VEVOR YCS-90 Steam Generator 6KW Instruction Manual
- June 13, 2024
- VEVOR
Table of Contents
- Product Information
- Technical Information of Generator and Control Panel
- Product Usage Instructions
- Caution in Steam Bath
- Technical Information of Generator and Control Panel
- Installation and Operation of TC-03 Control Panel
- Installation of Steam Generator’s Circuitry
- Maintenance and Repair of Steam Generator
- Trouble shooting
- Before installation
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
VEVOR YCS-90 Steam Generator 6KW
Product Information
- The product being referred to is a steam generator. It is manufactured by VEVOR. The user manual provides important instructions and information that should be read carefully before operating the steam generator. VEVOR reserves the right to interpret the user manual. The appearance of the product may vary from what is shown in the manual. Customers will not be informed of any technology or software updates for the product.
- There are certain cautions to be observed when using the steam bath. Elderly individuals, pregnant women, patients with heart disease, hypertension, diabetes, and others with health problems are advised not to use the machine unless under a doctor’s instruction. Smoking, exercising, and drinking alcoholic beverages are prohibited while using the steam generator. If feeling uncomfortable, sick, or exhausted, it is recommended to exit the steam room as soon as possible. Children should be supervised at all times and not left alone when using the machine. A small vent for fresh air in the steam room is necessary.
Technical Information of Generator and Control Panel
YCS-90 Steam Generator (Form 1):
- Model: YCS-90
- Power: 9 kW
- Voltage: 220-240V
- Specification Cables to (LWH,mm): 445182313
- Fuse (A): 54
YCS Steam Generator (Form 2):
- Model: TC-03
- Controllable temperature: 35-55°C
- Time(minutes): 2-60
- Specification(LWH): 17011055mm
Product Usage Instructions
Installation and Operation of TC-03 Control Panel
To start the generator’s operation, slightly touch the POWER button.
Touching the button again will stop the generator’s operation, and the
indicating light will turn off. The heating time of the steam generator can be
adjusted through the control panel. When the heating time is reached, the
operation will stop automatically.
Position Outside Steam Room
It is recommended to install the control panel at a height of 1.2m. A hole
with a diameter of 38mm should be made in the wall for installing the control
panel. The connection cable should go through the joint’s protective cover to
prevent it from being buried in the wall. After installation and inspection of
the control panel, start the machine.
Installation of Control Panel and Connection Cable
Plug the connection cable’s plug into the matching socket on the steam
generator. Tear off the sticker from the panel’s back, stick the panel on the
wall, and seal the panel’s edge on the wall with silica gel.
Wiring
Route the wire through the right hole in the wall. Take care to protect the
wire when going through the wall, avoiding extreme bending, sharp wooden
fibers, and nails. If necessary, the wire can be routed through a pipe for
renewal.
Operating and Testing Generator and Control Panel
After installing the piping system and circuitry, turn on the water valve
and power switch. Slightly touch the POWER button to start the steam
generator. Once the preset time is reached, the steam generator will
automatically stop working, and the light will turn off. It is important to
note that operating the generator without water is prohibited.
Installation of Steam Generator and Piping System
All machines manufactured by VEVOR are correctly assembled and carefully
tested. Before installation, ensure that all electric switches are shut off
and verify that the generator is suitable for the steam room. Refer to Form3
for detailed instructions.
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won’t inform you again if there is any technology or software updates on our product.
Caution in Steam Bath
- Elders,pregnant women,patients with heart disease / hyper tension / sugar diabetes and others with health problems who are not suitable for Steam Bath can not use the machine,besides under doctor’s instruction.
- Smoking / doing exercises / drinking alcoholic beverages is prohibited.
- If feeling uncomfortable, sick or exhausted,please get out as soon as possible.
- Take care of children.Do not leave them alone when using the machine.
- A small vent for fresh air of Steam Room is necessary.
