PANDUIT NETRUNNER Vertical Cable Manager Installation Guide
- June 1, 2024
- PANDUIT
Table of Contents
NETRUNNER Vertical Cable Managers
© Panduit Corp. 2024
INSTALLATION INSTRUCTIONS
V00030AE_07
PART NUMBERS
Table 1
VERTICAL CABLE MANAGEMENT| Mounting Kits (sold separately)|
Racks
---|---|---
Front/Rear
WMPV22E
WMPV45E WMPVHC45E
Front Only
WMPVF22E
WMPVF45E W
MPVHCF45E| WMPVCBE
(Center Mount)
(Standard mounting for Panduit 2 and 4 post racks racks. One kit Included.)|
R2P Series of Racks
R4P Series of Racks
Location Guide for Center Mounting
(R2P with WMPVCBE)
Dimensions in () parenthesis are for 6” Vertical Cable Management
Bracket Installation
Note:
For additional brackets when installing between two racks use part number
WMPVCBE. Bracket is keyed to be installed in the correct orientation.
Standard Rack Installation
Installation Instructions R2PS
using WMPVSMK side mounting kit
Note: Mount the racks to the floor (with the appropriate space between
racks indicated in Table 2.)
Table 2
Part Number | Space |
---|
WMPV22E
WMPV45E
WMPVF22E
WMPVF45E | 5″
WMPVHC45E
WMPVHCF45E *| 6.75″
- FOR USE WITH R2P6SInstallation Instructions Required mounting for R2P6S using WMPVSMK side mounting kit
Note: Mount the racks to the floor (with the appropriate space between racks indicated in Table 2.)Installing Front Only Managers for Front and Back cable management.
Use a front only manager for additional cable management on the back of the rack (see Table 2 for all compatible managers for this rack)Installation Instructions R4P using WMPVSMK side mounting kit
Note: Mount the racks to the floor (with the appropriate space between racks indicated in Table 2.)Opening and Closing Cover for WMPV managers
Wire Retainer Installation
(WR5E) SOLD SEPERATELY
For instructions in Local Languages
and Technical Support:
www.panduit.com
E-mail:
techsupport@panduit.com
Fax:
(866)405-6654
www.panduit.com
FOR TECHNICAL SUPPORT www.panduit.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>