ENVIRO C34 Fireplace Installation Guide
- June 2, 2024
- Enviro
Table of Contents
**ENVIRO C34 Fireplace Installation Guide
**
Minimum Framing Dimensions
Depth | 20” | 508 mm |
---|---|---|
Width | 45” | 1143 mm |
Header Height | 38” | 965 mm |
Rough Opening Height | 43.5” | 1105mm |
Enclosure Ceiling | 65” | 1651 mm |
Note: Vent size = Co-axial 5 x 8”
Clearance to Combustibles
A – Finishing edge to side wall | 7″ | 229mm |
---|---|---|
B – Minimum clearance to enclosure ceiling | 65″ | 1651 mm |
C – Minimum clearance to mantel height | See Chart | See Chart |
D – Front of door to edge of floor protection | 0″ | 0 mm |
E – Minimum alcove width | 50″ | 1270 mm |
Non-Combustible Board Placement
Minimum Venting Requirements
Minimum permitted venting is shown below. The framing height to the center of
the thimble is 50”. Minimum venting must include a 12” vertical section and a
90 degree elbow which is then terminated horizontally. For a vertical
termination please follow the vent pipe manufacturer’s installation
instructions for vertical vent termination framing. A minimum of 1 in. (25 mm)
clearance on all sides of the vertical vent pipe must be maintained. For every
12” of horizontal run there must be a 1/4” of rise. 1” of clearance between
framing and venting must be maintained at all times. 2” above the venting and
3” above an elbow.
Fireplace Dimensions
Mantel Projections
Mantel graph dimensions are measured from the bottom of the fireplace, if you
wish to reference the mantel height from the tiling edge subtract 15 inches
(381mm) from the mantel height depicted on the graph. If you plan to install a
TV above your fireplace refer to the appropriate section of the owner’s manual
for available options.
It is acceptable to install a combustible mantel over top of the
noncombustible board. If you are activating the Cool Surface System you are
eligible to subtract 12” (305mm) from the mantel height shown in this diagram.
See page 6 for more details.
Dimensions
C34 CSS Front Vent – Overall Dimensions
CSS Side Vent – Dimensions
C34 CSS Combustible Facing Kit – Dimensions
Framing & Rough Opening – Front Vent
CSS Outlet Min. Top and Bottom standoff = 25 /8” (6.7 cm) All C Series
Venting Clearances – Front Vent
Shown here are the minimum framing and clearances for the CSS when the fireplace is installed with the minimum allowable vent length:
Min. Ceiling Clearance from top of CSS outlet = 4” (10.2 cm)
Min. Ceiling Clearance in wall from top of CSS Body = 55 /8” (14.3 cm) CSS
Body Min. Rear standoff = 2¾” (69.8 cm).
Framing & Clearances – CSS Side Vent
CSS Side Vent (Horizontal Install) – Min. Framing & Clearances
*NOTE: 15.75” from the header is required for min. ceiling height. Rest unit on lower standoff. There will be a 3/4“ (2cm) gap on from the top standoff to the header in this configuration.
Min Framing is 15” x 11.5”
CSS Side Vent (Vertical Install) – Min. Framing & Clearances
Framing & Revised Mantle Clearances – Front Vent
Framing & Revised Mantle Clearances – Side Vent
TV Installation Considerations
If you are planning to mount a TV above your fireplace some considerations must be made to ensure it is protected from the heat.
During testing temperatures did not exceed 121°F (49°C) midway up the front wall (see figures on right). There is no guarantee that these temperatures will not harm the longevity of your TV. Make sure to consult your TV manufacturer’s specifications to find the maximum allowable operating temperature. Since every home and installation is unique, temperatures should be verified at the time of install if possible. If desired, front wall temperatures can be lowered to 104°F (40°C) with the use of a mantle (see CSS TV clearances with Mantle figure). See revised mantle clearances chart above. A TV should not be installed if temperatures exceed the manufacturers maximum allowable temperature.
CSS – TV Clearances
CSS – TV Clearances with Mantle