Technical Information of Generator and Control Panel
Technical Information of YCS-90 Steam Generator (Form 1 ):
Model| Power(Kw)| Voltage| Specification
(LWH,mm)
| Cables to 220-240V| Fuse
( A )
---|---|---|---|---|---
YCS-90| 9| 220V| 445182313| 7AWG| ≥54
Technical Information of YCS Steam Generator (Form 2 )
Model| Controllable
Time(minutes)
| Controllable temperature
(35-55℃ is suggested)
| Specification(LWH)
---|---|---|---
TC-03| 2-60| 35-55℃| 17011055mm
Installation and Operation of TC-03 Control Panel
Slightly touching the POWER button starts the generator’s operation,touching that button again,stops the generator’s operation and the indicating light turns off. User could adjust the heating time of steam generator through this control panel. If it arrive the heating time,the operation will stop automatically.
Position
- Outside Steam Room The height of 1.2m is recommended to install the Control Panel.A hole with 38mm’s diameter in the wall is needed to install for the Control Panel.The connection cable should go through the joint’s protective cover in case of being buried in the wall.(Figure 2 )
- After installation and inspection of Control Panel,start the machine.
Installation of Control Panel and Connection cable
Plug the connection cable’s plug into the matching socket on Steam
Generator(Figure 3 ).Tear the sticker from the Panel’s back, stick the Panel
on the wall,and seal the Panel’s edge on the wall with silica gel.
Wiring
Wire through the right hole in the wall.Do properly protect the wire when
going through the wall.Be careful of extreme bending, sharp wooden fibers and
nails.If necessary,the wire can go through a pipe for renewal.
.Operating an Testing Generator and Control Panel
After installation of piping system and circuitry,turn on the water valve and
power switch.Slightly touching the POWER button.After arriving the preset
time,Steam Generator stops working automatically, and the light turns off.
Operation without water is prohibited!
Installation of Steam Generator and Piping System
- ALL machines manufactured in our factory have been rightly assembled and carefully tested.
- Shut off all electric switches and make sure that Generator suits Steam Room before installation Refer to Form3.
Model| Room being heated
( CBM )
| Power(Kw)| Voltage| Specification (LWH,mm)| Connection thread size(Water- inlet,
Steam-outlet,
Water-outlet)
---|---|---|---|---|---
YCS-90| 10-12| 9| 220V| 445182313| 1 /2”BSP
Installation of Steam Generator
- Firmly install it on the wall or at dry places near bathtub/bath room.Place the machine vertically.Loosen screws on machine’s top cover.Take away the top cover.Fix the machine by fastening the left and right back.The suitable installing position is closet/room on top floor/basement near bath areas. For easy repair,the nameplate should be seen apparently and the machine should be placed where it is convenient for after-sale services.Refer to Installation Suggestion(Figure 4 )
- Don’t install Generator outdoors/in humidity/in hot places/where it is easy to get frozen or rotted/ near paints,thinner or petrol.During operation,be careful of steam piping system and safety valve in case of being burnt.
- Steam Generator must be vertically placed.
Installation of Piping System
Water Supplying Piping System and Steam Piping System must be installed
according to national standards and regulations before sealing the wall.
- The water inlet pipe,metal hose of 0.5 inch’s diameter,connects Generator’s water inlet and water supplying system’s valve.(Figure 5 )
- The diameter of steam outlet copper pipe should be no less than 0.5inch. (Black metal pipe or galvanized pipe is prohibited to use in case of rusting and dirtying the wall.)The steam pipe should be no more than 3 meters long.If it is more than 3 meters,some special works for heat preservation should be done.(Figure 5 )
- The draining pipe should be connected to a pipe whose diameter is no less than 3 inches in case of damaging Steam Room during draining.
- Steam Nozzle should be installed inside Room.Connect decorative cover to steam pipe joint,seal it with gel and screw steam nozzle on.Control the strength properly in case of destroying the decorative cover and nozzle.The outlet of nozzle must be downwards.
Caution:
- If Generator is installed where it is hard for users to arrive,the water supplying valve should be installed where it is easy to arrive in emergency.
- The pressure magnetic valve can stand is 1 kg/cm².If the water pressure is too high,turn the water supplying valve down or install a pressure reducing valve in water supplying pipe.
- Saddle valve or needle-shape valve is not suitable to be in drain pipe. Completely dredge and rinse the pipe before connection.
