VEVOR WC30 Tool Cabinet Instruction Manual

October 30, 2023
VEVOR

VEVOR logo Support and E-Warranty Certificatehttps://www.vevor.com/support
INSTRUCTIONS FOR TOOL CABINET
ASSEMBLY VEVOR WC30 Tool CabinetMODEL:WC30

WC30 Tool Cabinet

We continue to be committed to provide you tools with competitive price.
“Save Half”, “Half Price” or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and doses not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully when you are placing an order with us if you are actually saving half in comparison with the top major brands.

NEED HELP? CONTACT US!
Have product questions? Need technical support? Please feel free to contact us:
CustomerService@vevor.com
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won’t inform you again if there are any technology or software updates on our product.
Please read instructions carefully before assembly.
Warning-To reduce the risk of injury, user must read instructions manual carefully.

Assembly Parts List

Par Description Qty
1 Left side panel

| 1
2| Right side panel| 1
3| Back panel| 1
4| Top cover| 1
5| Bottom|

| 1
6| Shelf| 1
7| Door| 1
8| Wall Hang panel| 2
9| Hang top panel|

VEVOR WC30 Tool Cabinet - icon 3

| 1
10| Hang bottom panel| 1
11| Gas spring| 2
12| Bolt-M3x6| 12
13| Bolt-M6x15|

VEVOR WC30 Tool Cabinet - icon 4

| 34
14| Screw-ST6.338| 10
15| Rubber plug 8
40mm| 10
16| Positioning board| 1

Tools are required for assembly:

  1. Phillips screwdriver.
  2. Rubber mallet.

Safety Tips:

  1. Lay a soft cloth or paper on the floor before assembly to prevent the floor from scratching the parts.
  2. The maximum load of each layer after assembly is 120 LBS.
  3. The weight limit of each object is 40lbs

Table of Parameters

Items Description
Name Tool Cabinet
Model WC30
External dimensions 770×318×500 mm

30.3×12.5×19.7 inch
Package Size| 850×590×135 mm
G.W.| 15.5 kg

Instructions for Installation

STEP 1
Insert back (3)into the buckles of left side plate(1) and right side plate(2). Then use gelatin hammer to flap until the alignment at the top and secure them with boltM6*15(13).  VEVOR WC30 Tool Cabinet - STEP 1 STEP 2
Step 2: Align bottom’s(5) and hang bottom panel’s(10) holes to left and right side panel’ bottom holes, and secure them with (13)M6x15. STEP 3
Do the same to top cover(4) and hang top panel(9), secure them with bolt- M6x15(13).VEVOR WC30 Tool Cabinet - STEP 3 STEP 4
Tilt the shelf (6) into the box, place the shelf from top to bottom, and insert the left, right and back sides of the shelf into the left and right side panels and the backplane hanging brackets at the appropriate height. The installation is complete.VEVOR WC30 Tool Cabinet - STEP
4 STEP 5
As shown in the figure, first insert the dowel on the top left of the door into the left side panel hole, and then insert the dowel on the top right of the door into the right panel hole.VEVOR WC30 Tool Cabinet - STEP
5 STEP 6
Before installing the gas spring (11), it is necessary to disassemble the spring support (as shown in the figure), install the base and the pressure rod of the support on the door panel and the box body respectively, lock and fix them with the 11-word large flat head screw M3x6, and then fix the base and pressure rod of the spring support with the removed screws.VEVOR WC30 Tool
Cabinet - STEP 6 STEP 7
As shown in the figure, first paste the positioning board (16) on the wall to draw the positioning line and drill holes, then install the rubber plug (15) into the wall with drilled holes, and then align the mounting hole of the wall hang plate(8) with the installation hole of the rubber plug and use the screw- ST6.3×38(14)to lock and fix .VEVOR WC30 Tool Cabinet - STEP
7

VEVOR logoManufacturer:Zhongshan City CYZ Coating Tech.Co.,Ltd.
Address:Plant1,No.78,Zhongheng Avenue,Baoyu Village, Henglan Town,
Zhongshan City,Guangdong Province,China
MADE IN CHINA
Support and E-Warranty Certificate https://www.vevor.com/support

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals