STEEL GREEN SG36 Zero-Turn Sprayer Instruction Manual
- June 13, 2024
- STEEL GREEN
Table of Contents
STEEL GREEN SG36 Zero-Turn Sprayer
Models: SG36, SG42
7 GAL. SUPPLEMENTAL EXPLODED VIEW \ LEFT SIDE
PARTS LIST
ITEM| QTY| PART NUMBER| DESCRIPTION
1| 2| S51242| BULKHEAD FITTING, TANK
2| 1| S51243| CAP, TANK
3| 4| CB-51634| CARRIAGE BOLT, SS – 5/16-18 x 3/4
4| 4| HFNCS-516S| HEX FLANGE NUT, SS – 5/16-18
5| 4| HFSSC-3875| HEX FLANGE BOLT 3/8 X 3/4
6| 1| M10007-L| TANK, 7 GALLON
7| 1| R21-113| ANTI VORTEX PLATE
8| 2| S52041| 90 ELBOW, 3/4 MNPT X 3/4 FNPT
9| 2| S52051| BUSHING, PIPE, 3/4 X 1/2
10| 2| S51266| 1/2 BALL VALVE
11| 1| S52013| 1/2 MNPT X 1/2 HOSE BARB
12| 1| S52025| ELBOW, 1/2 MPT X 1/2 BARB
13| 1| R22-164| TANK SUPPORT.7 GAL., LEFT SG36
7 GAL. SUPPLEMENTAL EXPLODED VIEW \ RIGHT SIDE
PARTS LIST
ITEM| QTY| PART NUMBER| DESCRIPTION
1| 2| S51242| BULKHEAD FITTING, TANK
2| 1| S51243| CAP, TANK
3| 4| CB-51634| CARRIAGE BOLT, SS – 5/ 16-18 x 3/ 4
4| 4| HFNCS-516S| HEX FLANGE NUT, SS – 5/ 16-18
5| 4| HFSSC-3875| HEX FLANGE BOLT 3/8 X 3/ 4
6| 1| M10007-R| TANK, 7 GALLON
7| 1| R21-113| ANTI VORTEX PLATE
8| 2| S52041| 90 ELBOW, 3/ 4 MNPT X 3/ 4 FNPT
9| 2| S52051| BUSHING, PIPE, 3/ 4 X 1/ 2
10| 2| S51266| 1/ 2 BALL VALVE
11| 1| S52013| 1/ 2 MNPT X 1/ 2 HOSE BARB
12| 1| S52025| ELBOW, 1/ 2 MPT X 1 / 2 BARB
13| 1| R22-164-R| TANK SUPPORT.7 GAL., RIGHT SG36
7 GAL. SUPPLEMENTAL TANK ASSEMBLY INSTRUCTIONS
STEP ONE: Disconnect the battery, ground first and then power wire.
STEP TWO: Remove existing storage container and support bracket from the
frame.
NOTE: Instructions are the same for the right and left side
STEP THREE: Install the supplemental tank to the frame as shown.
NOTE:
- Instructions are the same for the right and left side.
- Parts shown clear for clarity
NOTE:
- Before beginning step four, BE SURE there is no pressure on the lines and fluid is drained.
- Parts removed for clarity
STEP FOUR:
- Remove the knee pad to access the suction & return lines.
- Carefully cut and install the “tee” fittings in the “suction” and “return” lines as shown (blue arrows). Securely fasten with 3/4 hose clamps.
- Next install the 90 degree elbows.
PART S LIST
ITEM| QTY| PART NUMBER| DESCRIPTION
1| 4| 12HS| HOSE CLAMP, 3/4
2| 2| SS2009| TEE FITTING, 3/4 HOSE X 3/4 MNPT
3| 2| SS2035| 3/4 FNPT X 1/2 HOSE BARB
STEP FIVE:
NOTE: Slide the protective wrap over the hose and secure it with zip ties before connecting.
- Measure and cut 1/2” hose and connect one end to the suction port on the bottom of the 7 gallon tank and the other end to the “tee” fitting in the suction line.
- Route the hose between the upright and the tank.
- Securely fasten each end with 1/2” hose clamp.
STEP SIX:
NOTE : Slide the protective wrap over the hose and secure it with zip ties before connecting.
- Measure and cut 1/2” hose, connecting one end to the return port on the top of the 7 gallon tank and the other end to the “tee” fitting in the return line.
- Route the hose between the upright and the tank.
- Securely fasten each end with 1/2” hose clamps
STEP SEVEN: Reconnect the battery power wire first along with the pump power wire from the wiring harness, and then reconnect the ground wire.
MANUAL PART NO.| MANUAL REV.| DESCRIPTION| KIT PART
NO.
---|---|---|---
SGM-009| B| SG36-42 7 GALLON SUPPLIMENTAL TANK| A10033
Customer Support
Steel Green Mfg.
824 S State Road 39
Lebanon, IN 46052
(765)-481-2890
www.steelgreenmfg.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>