allen roth FSI 1168Q DORB Double Drapery Rod User Guide

June 12, 2024
Allen+Roth

allen roth FSI 1168Q DORB Double Drapery Rod User Guide

QUICK REFERENCE GUIDE

allen roth FSI 1168Q DORB Double Drapery Rod User
Guide

Thank you for purchasing this allen + roth product. We’ve created these easy- to-follow instructions to ensure you spend your time enjoying the product instead of putting it together. But, if you need more information than what is provided here, please visit Lowes.com, search the item number and refer to the Guides & Documents tab on the product’s page.

If the item is no longer for sale, or if you have any questions or problems, please call our customer service department at 866-439-9800, 8 a.m. – 8 p.m., EST, Monday – Sunday. You could also contact us at partsplus@lowes.com.

*Image is for example only. Appearance of actual product may vary.

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list. If any part is missing or damaged, do not attempt to assemble the product.

Estimated Assembly Time: 30 minutes

TOOLS REQUIRED (NOT INCLUDED):

FEELING CONFIDENT? START YOUR NEXT PROJECT

  • Visit lowes.com for more information.

allen roth FSI 1168Q DORB Double Drapery Rod -
Products

Printed in China

TROUBLESHOOTING

allen roth FSI 1168Q DORB Double Drapery Rod -
Troubleshooting

CARE AND MAINTENANCE

  • Clean with a soft cloth.
  • Do not use abrasive cleaning agents, solvents or polishes as they may damage the finish.

PACKAGE CONTENTS

allen roth FSI 1168Q DORB Double Drapery Rod - PACKAGE
CONTENTS

HARDWARE CONTENTS

allen roth FSI 1168Q DORB Double Drapery Rod - HARDWARE
CONTENTS

INSTALLATION OVERVIEW

1 Using bracket as a guide, adjust to desired height and mark location on wall for mounting screws.

2 Remove bracket from wall. Drill pilot hole using 3/16 in. bit (not included) and insert wall anchors.

NOTE
Anchors are not needed for all installation types.

3 Attach bracket to wall using screws provided.

NOTE
Repeat steps 1 to 3 for additional brackets. Use level (not included) if necessary.

4 Extend telescopic rod slightly. Remove finial from smaller diameter rod section.

5 Slide additional rod over smaller diameter rod.

NOTE
At this point you should have a complete telescopic rod with 2 large diameter rods connected with 1 smaller diameter rod section in the middle.

NOTE
Add drapery (sold separately), extend rod to desired length and hang ready rod in brackets.

6 Extend telescopic rod through center bracket and feed remaining half of curtain panels on to rod. Fully extend rod through remaining outside bracket and screw on remaining end cap.

7 Reattach finial and tighten set screws on brackets to lock rod in place.

allen roth FSI 1168Q DORB Double Drapery Rod - Retouch
Finial

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Allen+Roth User Manuals

Related Manuals