VEVOR HT-W6412 Open Frame Server Rack User Manual

June 14, 2024
VEVOR

VEVOR Logo ADJUSTABLE OPEN FRAME
SERVER RACK
USER MANUAL

We continue to be committed to provide you tools with competitive price.
“Save Half”, “Half Price” or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and doses not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually saving half in comparison with the top major brands.

ADJUSTABLE OPEN FRAM SERVER RACK

THIS MANUAL APPLIES TO THE FOLLOWING SKUS:

HT-W6412| HT-W6415| HT-W6420

VEVOR HT W6412 Open Frame Server Rack 

NEED HELP? CONTACT US!
Have product questions? Need technical support? Please feel free to contact us:
CustomerService@vevor.com

This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won’t inform you again if there are any technology or software updates on our product.
Thank you for purchasing the Performance Series Wall Mount Cabinet from VEVOR.
Every effort has been made to ensure the accuracy of the information in this product manual.

COMPLIANCE STATEMENTS

Use of Trademarks,Registered Trademarks, and other Protected Names and Symbols
This manual may make reference to trademarks, registered trademarks,and other protected names and/or symbols of third-party companies not related in any way to vevor. Where they occur these references are for illustrative purposes only and do not  epresent an endorsement of a product or service by vevor, or an endorsement of the product(s)to which this manual applies by the third-party company in question. Regardless of any direct acknowledgment elsewhere in the body of this document, vevor hereby  cknowledges that all trademarks, registered trademarks,service marks, and other protected names and/or symbols contained in this manual and related documents are the property of their respective holders.
WARNING STATEMENTS

  • Make sure that you assemble this product according to the instructions.
  • Do not exceed the weight capacity of this product. Overloading this product might result in injury or property damage. This product can support the following weight: Ground-mounted load-bearing: 200Ib,
  • Wall-mounted load-bearing: 100Ib.
  • This product is intended for indoor use only and should not be used outdoors.
  • This enclosure is extremely heavy. Never attempt to move or lift this enclosure without assistance.
  • Tipping hazard! Extending multiple components from this enclosure increases the chance that the enclosure will tip over. To avoid this risk, do not extend more than one component from the enclosure.
  • Do not place any items on this enclosure and do not stack the enclosure on top of another enclosure.
  • Keep liquid away from this enclosure.
  • Make sure that you install the enclosure in an area that can handle the combined weight of the enclosure and the equipment that you intend to place inside of the enclosure.
  • This product requires an earth-ground connection. Do not use this product without an earth-ground connection.

PRODUCT DIAGRAM

Expanded View

VEVOR HT W6412 Open Frame Server Rack - PRODUCT

1 Vertical Rails (x 4)
2 Left upper Bracket (x 1)
3 Left lower Bracket (x 1)
4 Left corner Brackets (x 4)
5 Right corner Brackets (x 4)
6 Righ upper Bracket (x 1)
7 Righ lower Bracket (x 1)
8 Center Sections (x 4)
9 Corner piece (x 8)
10 Top panel (x 1)
11 Top Pallet (x 1)
12 Bottom Pallet (x 1)
13 Limit parts (x 8)
14 Expansion bolts (x 4)

To view manuals, videos, drivers, downloads, technical drawings, and more visit www.vevor

PACKAGE CONTENTS

VEVOR HT W6412 Open Frame Server Rack - Vertical

VEVOR HT W6412 Open Frame Server Rack - Vertical 1

VEVOR HT W6412 Open Frame Server Rack - Vertical 2

REQUIREMENTS

VEVOR HT W6412 Open Frame Server Rack - REQUIREMENTS

  • Electric screwdriver (sold separately)
  • Two People (for assembly)
  • Earth Ground Connection
  • Allen key

INSTALLATIO

Note: Two people are required for the Rack assembly.
Adjust the torque of the electric screwdriver to 10
Set the Mounting Depth

  1. Align the Left corner Brackets(#4 )and the Right corner Brackets(#4) with the Center Sections(#8),slide the Corner Brackets overtop of the Center Sections.(Figure 1)VEVOR HT W6412 Open Frame Server Rack - Figure
  2. Determine the maximum required mounting depth for the Rack Mountable Equipment.
  3. Slide the Left corner Brackets and the Right corner Brackets,inward along the Center Sections,and align the Center Sections with the hole on the Left corner Brackets and the Right corner Brackets.(Figure 2)VEVOR HT W6412 Open Frame Server Rack - Brackets
  4. Insert M5*10 Cross head screws through into the holes in the Corner Brackets and Center Sections. (Figure 3)VEVOR HT W6412 Open Frame Server Rack - Brackets 1
  5. Tighten the M5*10 Cross head screws on the Centre Section Assembly using Electric screwdriver.
  6. Place two Limit parts(#13) on Corner Brackets,Tighten the M5*10 Cross head screws using Electric screwdriver. (Figure 4)
  7. Repeat the above steps and assemble other 4 center sectionVEVOR HT W6412 Open Frame Server Rack - Cross head

