PANDUIT PE2VD08 PatchRunner 2 Cable Manager Instruction Manual

June 13, 2024
PANDUIT

**PANDUIT PE2VD08 PatchRunner 2 Cable Manager Instruction Manual

**

Part Numbers

Style Front/Rear Two doors Front Only Single Door Front/Rear Single door
7ft Tall PE2VD06 PE2VD08 PE2VD10 PE2VD12 PE2VFD06PE2VFD08PE2VFD10PE2VFD12

PE2VSD06PE2VSD08PE2VSD10PE2VSD12
8ft Tall| PE2VD0696PE2VD0896PE2VD1096PE2VD1296| PE2VFD0696PE2VFD0896PE2VFD1096PE2VFD1296| PE2VSD0696PE2VSD0896PE2VSD1096PE2VSD1296
Add “WH” as a suffix to the part numbers listed above to identify a white part, such as PE2VD06WH

LIST OF COMPATIBLE RACKS

Style 4-Post 2-Post
7ft Tall R4P/R4PCNR4P23/R4P23CNR4P36/R4P36CNR4P42/R4P42CNAR4P/AR4PCN

R2PR2PSR2PWR2P6S
8ft Tall| R4P96/R4PCN96R4P2396/R4P23CN96R4P3696
/R4P36CN96R4P4296/R4P42CN96AR4P96/AR4PCN96| R2P96R2P6S96
6.5ft Tall| R4P79/R4PCN79| R2P79
Part Numbers with an “
” are also available in white. Add “WH” to end of part number to identify white part number.

Tools required:

  • 3mm Allen Wrench (Door Support installation)
  • 5mm Allen Wrench (Optional End of Row Bracket installation)
  • 15mm Wrench (Rack installation)

INSTALLATION INSTRUCTIONS

Installations Instructions
Installations Instructions

NOTE:
The Door Support assembly slides vertically into place in the cable manager. Orientate so that the 40/60 open areas match as shown on the next page and align mount holes. The bottom of the vertical cable manager assembly is identified by the diamond shaped cutouts at the lower edge of the side panels.

Determine Cable Manager Mount Orientation to the Rack

Mount Orientation

PATCHRUNNERTM 2 Enhanced Vertical Cable Managers may be installed with either side facing forward.

Installation of Vertical Cable Managers to Racks

The Vertical Cable Manager will mount to the rack in 3 locations using (3) M10 Serrated Flange Bolts and (3) M10 Serrated Flange Nuts on 2 Post and 4 Post racks regardless of size.

Installed view with 60% capacity side of the vertical cable manager facing
Installation of Vertical

Installed view with 40% capacity side of the vertical cable manager facing forward
Installation of Vertical

The racks have pairs of mounting holes where the vertical cable manager can be mounted, but the vertical cable manager is designed to use only one mounting hole per pair. Align the mount holes as shown. The mount holes used on the rack will be the forward holes on the top and bottom mount locations and the rear rack hole in the center mount location regardless of which side of the vertical cable manager is facing forward.

Finger Installation to Vertical Managers

  • 7 ft Managers:
  • 3 Fingers per side
  • 8 ft Managers:
  • 4 Fingers per side
  • With the shorter section
  • Installed at the top position

Finger Installation

PATCHRUNNERTM 2 Enhanced

Align finger mount tabs with mounting slots on the manager side panels. Finger sections installed pointed up with the rounded side facing inward.

Push toward the outside of the manager until you hear an audible “click”. Light tapping with a dead blow hammer may be used to fully seat the fingers.
Instructions

Finger Removal and Replacement

Step 1:
Using a flat head screwdriver, gently pry up plastic latches in (4) places indicated while at the same time applying forward pressure to the finger section.

Step 2:
Push out the finger section toward the inside of the manager.

Door Installation

Door Installation

Align Door hinge pins on 4 sides to slots on door supports and simply push closed. The door knobs will be in locked position as shown.

EIA 19” Equipment Vertical Mounting Instructions

  1. Mount the appropriate cage nuts to the square cutouts provided in the cable manager horizontal panels to allow mounting of EIA 19” equipment.
  2. Secure equipment using appropriate screws.

Mounting Instructions 

Quick Net Patch Panel

To open the door to the right, turn the left knob counterclockwise until engaged.
To open door to the left, turn the right knob clockwise until engaged.

Door Installation
Door Installation

Door Installation

End Panel Installation to PATCHRUNNERTM 2 Enhanced Vertical Managers

Part Numbers: PE2VEP, PE2VEPWH, PE2VEP96, PE2VEP96WH Installing Bottom Panel:
Panel Installation
Panel Installation
Panel Installation

Other Compatible Accessories (sold separately)

PRSP5 and PRSP7 Slack Spools
Sold Separately
Compatible Accessories

Step 1: Align spool mount buttons with keyhole slots in the cable manager horizontal panel, with the angled flange facing upwards.

Step 2: Push spool mount buttons though the keyholes and apply downward pressure until the spool clicks into place.

Step 3: To remove the spool, pull back on the mount flange while applying pressure upward.

Note: Spools will hold up to 14 lbs.

WR5E-X Cable Retainer Clip

To install cable retainer clips, place the open end of the clip around the leg of the molded finger on the vertical cable manager and position as required.
Retainer Clip

Other Compatible Accessories (sold separately)

SRB19BLY, SRB19MDBL, SRB19D5BL, SRB19D7BL Strain Relief Bars

Compatible Accessories

BR1B, BR2B Brush Seal Blank Panel 19” Panels

1RU or 2RU Brush Seal Blank Panels can be mounted vertically in the cable manager patching area using screws and cage nuts.

Brush Seal Blank Panels allow front to back cable management while maintaining a thermal seal pass through.
Seal Blank Panel

Waterfall Installation to PATCHRUNNER™ 2 Enhanced Vertical Managers

Vertical Managers 

Width adjustment of PE2VWF

  1. Adjust the width of the waterfall to fit your rack by loosening the (4) Phillips head screws (do not remove) and align them with the corresponding markers for your specific rack.
  2. Tighten the (4) Phillips head screws to set the desired width.
  3. Inside Markers are used for R2P & R2P6S racks.
  4. Outside Markers are used for R4P & AR4P racks.

For R2P: INSIDE MARKERS

INSIDE MARKERS

  1. Align waterfall slots around the backbone part of the manager as shown.
  2. Place waterfall mounting bracket under rack between the top angles so that flanges will stop the bracket. Align holes in bracket with holes in waterfall.
  3. Fasten components together using (4) M6 x 8mm screws.

For R2P6S: INSIDE MARKERS

INSIDE MARKERS 

  1. Align waterfall slots around the backbone part of the manager as shown.
  2. Place waterfall mounting bracket under rack between the top angles so that flanges will stop the bracket. Align holes in bracket with holes in waterfall.
  3. Fasten components together using (4) M6 x 8mm screws.

Waterfall Installation to PATCHRUNNER™ 2 Enhanced Vertical Managers (Cont.)

Waterfall Installation

For R4P & AR4P: OUTSIDE MARKERS

  1. Align waterfall slots around the backbone part of the manager as shown.
  2. Align holes in the waterfall with holes in the rack.
  3. Fasten components together using (2) M6 carriage bolts and (2) serrated flange hex nuts.

For Technical Support: www.panduit.com

PANDUIT Logo

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals