246
| Dimensions Instructions| 16| 40×136| 3320
005| Dimensions Instructions| 1| 40×136| 3320
006| ****| 14+1| 40×136| 2280
007| | 3| 40×136| 2280
008| | 3| 40×136| 2280
009| | 3| 40×68| 2280
010| | 3| 40×136| 1670
011| | 28| 40×136| 1212
012| | 3| 40×87| 650
013| | 28| 40×136| 368
014| | 13| 40×136| 330
015| | 26| 40×136| 285
P1| HIT BLOCK 40MM| 1| 70×70| 1912
PR1| Dimensions Instructions| 2| 45×145| 4446

WALL (A)

Dimensions

WALL (B)

Dimensions

WALL (C)

Dimensions

WALL (1)

Dimensions

WALL (2)

Dimensions

FLOOR BOARDS

Add slope boards and drainage details before fixing floor boards.
Floor Boards

When placing drainage, fix closed end temporarily 5mm higher than opened end to guarantee slope towards outer wall for water. After placing floor boards fix it permanently with floor mouldings.

Dimensions

Fasten floor boards with screws from the tongue side of the board. First board should be placed -5mm from wall and when cutting last board make sure there is 5mm gap as well. Leave 2mm gap between floor board (cross cut sides) and walls. Lastly fix mouldings in place.
Fasten Floor

Fasten terrace boards with two screws in each connection.
Fasten Terrace

ROOF BOARDS

  1. Fix purlins with 6×180 screws (predrill holes).
    Roof Boards

  2. Fix roof boards with 75mm nails (2pcs for each connection).

  3. Fasten roof edge support and board. Use 4,5×60 screws (one for every other board ending) to fix edge support. For edge boards use 4,2×55 srews.
    Fasten Roof

  4. Cut gable edge boards to length and fix with 4,2×55 screws.
    Cut Gable

FASTENING DOORS/WINDOWS

Fastening Doors

  1. Fasten 40x40x40 angle brackets to window jambs (3pcs for each side) with two 5×40 screws. Make sure that brackets are 3mm inside from outer surface of the jamb, so there will be enough room for screw heads when mounting windows to walls and fixing mouldings.
    Fixing Mouldings

  2. Lift window in place and fasten angle brackets to wall with 5×40 screws (2pcs for each bracket).
    Each Bracket

  3. Fasten mouldings with 3×40 screws. Mouldings should cover about 20mm of frame.
    Fasten Mouldings

  4. Lift door in place and fix it to wall by screwing 4,5×70 screws through wall to frame.
    Lift Door

  5. Fasten mouldings with 3×40 screws. Mouldings coverage is about 20mm on upper moulding and 10mm on sides. There are no mouldings on the side of the frame.
    Fasten Mouldings

DOOR WINDOW MOULDINGS

Door Window Mouldings
Door Window Mouldings

CEILING INSULATION IN SAUNA ROOM

  1. Fasten battens (R-1) to side walls so that they are in line with purlins. Use 4,5×70 screws.
    Fasten Battens

  2. Place insulation sheets under purlins (use few left over screws from previous steps to hold sheets in place). Tape screw holes in sheets, connection seams and perimeter with aluminum tape.
    Place Insulation

  3. Fasten spacers under battens/purlins with 4,5×70 screws to secure insulation sheets properly in place.
    Fasten Spacers

  4. Fix ceiling boards under spacers with lost head nails. (two nails for each connetion). Finally fasten mouldings around perimeter using lost head nails.
    Fix Ceiling
    Dimeions

FASTENING BENCH MODULES

This is an overall manual for bench modules. You can skip some of the steps depending on the set (for example if there is no bench skirt). Precise heights for bench supports and benches can be found on the next page.

  1. Fasten bench supports with screws to wall. Use glue between wall and support for stronger connection.
    Stronger Connection

  2. Lift modules in place and fix them to the supports on the walls. Do not install upper module in case there is bench skirt in set
    Lift Modules

  3. Lift bench skirt in place, attach it to wall from sides and to lower bench in middle. There should be 8mm gap between lower bench and bench skirt.
    Lift Bench

  4. Place upper module and fix it in place as described in step two.
    Place Upper

CROSS-SECTION OF SAUNA ROOM AND HEIGHT OF BENCH MODULES

Use 4,5×70 screws to fasten bench supports to walls and to fix benches to already fixed supports. Lower module position is approximate (can be placed according to your own preferance). Outdoor bench support must be fixed at the same height as is lenght of vertical supports.
Bench Modules
Bench Modules

FASTENING GRID WALLS AND ADJUSTING POSTS

Fastening Grid

Use sliding brackets to fix grid wall to house. Fasten slider to the wall logs. Leave the side with a slot on the side of grid wall, put MS washer between screw and slider. Do not fix the screw too tight to enable the house to move different from grid wall.

After house is built it is necessary to adjust post support. Otherwise house will settle, but not the parts that are supported by post and there will be gaps between wall logs. Loosen nut under post and wait a little bit so house can settle. Then turn nut back against plate.
Adjusting should be done once a month after house has been built, then once every three months after half a year has passed and after first year it is enough to adjust post supports once or twice a year.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

bsaunas User Manuals

Related Manuals