cell2 RBK Raiden DC 1676mm 66 Instruction Manual
- June 16, 2024
- Cell2
Table of Contents
cell2 RBK Raiden DC 1676mm 66 Instruction Manual
CONTENTS
- Serial-bus Controller x 1pc
- Self-Driling Screw x 4pcs
- 18-PIN Harness x 1pcs
- 6-PIN Harness x 1pcs
INSTALLATION
Proper installation of the product requires the installer to have a good understanding of automotive electronics, systems and procedures. It is essential to install the unit properly to ensure a safe and reliable operation. Please read through all instructions thoroughly and carefully before installing the unit.
- Select a location that is not exposed directly to weather elements, such as the driver compartment firewall, below the seat, or in the trunk; avoid any interference of air bag deployment. (Test fit all cables and harnesses before proceed.)
- Use the Drilling Template, mark and drill the mounting holes on the mounting surface.
- Fit the Serial-bus Controller and each mounting screw to its proper position, and tighten the screws until secured.
- Connect the harness and wires to the Wiring Diagram.
WIRING DIAGRAM
B 18-PIN Connector (I/O) [Socket View]
1 WHITE
2 GREY
3 PURPLE
4 BLUE
6 YELLOW
7 ORANGE
8 RED
9 BROWN
10 WHITE-BLK
11 GREY-WHT
12 PURPLE-WHT
13 BLUE-WHT
14 GREEN-WHT
15 YELLOW-WHT
16 ORANGE-WHT
17 RED-WHT
18 BROWN-WHT
Note: The exact function for each function wire will be based on the model purchased. Refer to Operation Manual for detailed information.
6-PIN Connector (Power / Lightbar CAN) [Socket View]
F. Mode Switch
**Upload Mode
Normal / PC Mode**
A RJ45 Port – Not used.
B 18-PIN (I/O) – Plug 18-Pin Harness to the socket.
Connect each individual I/O wire according to its function. (Refer to Software
Operation Manual for detailed information.)
C 6-PIN (Power / Lightbar CAN ) – Plug 6-Pin Harness to the socket.
- Connect 2 Serial-bus signal and SHIELD wires to Lightbar CAN Cable. (Refer to Software Operation Manual for detailed information.)
- Connect RED Wire to an ignition controlled circuit that can accommodate an additional 250mA load.
- Connect 2 BLACK Wires to Chassis Ground.
V USB Type-C Port –
- Connect to PC via a Type-C Cable (user supplied) for PC programming. (Refer to Software Operation Manual for detailed information.)
E Status LED Button –
Normal / PC Mode – Green (Steady-burn): System normal.
– Red (Steady-burn): CAN Bus Error; reboot and check Lightbar power and
connection.
Upload Mode
- Green (Flashing Single): Firmware uploading completed.
- Red (Slow Flashing): Firmware uploading.
- Red (Fast Flashing): Data Error, reload configuration file from PC via GUI software.
- Red (Steady-burn): Uploading failed; retry steps.
Mode Switch – (See next page “PROGRAMMING”)
- Flip the switch downward for PC Mode when programming via PC.- Flip the switch upward for uploading firmware to lightbar. Flip downward after uploading for normal lightbar operation.
Installation & Operation Manual
PROGRAMMING – via Serial-bus Controller to lightbar
All lightbar function wires may be customized and re-programmed via Serial-bus
Controller connection and specialized PC software.
For more information about PC programming and Software, please refer to
Software Manual or contact your sales representative.
Follow the steps below to accomplish the programming:
-
Flip Mode Switch to PC Mode and connect the Serial-bus Controller to PC via a Type-C Cable.
-
Follow the instruction on GUI software and load (burn) the software configuration onto the Serial-bus Controller.
-
Once the Serial-bus Controller is prepared, plug 6-PIN harness to the socket, connect 2 CANBus signal and SHIELD wires to the respective Lightbar CAN wires.
-
Power-up the Serial-bus Controller and the Lightbar by connecting to a Power Supply Unit (following the respective wiring diagram).
-
Flip Mode Switch to Upload Mode to start uploading firmware from Serial-bus Controller to the lightbar.
The status LED should display Slow Flashing Red when uploading the firmware. -
Once done, the status LED should display Flashing Green. Flip Mode Switch to Normal / PC Mode for normal lightbar operation.
6-1. If the status LED displays Fast Flashing Red, reload configuration file from PC via GUI software.
6-2. If the status LED displays Steady Red, repeat from Step 5 and re- uploading. -
The new firmware is loaded and ready to use. Test all function of your lightbar before actual operation
DRILLING TEMPLATE
Documents / Resources
|
cell2 RBK Raiden DC 1676mm
66
[pdf] Instruction Manual
RBK Raiden DC 1676mm 66, RBK, Raiden DC 1676mm 66, DC 1676mm 66, 1676mm 66
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>