CONSORT Wall-Mounted Convector Heater Owner’s Manual
- June 12, 2024
- Consort
Table of Contents
Wall-Mounted Convector Heater
INSTALLATION AND MAINTENANCE MANUAL OF WALL-MOUNTED CONVECTORS
Take the convector out of its package, remove the front panel, and then
measure and transfer to the wall the location of assembly spots of the back
casing.
The distance of convector to floor level and its distance to the window level
should be both no less than 10 cm.
After preparation of holes and insertion of wall plugs hang the back casing
and the heat ex-changer on the wall. Secure all fastening screws tightly.
The next step is the hydraulic connection of exchanger with central heating
installation – make sure that the connectors were correctly counter-locked.
The convectors central heating flow piping is to be connected to the
thermostatic valve installed on the upper connector of convector.
After completed hydraulic works put on the front panel and fasten the
fastening screw that hold it from underneath. The convector assembly is
completed with the screwing in the TRV head onto the valve, and with assembly
of the decorative grille.
Wireless head can be installed instead of the thermostatic head.
Wall-mounted convector should not be covered by furniture, drapes or another
interior finish elements.
At least once a year, prior to the heating season, the convector should be
cleaned from the dust in the exchanger. Precise cleaning is possible after
removing the front casing panel, or in case of the convectors, after removal
of the decorative grille.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>