Karibu 7141981218 Konifera Garden House Instruction Manual
- June 4, 2024
- Karibu
Table of Contents
Karibu 7141981218 Konifera Garden House
22192 22193
Building Instructions
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
Not included
Roofing felt installation
Note! This description is only an example!
The bitumen roofing is used for initial cover and should be supplemented by a
separate product according to customers choice after two months. The number of
bitumen strips to be used depends on your actual house size. When joining
rolls of roofing felt end to end, the overlap must be approximately 10cm. The
roof is not safe to walk on. The roof is designed for a total load (snow,
wind) and not for a point load. We recommend you to always support the roof
from below during installation. The sealing of the roof surfaces to adjacent
components with bitumen sealant has to be effected by the customer! If it is a
saddle-roofed house, do not use roofing tiles for roofing. In this case, a 20
cm wide strip of bitumen with overhang should be installed on both sides of
the eaves. For houses with a tone roof, please install a bitumen roofing under
the shingles. In the case of a flat roof the laying of roof shingles is not
possible!
Building Instructions
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
- Handling
- Manhandling
- Maintenance
- Countenance
- Care of the the door
The guarantee is conditional on proper upkeep!
For lasting protection of the value and suitability for use, professional care
and maintenance is also recommended during the warranty period; this is not
included in the warranty obligations. Defects must be repaired immediately
upon detection.
Wood protection treatment of the door
All parts of the door must receive wood protection treatment. Those sections
of the wood, which will not be accessible after installation, should receive
complete treatment before installation.
Treat the product with a blue stain blocking coat; afterwards apply a double
protective coating of an open-pored wood-protection glaze. Application of a
protective coating should be repeated at least every two years. Please beware
that the inserted plates of other material may come to differ in color to the
doors if you use unsuitable coating material. With cultured and boiler
pressure impregnated houses, only the exposed natural wood (saw cuts) and
parts should need extra treatment. You can obtain an even color covering in
inside areas with one coat of paint. For that you should use an open-pored,
acrylic based water dispersed lacquer. In order to guarantee a long service
life of your product you should repair damaged areas immediately. Do this by
whetting the damaged area and apply a new coat of paint. Enquire about
suitable glazes at your local paint retailer. Furthermore, you can seal the
joining of the wood-window pane with a suitable sealant to guarantee a long
service life of the door and prevent leakage from heavy rain. If these
precautions of care are not properly carried out, it can result in
deformation, blue stain, fungus infestation in the doors and frames and loss
of warranty.
Cleaning
Regular cleaning and care is a prerequisite for preserving the service life
and functionality of high-value products. Cleaning is to take place outside,
inside and also in the rabbet-area. The cleaning agent used must be suitable
for the relevant material; please do a test before you start cleaning.
Deformation of the door
Wood reacts to environmental influences. Weather exposure will lead to swelling
and contraction of the wood. This causes variances of dimensions and slight
deformation. Dependent on the weather exposure, the door may need realignment
by turning the hinges in- or outwards. Some door warpage is acceptable as long
as the door can be made to function through the alignment options specified
here. The warranty does not cover damage caused by use of excessive force.
Adjustment of the door
The door must be accurately adjusted to ensure trouble-free operation. The
door frames must be installed right-angled and perpendicular. Furthermore,
they must be installed so the width of the frame is the same at the top and
bottom. If the door doesn’t close or if one panel is askew, this can be
rectified by limited in- or outwards turning of the hinges. You can turn the
hinges outwards up to 5 rotations. If you have a double-door, the door to be
secured must always be correctly aligned at the top and bottom with the
appropriate hinges.
22198 22199
Building Instructions
Not included
-
Length must be determined and sawn
-
Not needed
-
with accessories!
-
Fixed temporarily
-
Inventory of the house
Roofing felt installation
Note! This description is only an example! The bitumen roofing is used for initial cover and should be supplemented by a separate product according to customers choice after two months. The number of bitumen strips to be used depends on your actual house size. When joining rolls of roofing felt end to end, the overlap must be approximately 10cm. The roof is not safe to walk on. The roof is designed tor a total load (snow, wind) and not tor a point load. we recommend you to always support the roof Tromp below dunning installation. Ice sealing of the root surfaces to adjacent components With bitumen sealant has to be effected by the customer! if it is a saddle-rooted house, do not use roofing tiles tor roofing. In this case, a 20 cm Wide strip or bitumen with overhang should be installed on both sides of the eaves. For houses with a tone roof, please install a bitumen roofing under the shingles. In the case of a flat root the laying of roof shingles is not possible!