easee Charge Ready EV Docking Station Installation Guide
- June 12, 2024
- easee
Table of Contents
Installer guide
Easee Ready
Introduction
Read the Important product information guide in the product packaging or at
easee.com/manuals before installing the product.
Installation of this product requires a mobile device with NFC or Bluetooth
support.
WARNINGS AND CAUTIONS
A Warning indicates a condition, hazard or unsafe practice that can result in
serious personal injury or death.
A Caution indicates a condition, hazard or unsafe practice that can result in
minor personal injury or damage to the product.
WARNING
This product shall only be installed, repaired or serviced by an authorised
electrician. All applicable local, regional and national regulations for
electrical installations must be respected.
Product overview
Blind cover
Protects the electrical connections from external influences.
Backplate
For attaching and connecting to the charging infrastructure.
Installation kit
Technical specifications
General
Dimensions| 256 x 193 x 78 mm (H x W x D)
Drilling hole distance| c/c 160 x 125 mm (H x W)
Backplate technical specifications
Max charging power capacity| 1.4–22 kW
6 A 1 phase – 32 A 3 phase
Up to 7.36 kW at 32 A 1 phase
Up to 22 kW at 32 A 3 phase
Voltage| 3x 230/400V AC (±10%)
Mains frequency| 50 Hz
Protection
Degree of protection| IP44
Impact resistance| IK10
Installation
Installation network| TN, IT or TT (detected automatically)
Installation circuit breaker| Max 40 A (up to 3 chargers)
Max 80 A (up to 101 chargers)
Wire cross-section| Copper wire, between 2.5 and 16 mm2.
Use the largest possible wire cross-section to make the site future-proof.
Cable diameter| 8–22 mm
Terminal torque| 5 Nm
Cable strip length| 12 mm
Planning the installation
Prior to the installation, it is recommended that you consider future charging
needs, so that you can easily expand accordingly in the future.
If several Charging Robots are connected to the same circuit, the total
current is dynamically distributed between them. The connected Charging Robots
communicate wirelessly between each other, ensuring the circuit is not
overloaded. The maximum charging current is set during configuration.
For an optimal result
- We always recommend a 3 phase installation if possible, to make it future-proof.
- If possible, use the largest approved cable crosssection (see Technical specifications). Special notes
- Several backplates can be connected in parallel, as each Charging Robot has its own protective device.
- If the charging infrastructure includes more than one Charging Robot, the backplate that is configured first becomes the master of its circuit.
- If more than 2 units are installed, the master unit should be located in the middle of the installation (if possible) for an optimal Easee Link communication.
- Site Key: During installation, a Site Key must be used to assign the Charging Robots to the correct location in the Easee Cloud. A Site Key will automatically be generated when creating a new charging site using the Easee Installer App or it can be obtained by creating a new charging site at easee.cloud.
Your house, power grid and EV
The Charging Robot automatically adapts to the power grid, the electric car
and the capacity of the electrical installation. In the table you can see what
charging effect you can expect from your installation and situation. The table
is only meant as a guide.
CAUTION
The type of installation as well as cable cross-sections must be determined by
a qualified electrician in accordance with valid local, regional and national
regulations for electrical systems.
Load| Charging power|
---|---|---
Ampere (A)| 1 phase (kW)| 3 phase (kW)1
6| 1.4| 4.1
8| 1.8| 5.5
10| 2.3| 6.9
13| 3| 9
16| 3.7| 11
20| 4.6| 13.8
25| 5.8| 17.3
32| 7.4| 22
¹Example for 400 V TN, deviating values for other grid types.
Installation instructions
WARNING
Always work with the power off and in accordance with local regulations. Use
extreme caution and follow instructions carefully.
We recommend that you watch the installation videos available on our website:
Opening Easee Ready
- Screw the locking screw at the bottom of the Easee Ready.
- Insert the two ends of the blind cover tool into the two openings at the bottom of the cover.
- Pull the tool until the blind cover comes loose and remove the cover.
- Lift the cover from the bottom and upwards.
Backplate Mounting
- Fix the backplate to a wall or structure with sufficient load-bearing capacity using the 4 wall screws provided in the mounting kit. Use suitable wall plugs for mounting and observe the local regulations for recommended installation height.
CAUTION
The installation wall must cover the entire back of the product. If this is
not possible to achieve, it is possible to use the Easee Mount.
NOTE
If you are going to install multiple backplates, now would be a good time to
mount them as well.
Backplate Preparing
- Shorten the sealing plug to fit the cable. The hole should be slightly smaller than the cable to ensure a good seal.
- Insert the cable through one of the 4 cable entries and secure it to the backplate with the strain relief provided.
