STEEL GREEN SG46 35 Gallon Tank Attachment Instruction Manual
- June 13, 2024
- STEEL GREEN
Table of Contents
STEEL GREEN SG46 35 Gallon Tank Attachment
Product Information
- Product Name: 35 Gallon Tank Attachment
- Models: SG46, & SG52
- Manufacturer: Steel Green Mfg.
- Manufacturer Address: 824 S State Road 39 Lebanon, IN 46052
- Contact Number: (765)-481-2890
- Website:www.steelgreenmfg.com
Product Usage Instructions
- STEP ONE: Prepare the ground for installation.
- STEP TWO: Disconnect the hoses from the hopper and connect them to the circulation fitting.
- NOTE: Hold the hoses up to prevent oil spillage.
- STEP THREE : Disconnect the cables from the dash.
- STEP FOUR : Remove the six bolts that hold the hopper assembly to the frame and lift the hopper assembly from the frame. Ensure that the hopper is empty before proceeding.
- STEP FIVE: Attach the valve assembly to the left side of the upright.
- STEP SIX : Remove the two bolts that secure the gas tank support and attach the valve assembly to the left side of the upright.
- STEP SEVEN: Connect the suction lines.
- STEP EIGHT: Connect the return lines.
- STEP NINE : Attach the valve assembly with a foam marker and suction return.
- STEP TEN: Finish the installation by connecting the power source.
PARTS DESCRIPTION
INSTALLATION INSTRUCTION
STEP ONE:
- Disconnect the battery, ground first, and then power wire.
- Remove the battery from the battery box.
- STEP TWO: Disconnect the hoses from the hopper and connect them to the circulation fitting.
- NOTE: Hold the hoses up to prevent oil spillage
- STEP THREE: Disconnect the cables from the dash.
- NOTE: Be sure the hopper is empty before proceeding.
- STEP FOUR: Remove the six bolts that hold the hopper assembly to the frame and lift the hopper assembly from the frame.
STEP FIVE:
- Set the 35-gallon tank assembly on the frame.
- Attach it to the frame with the six bolts.
- STEP SIX: Remove the (2) bolts that secure the gas tank support and Attach the valve assembly to the left side of the upright.
NOTE:
- Before beginning step seven, BE SURE there is no pressure on the lines and fluid is drained.
- Parts were removed for clarity.
STEP SEVEN:
- Remove the knee pad to access the return & suction lines.
- Carefully cut and install the “tee” fittings in the “suction” and “return” lines as shown (blue arrows). Securely fasten with 3/4 hose clamps.
PARTS LIST
ITEM| QTY| PART NUMBER| DESCRIPTION
1| 4| 12HS| HOSE CLAMP, 3/4
2| 2| S50062| TEE FITTING, 3/4 HOSE
STEP EIGHT:
- Cut and install 3/4” suction hose, connecting one end to the suction fitting on the top valve and the other end to the “tee” fitting in the suction line.
- Cut and install 3/4” return hose, connecting one end to the return fitting on the bottom valve and the other end to the “tee” fitting in the return line.
- Securely fasten each end with 3/4” hose clamp.
- STEP NINE: Connect the “quick disconnect” hoses from the tank to the valves.
- The top valve is SUCTION.
- The bottom valve is RETURN.
STEP TEN:
- Set the battery in the battery box.
- Reconnect the battery cables, power cables, and wires first followed by the ground wire.
- Attach the battery box cover and bungee strap.
- Steel Green Mfg. 824 S State Road 39 Lebanon, IN 46052 (765)-481-2890 www.steelgreenmfg.com
MANUAL PART NO.| MANUAL REV.| DESCRIPTION| KIT
PART NO.
---|---|---|---
SGM-008| B| 35-GALLON TANK ATTACHMENT|
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>