MONDAWE 6368 Ceiling Shower Head with Handled Set Installation Guide

June 17, 2024
Mondawe

MONDAWE logo THERMOSTATIC SHOWER Series
INSTALLATION GUIDE

6368 Ceiling Shower Head with Handled Set

MONDAWE 6368 Ceiling Shower Head with Handled Set Model: 6368

INSTALLATION CONDITION

  1. Refer to the «Standard Part List) when unpacking , check all parts available .
  2. Do not disassemble mixer body by yourself.
  3. Connect inlet hoses to supply valves.MONDAWE 6368 Ceiling Shower Head with Handled Set - fig 1
  4. Make sure inlet pipes and supply valves have been installed and cleaned, also ensure no impurities in pipeline.
  5. After installation , check all joints for leakages.
  6. Suggest don’t fit the faucet in the severely corrosive environments.

YOU MAY NEED:

MONDAWE 6368 Ceiling Shower Head with Handled Set - fig
2 Model:6368
PRODUCT LIST

MONDAWE 6368 Ceiling Shower Head with Handled Set - fig
3

No. Part name Qty
1 Shower head 1
2 Shower head Hose 2
3 Fixed rod 4
4 Flange plate 4
5 Screw 4
6 Set screw 12
7 Shower hand 1
8 Hand show holer 1
9 Holder cup 1
10 Shower hose 1
11 Main body 1
12 Panel 1
13 Water diverter rod 3
14 Water diverter 3
15 Handle 1
16 Body jet cup 3
17 Body jet 3
18 Valve gasket spare parts 6
19 Handle cup 1
20 Screw 1
21 Wrench 1
22 Instruction manual 1
23 Gloves 2

INSTALLATION SHOWER SET SIZE & WATER PIPE LINE REFERENCE
Unit:mm/inchMONDAWE 6368 Ceiling Shower Head with Handled Set - fig
4 * INSTALLATION DEPTH OF SHOWER ARM &SHOWER HOLDER & BODY JET
Unit:mm/inchMONDAWE 6368 Ceiling Shower Head with Handled Set - fig
5 The installation depth of shower arm &shower holder &body jet can’t over 19/32″(15mm)so the thickness of tile must be calculated before installation.

INSTALLATION DEPTH OF MAIN BODY

Unit:mm/inch

  1. MONDAWE 6368 Ceiling Shower Head with Handled Set - fig 6Including the thickness of ceramic tile is less than or equal to the thickness of valve 3 3/4″ (95mm), so the thickness of tile must be calculated before installation.
  2. Installation Main body depth not less than 3 1/8°(80mm)min and not more than 3 3/4″ (95mm) Max, Otherwise, the panel cannot be installed.

WALL MOUNTED/CELILING MOUNTED INSTALLATION BEFORE TILONGMONDAWE 6368
Ceiling Shower Head with Handled Set - fig 7 1:Recommend using Copper drop ear pipe eloow(NPT 1/2 )
USA:1/14 NPT 2 -Canada:1/2″-14 NPT Europe:G1/2″

MAIN BODY CONNECTING PIPE SCHEMATIC DIAGRAM

Warning:must install hot water and cold water inlet strictly as instructions.MONDAWE 6368 Ceiling Shower Head with Handled Set - fig
8

  1. As shown in the figure, the inlet and outlet pipes are pre-buried, pay attention to the correct direction of installing the pre-buried main body,and make sure that the mark level on the top of the installation box is facing upward.
  2. Install the hot and cold water inlet pipes, Shower head and hand shower holder body jet pipes. Turn on the water source to test whether the left and right inlet pipes are tightly connected without leakage.After the test,adjust the flow switch to be on to test whether the mixed outlet pipe. The connection is tight and there is no leakage.

MAIN BODY VALVE INSTALLATION

MONDAWE 6368 Ceiling Shower Head with Handled Set - fig
9

Use 18 Valve gasket spare parts and to fixed 11 Main body on the wall and then install 12 Panel 18 Handd 14 Hand cup and Hand screw 14 Water diverterl 13 Water diverterl rod in the correct order.

Shower head installation

MONDAWE 6368 Ceiling Shower Head with Handled Set - fig
10MONDAWE 6368 Ceiling Shower Head
with Handled Set - fig 11

INSTALLATION OF MASSAGE SHOWER

MONDAWE 6368 Ceiling Shower Head with Handled Set - fig
12 Step 1. Wrap the threaded pipe of NPT1/2 with Teflontape and screw it into the wall.
Step2. Cut off excess part with a saw.
Step3. Put on the decoration cap. then screw the massage shower in.MONDAWE 6368 Ceiling Shower Head with Handled Set - fig
13 Install the hand shower holder

MONDAWE 6368 Ceiling Shower Head with Handled Set - fig
14

Step1.Screw the thread into the water pipe inside the wall.
Step2.Screw the main body into the thread.
Step3.Rotate and fix the body with the special-shaped wrench.
Step4.Connect hand shower and the hose.

Do’s

  1. In order to keep the mixer surface bright, please clean the mixer regularly.
  2. Rinse the faucet with clean water and wipe it with a soft cotton cloth.
  3. Use one of the following cleaners to remove dirt from the surface:MONDAWE 6368 Ceiling Shower Head with Handled Set - fig 15 a.Mild liquid cleaner.
    b.Colorless glass cleaner and powder cleaner that do not cause abrasion and can be dissolved completely.
    c.Polish liquid that does not cause abrasion.

Don’ts

a.Avoid using cleaning powder, harsh cleaning chemicals, brushes and coarse cloth  to prevent scratching and friction.
b.Do not use acid cleaners to clean the faucet as they may cause surface corrosion of the faucet. If the faucet is exposed to harmful acid substances, please rinse   it immediately with water.

MONDAWE logoWebsite:www.mondawe.com 
Customer Service:service@mondawe.com 
Phone:888-328-5111

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Mondawe User Manuals

Related Manuals