Assemble the Rack

  1. Place Vertical Rails(#1) on Center Section Assembly, Secure with the M5*10 Cross head screws.(Figure 5)VEVOR HT W6412 Open Frame Server Rack - Assemble
  2. Place Vertical Rails (#1)on The other end of Center Section Assembly, Secure with the M5*10 Cross head screws.(Figure 6)VEVOR HT W6412 Open Frame Server Rack - Assemble 1
  3. Insert one Center Section Assembly between the Top of the two Vertical Rails.Ensure the holes in the ends of the Center Section Assembly align with the holes in the Top of the two Vertical Rails.
  4. Tighten the M5*10 Cross head screws on the Vertical Rails using Electric screwdriver.VEVOR HT W6412 Open Frame Server Rack - Assemble 2
  5. Repeat the above steps and Assemble another half-frame.VEVOR HT W6412 Open Frame Server Rack - Assemble 3
  6. Place Left lower Bracket (#3)between the Half-frame Assembly, align the two holes in the Vertical Rail and Left lower Bracket.
  7. Tighten the M5*10 Cross head screws on the Left lower Bracket using Electric screwdriver.VEVOR HT W6412 Open Frame Server Rack - screwdriver
  8. Place Left upper Bracket(#2) between the Half-frame Assembly, align the two holes in the Vertical Rail and Left upper Bracket.
  9. Tighten the M5*10 Cross head screws on the Left upper Bracket using Electric screwdriver.VEVOR HT W6412 Open Frame Server Rack - Electric
  10. Place Righ lower Bracket(#7) between the Half-frame Assembly, align the two holes in the Vertical Rail and Right lower Bracket.
  11. Tighten the M5*10 Cross head screws on the Right lower Bracket using Electric screwdriver.VEVOR HT W6412 Open Frame Server Rack - Electric Bracket
  12. Place Right upper Bracket (#6)between the Half-frame Assembly, align the two holes in the Vertical Rail and Right upper Bracket.
  13. Tighten the M5*10 Cross head screws on the Right upper Bracket using Electric screwdriver.VEVOR HT W6412 Open Frame Server Rack - Electric Bracket 1
  14. Place Corner piece(#9) on Center Section Assembly and lower Bracket(or upper Bracket).There are 8 locations that need to be installed
  15. Tighten the M5*10 Cross head screws on the Corner piece using Electric screwdriver.VEVOR HT W6412 Open Frame Server Rack - Electric Bracket 2
  16. Place Top Pallet (#1)and Bottom Pallet (#2)on the Enclosure.
  17. Tighten the M6 Cage Nuts and M6*12 Cross hex head screws on the Corner piece using allen key
  18. Place Top panel(#10) on the Enclosure.
  19. Tighten the M5*10 Cross head screws on the Top panel using Electric screwdriver.

Ground the Rack

  1. Insert an M6 Screw through the Grounding Point on the Grounding Wire and into the Ground Hole located on the bottom of the Rack.
  2. Run the Grounding Wire under the Rack’s Frame.
  3. Connect the Grounding Wire to an Earth Ground Connection.

VEVOR HT W6412 Open Frame Server Rack - Rack

LIMITATION OF LIABILITY

In no event shall the liability of vevor (or their officers,directors,employees or agents)for any damages(whether direct or indirect, special, punitive, incidental, consequential, or otherwise), loss of profits, loss of business,or any pecuniary loss, arising out of or related to the use of the product exceed the actual price paid for the product. Some states do not allow the exclusion or limitation of incidental or consequential damages. If such laws apply, the limitations or exclusions contained in this statement may not apply to you.

PRODUCT PARAMETER

Name Adjustable Open Frame Server Rack
Model HT-W6412
Adjustable Depth 15″-40″
Installation Width Standard 19″
Height 12U
Ground-Mounted Load-Bearing 200 lbs
Wall-Mounted Load-Bearing 100 lbs
Product Size 585510626mm
Package Size 710610170mm
Weight N.W.: 14.15Kg
G.W.: 17.35Kg N.W.: 14.45Kg
G.W.: 17.95Kg N.W.: 14.95Kg

G.W.: 18.75Kg

Address :Baoshanqu Shuangchenglu 803long 11hao 1602A-1609shi Shanghai
Imported to USA: VEVOR STORE INC, 9448 RINCHMOND PL #E RANCHO CUCAMONGA, California, 91730 United States of America
Made In China

VEVOR Logo Technical Support and E-Warranty Certificate
www.vevor.com/support
Technical Support and E-Warranty Certificatewww.vevor.com/support

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals