Karibu 79171 40mm Gable Roof Garage Instruction Manual
- June 1, 2024
- Karibu
Table of Contents
- Karibu 79171 40mm Gable Roof Garage
- Screwing cutouts
- Roofi ng felt installation
- Handling • Maintenance • CarHandling • Maintenance • Care e ofof the door
- Building Instructions
- Specifications:
- Product Usage Instructions:
- FAQ (Frequently Asked Questions):
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Karibu 79171 40mm Gable Roof Garage
INSTRUCTION MANUAL
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
Screwing cutouts
Wood is subject to a natural process of swelling and contraction. For this reason, over the course of the year your house “grows” and “shrinks”. Shorter wooden boards (front) adapt faster than long boards to the momentary climatic conditions. This can result in cracking. In order to reduce this cracking and at the same time allow for the natural growth and shrinkage behaviour of the wood, at the window and door recesses you must join each two boards positioned directly over each other. For this purpose, use 4 x 60 Spax joints. Always pre-drill the boards for screw can drill obliquely into the wood without slipping connections. Note: You away by setting on the drill vertically for the fi rst 3-5 mm and only then drilling obliquely.
Roofi ng felt installation
Note! This description is only an example!
The number of bitumen strips to be used depends on your actual house size.
When joining rolls of roofi ng felt end to end, the overlap must be
aproxximately 10cm. The roof is not safe to walk on. The roof is designed for
a total load (snow, wind) and not for a point load. We recommend you to always
support the roof from below during installation. The sealing of the roof
surfaces to adjacent components with bitumen sealant has to be eff ected by
the customer! If it is a saddle-roofed house, do not use roofi ng tiles for
roofi ng. In this case, a 20 cm wide strip of bitumen with overhang should be
installed on both sides of the eaves. For houses with a tonne roof, please
install a bitumen roofi ng under the shingles. In the case of a fl at roof the
laying of roof shingles is not possible!
Handling • Maintenance • CarHandling • Maintenance • Care e ofof the door
the door
The guarantee is conditional on proper upkeep!
For lasting protection of the value and suitability for use, professional care
and maintenance is also recommended during the warranty period; this is not
included in the warranty obligations. Defects must be repaired immediately
upon detection.
Wood protection treatment of the door
All parts of the door must receive wood protection treatment. Those sections
of the wood, which will not be accessable after installation, should receive
complete treatment before installation.
Treat the product with a blue stain blocking coat; afterwards apply a double
protective coating of an open-pored wood-protection glaze. Application of a
protective coating should be repeated at least every two years.
Please beware that the inserted plates of other material may come to differ in
colour to the doors if you use unsuitable coating material. With coloured and
boiler pressure impregnated houses, only the exposed natural wood (saw cuts)
and parts should need extra treatment.
You can obtain an even colour covering in inside areas with one coat of paint. For that you should use an open-pored, acrylic based water dispersed lacquer. In order to guarantee a long service life of your product you should repair damaged areas immediately. Do this by whetting the damaged area and apply a new coat of paint. Enquire about suitable glazes at your local paint retailer. Furthermore, you can seal the joining of the wood-window pane with a suitable sealant to guarantee a long service life of the door and prevent leakage from heavy rain. If these precautions of care are not properly carried out, it can result in deformation, blue stain, fungus infestation in the doors and frames and loss of warranty.
Cleaning
Regular cleaning and care is a prerequisite for preserving the service life and functionality of high-value products. Cleaning is to take place outside, inside and also in the rabbet-area. The cleaning agent used must be suitable for the relevant material; please do a test before you start cleaning. Deformation of the door
Wood reacts to environmental infl uences. Weather exposure will lead to swelling and contraction of the wood. This causes variances of dimensions and slight deformation. Dependant on the weather exposure, the door may need realignment by turning the hinges in- or outwards. Some door warpage is acceptable as long as the door can be made to function through the alignment options specifi ed here. The warranty does not cover damage caused by use of excessive force.
Adjustment of the door
The door must be accurately adjusted to ensure trouble-free operation. The door frames must be installed right-angled and perpendicular. Furthermore, they must be installed so the width of the frame is the same at the top and bottom. If the door doesn’t close or if one panel is askew, this can be rectifi ed by limited in- or outwards turning of the hinges. You can turn the hinges outwards up to 5 rotations. If you have a double-door, the door to be secured must always be correctly aligned at the top and bottom with the appropriate hinges.
Building Instructions
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
Screw the capping profi les onto the window only, not onto the cabin!
Specifications:
- Brand: Karibu Holztechnik GmbH
- Model Number: 79171 38235
- Date: 10.05.2023
- Address: Eduard-Suling-Str. 17, 28217 Bremen
- Email: info@karibu.de
Product Usage Instructions:
1. Determining and Cutting Length:
Measure and determine the required length for each component according to the provided specifications. Use a saw to cut the components to the correct size.
2. Assembly with Accessories:
Utilize the provided accessories for assembly. Ensure all necessary tools and additional parts are available before starting the assembly process.
3. Temporary Fixation:
Temporarily fix the components in place according to the assembly instructions. This step is crucial to ensure stability during the final assembly process.
4. Inventory Check:
Prior to assembly, compare the list of materials with the contents of your package to verify all components are included. Any discrepancies should be addressed before proceeding with assembly.
FAQ (Frequently Asked Questions):
Q: What should I do if some components are missing from the package?
A: Before starting the assembly, carefully compare the list of materials with the package contents. If any components are missing, contact customer support for assistance.
Q: Can I use my own tools for assembly?
A: It is recommended to use the provided accessories and tools for assembly to ensure proper fit and compatibility with the components.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>