BEACON BB100 Modular Shower System Instruction Manual

May 15, 2024
BEACON

BEACON BB100 Modular Shower System

BEACON-BB100-Modular-Shower-System-PRO

Product Information

Specifications:

  • Product: Beacon International BB100 Modular Shower System
  • Manufacturer: Beacon International Ltd
  • Dimensions: Varies based on model
  • Weight: Varies based on model

Product Usage Instructions

Assembly and Setup:
Before using the BB100 Modular Shower System, ensure you have completed the following steps:

  • Perform on-site safety and pre-use checks.
  • Assemble the Modular Shower System according to the provided instructions.
  • Connect the system to a suitable power supply if required.
  • Connect the NPU to the BB100.

Operating the System:
To operate the BB100 Modular Shower System:

  • Ensure all connections are secure.
  • Monitor the manometer gauge for pressure levels.
  • Regularly change BB100-NPU pre-filters for optimal performance.

Maintenance:
Proper maintenance is essential for the longevity of your BB100 system:

  • Perform daily checks to ensure everything is functioning correctly.
  • Schedule routine maintenance and inspections as recommended by the manufacturer.
  • Order spares and accessories directly from Beacon International for your BB100.

Technical Information:
Refer to the user manual for detailed technical information on the BB100 system, including dimensions, weights, performance metrics, sound levels, and wiring diagrams.

FAQ (Frequently Asked Questions):

  • Q: How do I calculate the number of air changes required for my Modular Shower System?
    A: For information on calculating airflow and enclosure requirements, refer to the provided link or contact customer support for assistance.

  • Q: What should I do if I encounter issues with my BB100 system?
    A: If you experience any problems with your BB100 Modular Shower System, refer to the troubleshooting section in the user manual or contact Beacon International’s customer support for guidance.

Introduction and company history

Thank you for purchasing a BB100 Modular Shower System. We are sure your BB100 will work hard for you and give you many years of good service with an excellent return on your investment. Beacon International Ltd have been manufacturing asbestos removal equipment since the early 1990’s. Since the company’s early beginnings, it has grown substantially and has large manufacturing plant covering 35,000 square feet. Beacon now specialise in manufacturing market leading equipment for the asbestos removal markets around the world. Please see our website for more details on our wide range of products. www.beaconinternational.co.uk.

General Health and safety advise

  • Asbestos is a class 1 carcinogenic and must be handled with care.
  • Being exposed to asbestos can cause asbestosis, mesothelioma and lung cancer.
  • It is imperative that the correct training has been given prior to any individual working with asbestos.
  • Approved breathing apparatus must be used at all times whilst you are working with asbestos.

Health and Safety Executive.
For health and safety guidance relating to asbestos, please use the HSE website http://www.hse.gov.uk/asbestos/.

For further information regarding the requirements of a Modular Shower System, refer to the Contractors guide, HSG247.

Calculating Airflow Required for Adequate Air Changes in Shower Cubicles

  • The BB100 modular shower system is designed to provide a high standard of shower facility and clean changing area for operatives to use on site.
  • In addition to the this the BB100 is designed to allow adequate ventilation and to provide protection from airborne fibre migration from Dirty through to Clean areas.
  • The BB100 incorporates a Negative Pressure Unit which is designed to be used with the BB100 and create air changes within the cubicles giving the users protection from contamination.
  • Current regulations stipulate a minimum of 30 air changes per hour within the shower system.
    • For a 3-stage system, a minimum airflow of 180m3/h is required.
    • For a 5-stage system, a minimum airflow of 300m3/h is required.
  • The Negative Pressure Unit produced specifically for the BB100 produces between 350m3/h and 400m3/h.
    N. B. These airflow figures assume the correct voltage is available on site, please check your supply before starting work.

Beacon offer a Voltage & Amperage in-line metering system which is available for monitoring onsite power supply and is available to hire or buy.

