allen roth BGLD 2-Pack 5.67-in Brushed Gold Curtain Holdbacks in the Curtain Tiebacks Instruction Manual

June 12, 2024
Allen+Roth

allen roth BGLD 2-Pack 5.67-in Brushed Gold Curtain Holdbacks in the

Curtain Tiebacks

allen-roth-BGLD-2-Pack-5.67-in-Brushed-Gold-Curtain-Holdbacks-in-the-
Curtain-Tiebacks-PRODUCT

Product Information

  • Product Name: ALLEN+ROTH
  • Trademark: ALLEN+ROTH and logo design are trademarks or registered
  • trademarks of LF, LLC
  • Assembly Time: 10 minutes

Package Contents

  • RETENEDORES x 2
  • HARDWARE CONTENTS:  AA x 4

Care and Maintenance

No specific care and maintenance instructions are provided in the text extract.

Product Usage Instructions

  1. Unpack the package and check if all the items are included.
  2. Locate the RETENEDORES and hardware contents (AA and BB).
  3. Assemble the product by following these steps: – Take one RETENEDOR and attach it to the desired location. – Use AA hardware to secure the RETENEDOR in place. Repeat this step for all RETENEDORES. – Attach the BB hardware to the designated spots on the product. Make sure they are securely fastened.
  4. Once the assembly is complete, ensure everything is properly tightened.
  5. The product is now ready for use. Please note that this is a partial text extract from the user manual. For complete and detailed instructions, please refer to the full user manual provided with the product.

ALLEN+ROTH and logo design are trademarks or registered trademarks of LF, LLC. All rights reserved. Thank you for purchasing this Allen + Roth product. We’ve created these easy-to-follow instructions to ensure you spend your time enjoying the product instead of putting it together. But, if you need more information than what is provided here, please visit Lowes.com, search for the item number, and refer to the Guides & Documents tab on the products page. If the item is no longer for sale, or if you have any questions or problems, please call our customer service department at 866-439-9800, 8 a.m. – 8 p.m., EST

TROUBLESHOOTING

allen-roth-BGLD-2-Pack-5.67-in-Brushed-Gold-Curtain-Holdbacks-in-the-
Curtain-Tiebacks-FIG-1

PREPARATION
Before beginning assembly of the product, make sure all parts are present. Compare parts with the package contents list and hardware contents list. If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 10 minutes

TOOLS REQUIRED (NOT INCLUDED)

allen-roth-BGLD-2-Pack-5.67-in-Brushed-Gold-Curtain-Holdbacks-in-the-
Curtain-Tiebacks-FIG-2

FEELING CONFIDENT? START YOUR NEXT PROJEC T

allen-roth-BGLD-2-Pack-5.67-in-Brushed-Gold-Curtain-Holdbacks-in-the-
Curtain-Tiebacks-FIG-3
Visit lowes.com for more information.

CARE AND MAINTENANCE

  • Clean with a soft cloth.
  • Do not use abrasive cleaning agents, solvents, or polishes as they may damage the finish.

PACKAGE CONTENTS

HARDWARE CONTENTS

INSTALLATION OVERVIEW

  1. Using holdback as a guide, adjust to the desired height and mark the location on the wall for mounting screws.allen-roth-BGLD-2-Pack-5.67-in-Brushed-Gold-Curtain-Holdbacks-in-the-Curtain-Tiebacks-FIG-5
  2. Remove the holdback from the wall. Drill pilot hole using 3/16 in. bit (not included) and insert wall anchors
  3. Attach the holdback to the wall using the screws provided

NOTE
Anchors are not needed for all installation types.

NOTE
Repeat steps 1 to 3 for additional holdback. Use a level (not included) if necessary.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Allen+Roth User Manuals

Related Manuals