Karibu Holzpavillon Cordoba BxT: 357×357 cm Instructions
- June 12, 2024
- Karibu
Table of Contents
Holzpavillon Cordoba BxT: 357×357 cm
Instructions
Holzpavillon Cordoba BxT: 357×357 cm
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
The posts of this product should be firmly connected to the ground. We recommend H-post anchors. These should only be finally provided with concrete after the construction of this product. The H-post anchors and associated fasteners are not included with this product.
Not included
|
---|---
|
|
|
|
Note! This description is only an example! The bitumen roofing is used for initial cover and should be supplemented by a separate product according to customers choice after two months. The number of bitumen strips to be used depends on your actual house size. When joining rolls of roofing felt end to end, the overlap must be aproxximately 10cm. The roof is not safe to walk on. The roof is designed for a total load (snow, wind) and not for a point load. We recommend you to always support the roof from below during installation. The sealing of the roof surfaces to adjacent components with bitumen sealant has to be effected by the customer! If it is a saddle-roofed house, do not use roofing tiles for roofing. In this case, a 20 cm wide strip of bitumen with overhang should be installed on both sides of the eaves. For houses with a tonne roof, please install a bitumen roofing under the shingles. In the case of a flat roof the laying of roof shingles is not possible!
The replacement must be no later than two months supplemented by a suitable product
Dig a hole for each column.| The position of the column joists can be altered
due to their position on
the plank.
Position the pavilion. Insert the columns into the joists in the process.
Drill holes in the columns in order to connect them to the joists by means of
screws.| Carefully drill a drill screw through the opening in the concrete
anchor
and into the wood until the screw comes out the other side.
Attach nuts to the screws.| Fill the holes you have dug with concrete. The
concrete anchor remains attached to the slat. Then, smooth out the concrete.
The posts are completely set in concrete.
64645
First compare the list of materials with your package contents! Please understand that complaints can be processed in the non-built status only!
|
---|---
|
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>