karibu 91869 5 Set Garden House Moordeich Instruction Manual
- June 1, 2024
- Karibu
Table of Contents
karibu 91869 5 Set Garden House Moordeich
Building Instructions
- Not included
- Length must be determined and sawn
- Not needed
- With accessories
- Fixed temporarily
- Inventory of the house
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
Tools
Dimensions and Assembly
Glue! Look for the same height
Not included
Roofing felt installation
Note! This description is only an example!
The number of bitumen strips to be used depends on your actual house size.
When joining rolls of roofing felt end to end, the overlap must be
approximately 10cm. The roof is not
safe to walk on. The roof is designed for a total load (snow, wind) and not
for a point load. We recommend you to always support the roof from below
during installation. The sealing
of the roof surfaces to adjacent components with bitumen sealant has to be
effected by the customer! If it is a saddle-roofed house, do not use roofing
tiles for roofing. In this case,
a 20 cm wide strip of bitumen with overhang should be installed on both sides
of the eaves. For houses with a tonne roof, please install a bitumen roofing
under the shingles. In
the case of a flat roof the laying of roof shingles is not possible!
- Not included
- Length must be determined and sawn
- Not needed
- With accessories
- Fixed temporarily
- Inventory of the house
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
Not included. Beginning of rear panel mounting
Roofing felt installation
Note! This description is only an example!
The number of bitumen strips to be used depends on your actual house size.
When joining rolls of roofing felt end to end, the overlap must be
approximately 10cm. The roof is not
safe to walk on. The roof is designed for a total load (snow, wind) and not
for a point load. We recommend you to always support the roof from below
during installation. The sealing
of the roof surfaces to adjacent components with bitumen sealant has to be
effected by the customer! If it is a saddle-roofed house, do not use roofing
tiles for roofing. In this case,
a 20 cm wide strip of bitumen with overhang should be installed on both sides
of the eaves. For houses with a tonne roof, please install a bitumen roofing
under the shingles. In
the case of a flat roof the laying of roof shingles is not possible!
Karibu Holztechnik GmbH ● Eduard-Suling-Str. 17 ● 28217 Bremen info@karibu.de