- Close all cable entries that are not in use with the supplied blind plugs.
Backplate Wiring
-
Strip each wire, exposing 12 mm of copper on each. If the cable has flexible conductors, then you must use ferrules on stranded wires to make the connection.
Use the correct tools to press them. -
Tighten the screw terminals with a torque of 5 Nm.
NOTES
- When connecting multiple backplates in parallel, each screw terminal serves as a coupling point for adjacent backplates. All backplates must be connected with the same phase sequence. External junction boxes or flat cables can be used if it is more convenient.
- It’s recommended to follow the existing colour codes used in the installation. Depending on national standards, the colours of the cables can vary from the illustrations. The illustrations in this manual follow the IEC 60446 standard.
- Before turning on the power, make sure the wires are properly connected and tightened.
Backplate Configuring
-
Scan the QR code to download the Easee Installer App and create your free account.
NOTE
Your phone needs to support either NFC or Bluetooth. -
Select one of the two site setups in the Installer App:
Create new site: If this is a completely new charging site, select “Create new site”. Enter the installation details, follow the on-screen instructions and return to this guide afterwards.
Update existing site: If this site already has one or more Charging
Robots installed or if it has been created by an operator (Easee Charge),
select “Update existing site” and search for the site address. On “Site
overview”, select the circuit that you want the backplate to be part of and
select “Add another backplate”. Follow the on-screen instructions and return
to this guide afterwards.
NOTE
If the charging circuits include more than one Charging Robot, the backplate
that is configured first becomes the master unit of the charging
infrastructure. To achieve the best communication flow, the centre backplate
should be configured first.
Blind cover Closing
- Hang the blind cover at the top of the backplate and let it fall into place.
- Press the bottom of the blind cover until you hear a click.
- Screw in the blind cover screw at the bottom of the charger to secure the blind cover.
NOTE! The locking screw is necessary to secure the cover and protect the backplate from exposure.
Your Easee Ready is now installed!
-
Scan the QR code to download the Easee Installer
App and create your free account.
NOTE
Your phone needs to support either NFC or Bluetooth.
Select one of the two site setups in the Installer App: -
Create new site: If this is a completely new charging site, select “Create new site”. Enter the installation details, follow the on-screen instructions and return to this guide afterwards.
Update existing site: If this site already has one or more Charging Robots
installed or if it has been created by an operator (Easee Charge), select
“Update existing site” and search for the site address. On “Site overview”,
select the circuit that you want the backplate to be part of and select “Add
another backplate”. Follow the on-screen instructions and return to this guide
afterwards.
NOTE
If the charging circuits include more than one Charging
Robot, the backplate that is configured first becomes the master unit of the
charging infrastructure. To achieve the best communication flow, the centre
backplate should be configured first.
Maintenance
Cleaning
The product does not require cleaning to operate properly. Nevertheless, if
the product needs to be cleaned for cosmetic reasons, this is possible.
- Use a damp cloth and an all-purpose household cleaner. Avoid using strong chemicals that contain oil or alcohol, as this will discolour the plastic.
- Do not use running water or high pressure water jets.
Repair
If your charger needs to be repaired, please contact your Easee supplier.
Returns and complaints
Contact your distributor or Easee Customer Support regarding the return and
complaint of your product.
Customer support
Download the latest manuals, find answers to frequently asked questions and
useful documents and videos for your product at
easee.support.
Practical details
Warranty
The device is free from material defects and is in accordance with laws and
regulations for consumer protection in the country where the product is
purchased. All correctly installed Easee hardware is covered by our 3 years
limited warranty. If your charger needs to be repaired within this warranty
period, please contact your Easee supplier. Further information can be found
at easee.support.
Some countries may have extended warranty.
Contact details
Easee ASA
Grenseveien 19
4313 Sandnes, Norway
Org. nr: 920 292 046
You can find additional contact details for your country at
easee.com.
The information in this document is for information purposes only, is provided
as is, and may be subject to change without notice. Easee ASA including its
subsidiaries does not accept any liability for the correctness or completeness
of the information and illustrations, and is not liable or responsible for
your considerations, assessments, decisions or absence of such, or other use
of the information in this document.
No part of this publication may be re-published, reproduced, transmitted or
re-used in any other form, by any means or in any form, for your own or any
third-party’s use, unless otherwise agreed with Easee or its subsidiaries in
writing. Any permitted use shall always be done in accordance with good
practice and ensure that no harm may be caused to Easee or by misleading the
consumer.
Easee and Easee products, product names, trademarks and slogans, whether
registered or not, are Easee’s intellectual property and may not be used
without Easee’s prior written permission. All other products and services
mentioned may be trademarks or service marks of their respective owners.