MaxMate SS2D35098MX 3.5 Oval Nerf Bar Side Steps Instruction Manual
- June 1, 2024
- MaxMate
Table of Contents
MaxMate SS2D35098MX 3.5 Oval Nerf Bar Side Steps
Product Information
Specifications :
-
* **Model:** SS2D35098MX
- Fastener Size Torque Values :
Fastener Size | 6mm | 8mm | 10mm | 12mm | 14mm |
---|---|---|---|---|---|
Class 8.8 Torque (ft-lbs) | 6-7 | 15-16 | 31-32 | 54-55 | 87-88 |
Class 10.9 Torque (ft-lbs) | 6-7 | 22-23 | 44-45 | 78-79 | 125-126 |
Product Usage Instructions
Before Installation:
Read instructions carefully before starting installation. Remove contents from the box and verify all parts are present. If missing parts or any damage are found, take a photo to file a claim.
Step Bars Installation:
Step 1:
Start the installation under the passenger side of the vehicle. Locate the front (3) factory studs along the inner sidewall of the body panel. Use a wire brush or thread die to remove paint buildup on the threaded studs.
Step 2:
Select (1) Mounting Bracket. Attach the Mounting Bracket to the (3) factory studs with (3) 8mm Flat Washers and (3) 8mm Nylon Lock Nuts. Leave the bracket loose at this time.
Step 3:
Repeat Steps 1-2 to install Mounting Brackets in the center and rear mounting locations along the body panel.
Step 4:
Carefully unwrap and select the Passenger/Right Sidebar P. Place the Sidebar on top of the Brackets without twisting or sliding.
Step 5:
Attach the Sidebar to the (3) Brackets with (6) 8mm Combo Hex Bolts. Do not tighten the hardware at this time.
FAQ
- Q: What should I do if I find missing parts or damage during installation?
- A: If missing parts or any damage are found, take a photo to file a claim and contact support@maxmatedepot.com for assistance.
BEFORE INSTALLATION
BEFORE INSTALLATION READ THE INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION. REMOVE CONTENTS FROM BOX AND VERIFY ALL PARTS ARE PRESENT. FAILURE TO IDENTIFY DAMAGE BEFORE INSTALLATION COULD LEAD TO A REJECTION OF ANY CLAIM. IF MISSING PARTS OR ANY DAMAGE ARE FOUND, PLEASE TAKE A PHOTO FOR THE PURPOSE OF FILING A CLAIM. TO FILE YOUR CLAIM, PLEASE EMAIL SUPPORT@MAXMATEDEPOT.COM.
TORQUE VALUES
Parts List
- X1: Driver/Left Sidebar D
- X1: Passenger/Right Sidebar P
- X6: Mounting Brackers (use left or right)
- x12 : 8-1.25mm x 25mm Combo Bolts
- x18: 8mm x 24mm x 2mm Flat Washers
- x18: 8-1.25mm Nylon Lock Nuts
- contact us : support@maxmatedepot.com
- Distinguish the Driver and Passenger Side Steps by the D and P labeling on the end caps.
- NOTE: REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT. READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION. ASSISTANCE IS RECOMMENDED.
STEP 1
Start the installation under the passenger side of the vehicle. Locate the
front (3) factory studs along the inner sidewall of the body panel, (Fig 1).
NOTE : Use a wire brush or thread die to remove paint buildup on the
threaded studs.
STEP 2
Select (1) Mounting Bracket, (Fig 2).
NOTE: All (6) Brackets are universal and will fit left or right side.
Attach the Mounting Bracket to the (3) factory studs with (3) 8mm Flat Washers
and (3) 8mm Nylon Lock Nuts, (Figs 2-3). Leave bracket loose at this time.
STEP 3
Repeat STEPS 1-2 to install Mounting Brackets in the center and rear mounting locations along the body panel, (Figs 4-8).
STEP 4
Carefully unwrap and select the Passenger/Right Sidebar. Use the illustration
above to help identify the correct Sidebar P. Place the Sidebar on top of
the Brackets.
IMPORTANT: DO NOT twist or slide, (front to back), the Sidebar on the
Brackets or damage to the finish may result
STEP 5
Attach the Sidebar to the (3) Brackets with (6) 8mm Combo Hex Bolts, (Figs 9-12). DO NOT tighten hardware at this time.
STEP 6
Level and adjust the Sidebar as necessary and fully tighten all hardware.
STEP 7
Repeat STEPS 1-6 for Driver/Left Sidebar D installation.
STEP 8
Do periodic inspections to the installation to make sure that all hardware is secure and tight.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>