Beacon LD-ST5008-GU10 Spotlight Body for 1 Phase Instruction Manual
- October 30, 2023
- BEACON
Table of Contents
Beacon LD-ST5008-GU10 Spotlight Body for 1 Phase
THANK YOU FOR PURCHASING THIS QUALITY LUCCI PRODUCT. TO ENSURE CORRECT FUNCTION AND SAFETY, PLEASE READ AND SAVE ALL INSTRUCTIONS CAREFULLY BEFORE USING THE PRODUCT.
WARRANTY
- This light fitting is covered by a 12 month warranty; please retain proof of purchase and evidence of installation by a licensed electrician.
- Warranty will be void if there is any damage due to improper usage or modification to the fitting.
INSTALLATION
INSTALLATION REQUIREMENTS
-
Must be installed by a licensed electrician.
-
All wiring and installation of the light fitting must adhere to local and national wiring codes. eg. AS/NZS 3000 latest edition.
-
This fitting is rated IP66, this must be maintained during installation.
-
Select a suitable location for installation;
- The mounting point must support 2 times the weight of the fitting.
- A clearance of 0.5m should be kept between the globe and nearest object/wall etc.
-
Do not exceed the maximum wattage rating
-
Take care not to pull any electrical wires during unpacking as this may damage the connection.
-
Lay out all the components on a smooth surface and make sure there are no components missing before assembling.
-
Check whether the fitting has been damaged during transport.
Do not operate/install any product which appears damaged in any way.
Return the complete product to the place of purchase for inspection, repair or replacement. -
Ensure all power to the circuit you are working on has been switched OFF.
INSTALLATION DIRECTIONS
-
Remove the mounting bracket from the fitting by loosening the screws with the Allen key provided.
-
Use the mounting bracket as a template to mark the screw positions onto the wall.
-
Drill holes into the wall and push the plastic screw anchors into the holes.
Ensure the plastic screw anchors used are suitable for the mounting surface. -
Install the mounting bracket onto the wall by using appropriately sized mounting screws.
Ensure the mounting screws used are suitable for the mounting surface. -
Connect the mains supply wire to the terminal block.
Ensure that the wires are secure and no bare wires are exposed.
Mains Supply Wire-
Earth – Yellow/Green
-
Neutral – Blue or Black
-
Live – Brown or Red
Fitting Wire -
Yellow/Green
-
Blue
-
Brown
-
-
Install the fitting back onto the mounting bracket and tighten the screws with the Allen key provided.
-
Install globes (not included) into the fitting. Do not exceed the maximum wattage rating.
SAFETY TIPS
- Always ensure the power is OFF and the fitting has cooled down before performing any maintenance or adjustment to the fitting.
- Always ensure the power is OFF and the fitting has cooled down before cleaning or changing the globe. Do not touch the globe with bare hands. Use a clean cloth, gloves or a tissue.
- To avoid injury or damage to the fitting, ensure that power leads and screws are secure before connecting the power.
- Ensure that the fitting does not come in contact with corrosive chemicals, etc.
- To clean, wipe with a damp clean cloth. Never soak the fitting with water.
SPECIFICATIONS
SKU # | 230396 |
---|---|
MODEL # | LD-ST5008-GU10 |
RATED VOLTAGE | 220-240V~ 50Hz |
RATED WATTAGE | 70W – Use 2 x MAX. 35W |
LAMP HOLDER | GU10 |
IP RATING | IP66 |
WEIGHT | 1.39kg |
DIMENSIONS | 206 x 75 x 95mm (H x W x E) |