STEEL GREEN SG36 20 Gallon Supplemental Tank Instruction Manual

June 13, 2024
STEEL GREEN

STEEL GREEN SG36 20 Gallon Supplemental Tank

STEEL GREEN SG36 20 Gallon Supplemental Tank

20 GALLON INSTALL INSTRUCTIONS

STEP ONE:

  • Disconnect the battery, ground first and then power wire.
  • Remove the battery from the battery box
    20 GALLON INSTALL INSTRUCTIONS

STEP TWO: Disconnect the hoses from the hopper and connect them to the circulation fitting.

NOTE: Hold the hoses up to prevent oil spillage

20 GALLON INSTALL INSTRUCTIONS

STEP THREE: Disconnect the cables from the dash.

20 GALLON INSTALL INSTRUCTIONS

NOTE: Be sure the hopper is empty before proceeding.

STEP FOUR: Remove the six bolts that hold the hopper assembly to the frame and lift the hopper assembly from the frame.

20 GALLON INSTALL INSTRUCTIONS

STEP FIVE:

  • Set the 20 gallon tank assembly on the frame.
  • Attach it to the frame with the six bolts.
    20 GALLON INSTALL INSTRUCTIONS

STEP SIX: Attach the valve assembly to the corner of the dash panel.

  • VALVE ASSEMBLY
    VALVE ASSEMBLY

  • VALVE ASSEMBLY W/FOAM MARKER
    VALVE ASSEMBLY W/FOAM MARKER

20 GALLON INSTALL INSTRUCTIONS

NOTE:

  • Before beginning step seven, BE SURE there is no pressure on the lines and fluid is drained.
  • Parts not shown for clarity.

STEP SEVEN:

  • Remove the knee pad to access the return & suction lines.
  • Carefully cut and install the “tee” fittings in the “suction” and “return” lines as shown (blue arrows). Securely fasten with 3/4 hose clamps.
    20 GALLON INSTALL INSTRUCTIONS

PARTS LIST

ITEM| QTY| PART NUMBER| DESCRIPTION
1| 4| 12HS| HOSE CLAMP, 3/4
2| 2| S50062| TEE FITTING, 3/4 HOSE

STEP EIGHT:

  • Cut and install 3/4” suction hose, connecting one end to the suction fitting on the top valve and the other end to the “tee” fitting in the suction line.
  • Cut and install 3/4” return hose, connecting one end to the return fitting on the bottom valve and the other end to the “tee” fitting in the return line.
  • Securely fasten each end with 3/4” hose clamp.20 GALLON INSTALL INSTRUCTIONS
    20 GALLON INSTALL INSTRUCTIONS

STEP NINE: Connect the “quick disconnect” hoses from the tank to the valves.

20 GALLON INSTALL INSTRUCTIONS

  • VALVE ASSEMBLY
    VALVE ASSEMBLY

  • VALVE ASSEMBLY W/FOAM MARKER
    VALVE ASSEMBLY W/FOAM MARKER

STEP TEN:

  • Set the battery in the battery box.
  • Reattach the battery cables, power cable and wires first followed by the ground wire.
  • Attach the battery box cover and bungie strap.
    VALVE ASSEMBLY W/FOAM MARKER
MANUAL PART NO. MANUAL REV. DESCRIPTION KIT PART NO.
SGM-005 B 20 GALLON TANK ATTACHMENT P10037

Customer Support

Steel Green Mfg.
824 S State Road 39
Lebanon, IN 46052
(765)-481-2890
www.steelgreenmfg.com

Logo Logo

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

STEEL GREEN User Manuals

Related Manuals