- Don’t install Generator outdoors but vertically install it where it’s easy for maintenance service with arrows pointing up.
- The piping system must be of copper pipes.Otherwise,it may damage the machine. All joints/gap must be completely sealed in case of machine’s damage by leaking steam.If the hot water in water tank goes into Steam Room,it may cause human burn or Room damage.Please install some proper protective devices according to practical situation.
Installation of Steam Generator’s Circuitry
Power Installation of Steam Generator
- Make sure of proper voltage Refer to the nameplate of machine or Form 1.
- Fuse or breaker must be installed according to Form 3.Some relative protective devices against electricity leakage are also needed.
- Use the wire with proper model by the local requirement.If necessary,install a socket bear Steam Generator.The plug and socket must match.(Refer to the Specific instruction) After sealing the gap/hole in the wall, connect Generator and Control Panel with wire.
- Plug the power wire and connection cable to Control Panel into matching sockets in Generator.After fixing Generator’s cover and Control Panel,turn Generator’s Power switch on.Turn Control Panel’s switch on.Now the machine starts working.
- The following diagram shows the method of wiring.
Inspection
Do inspection as the following before Generator’s Operation.
- Connect the machine to the earth with proper wire whose diameter should be more than 4mm.
- Use Generator with proper model.If not,the presetting temperature may not reach inside Steam Room.
- Ensure the proper voltage for Generator. If Generator of 220V works under 380 voltage,its heating elements and circuit maybe damaged.
- Place Generator vertically.
- Use wires,breakers and protective devices against electricity leakage with proper models.
Caution:
Shut off all power switches before installation,maintenance and repair. Don’t
add any other electrical devices to Generator and Control Panel. Don’t use
Generator and Control Panel as power device for other machines. Make sure of
the normal operation of earth wire and power wire.
Installation,operation,maintenance and repair,please strictly use spare parts
appointed by Manufacturer so as to ensure the machine’s safe and continuous
operation.
Maintenance and Repair of Steam Generator
Maintenance
- Check Generator,steam nozzle,spare parts and piping joints regularly in case of water leakage and machine damage.
- Its important to rinse and discharge deposits in water tank .This work should be daily done or frequently done according to the local water quality and steam usage frequency.
- Be careful about over-heating at any circumstance.Check the firmness of all electric joints.
Repair
-
replace heating elements: Shut off power,discharge the water out from water tank,take off the top cover and heating elements cover,mark the places where the wires are connected,remove the wire,and take heating elements out. Wear a gum ring around the joints of heating elements,eliminate water fur from water thank,and properly place new heating elements and tighten them.(Press the gum ring tightly without turning it out from inside)
-
connect wires again,check the joints in case of water leakage,and place all covers back.
-
replace circuit: Shut off power and water,remove the front cover,and mark the place of water level probe.Remove the wires from the probe and circuit, place a new probe,and screw it to the normal position. Connect the wire to the probe.
Caution:- Shut off power switches before maintenance and repair.
- Normally operate the machine once after maintenance and repair as a test.
Trouble shooting
Symptom | Possible cause | Remedy |
---|---|---|
No steam while controller has been pressed the “POWER” position | 1. steam |
generator hasn’t been connected to the water supply 2. The controller fails to function 3. The steam generator fails to function
4. Drain pipe valve hasn’t been shut off
| 1.At least 10 minutes wait after the controller opened
2.Check if the power is on and the water supply valve is open 3.Check if the Drain pipe valve of generator is closed
Still produces steam when the controller has been turned off.| 1. The
controller fails to function. 2. The steam generator fails to function.| 1.
Switch off the circuit protector
Water flows out from the steam head| The steam generator fails to function|
1.Switch off the circuit protector.
2. Shut off water supply valve
Before installation
Check that the following parts are included in the packaging:
- .Steam generator
- Control (with temperature sensor cable)
- Connection cable (between control and steam generator)
- Steam nozzle
- Drain pipe valve
- Bracket screws x 2 (6*40mm)
- Fork terminal x 3 (Power connection)
- Female terminal x 2 (220V Room light connection)
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>