For reference and information regarding airflow and enclosure calculations, please follow the link below. http://www.hse.gov.uk/research/rrpdf/rr988.pdf

Transportation

Your BB100 is designed to be as light as possible whilst still being strong and robust when fully assembled. It is important to handle the BB100 shower panels with care whilst transporting them. Any damage caused to the panels could potentially affect the structure of the fully assembled system. The BB100 is designed to provide a safe shower and changing facility, it is in your own interest and safety to transport the system carefully. During transiting in a vehicle, ensure the panels and roof and base sections are securely fastened down in the vehicle to prevent movement and damage whilst on route.
See picture below for an example of a secure load prior to transiting.

Manual Handling
When you are loading your BB100 on and off of vehicles, please ensure you lift using the correct technique, keep your back straight and bend your legs. Please the diagram below for recommended lifting values at various heights.

Storage
When storing your BB100 modular shower units, the following instructions must be adhered to:

  • a. Always store your BB100 in a clean and dry environment. Storage in a damp and wet area will increase the risk of bacteria which could cause serious ill health to operators of the equipment.
  • b. Always thoroughly wash and clean off panels after each job has finished.
  • c. Ensure there is no dirty residue or contamination left in the base sections, thoroughly wash and clean these with shower mats removed.
  • d. Where applicable, ensure the BB100 NPU is securely sealed with a transit plate with a clean pre filter fitted prior to disassembling the BB100 shower system.

BB100 System Assembly Instructions

The Beacon BB100 Modular shower system is designed specifically with ease of assembly in mind. There are no clips, the system is locked together with custom made corner post sections, originally designed by Beacon International in 2005. The BB100 can easily be assembled by 2 persons in less than 15 minutes, once assembled the BB100 is very sturdy and robust.

Siting your BB100 in a suitable location.
It is critical that you find a flat standing on which to assemble your BB100, an uneven surface will compromise the integrity of the panel joints and will affect the function of the door opening and seals etc. See Fig 1.

Assembling the first cubicle.

  • Always start assembling the BB100 at the Clean End cubicle first. Identify the clean end door which will be labelled as “Clean” and where applicable will be fitted with a codelock. Connect 2 corner posts, one to each of the inside vertical channels of the clean end door panel. See Fig 2.
  • Next, with the two corner posts connected to the clean end door, drop the door panel over the outside lip of the base. See Fig. 3
  • While one person holds the clean end door upright, another person can now slot a side panel into the corner post section. Please note, there is a rivet on the side panels which is slightly proud of the aluminum. This must be inward facing to the top of the panels. These rivets are designed to create an interference fit with the corners pieces, once one side has been securely connected to the door panel, the two panels will be self-supporting. See Fig 4.
  • Next the second side panel can be added. For UK systems, this panel has the hole cut out for the electric box that powers the locker box heater. Slot the side panel into the corner post. Next the clean – shower door can be added, prior to offering it up to the two sides, connect two more corner pieces to the opening side of the door surround channel. The shower – clean door must open into the clean cubicle. Then offer the door up to the two sides and connect the corner pieces to each side panel.
  • To complete the structure of the clean end cubicle, drop the roof over the two doors and two sides. The roof locks all four panels securely into place leaving you with a very robust cubicle. See Fig 6.BEACON-BB100-Modular-Shower-System- \(9\)

Assembly of the Shower (middle) Cubicle.

  • Repeat the process of the first cubicle, add and slot the two side panels into the corner sections which are connected to the shower door panel. See Fig 7.
  • Now connect the shower-dirty door panel to the two shower side panels and then add the roof panel to the shower cubicle. See Fig 8.BEACON-BB100-Modular-Shower-System- \(11\)

Assembly of the Dirty End Cubicle.
Repeat the process, this time add the two dirty end side panels to the shower- dirty door section. Then connect the dirty end door to the two side panels and again, see Fig 9. Finally, drop the roof over the complete cubicle.

Added Ancillary Components and Fittings.

  • Layout shower comfort mats into each cubicle. See Fig 10.
  • Mount the electric connection boxes to the clean and dirty end cubicle side panels. (UK HSG247 Models only) See Fig 11.BEACON-BB100-Modular-Shower-System- \(14\)
  • Now place the personal locker box into the clean end cubicle and plug the heater unit into the electric socket box. Fig 12 & 13.BEACON-BB100-Modular-Shower-System- \(15\)
  • Next, mount the electric box into the dirty end and place the BB100 Internal NPU inside, taking care to insert the exhaust spigot through the side panel. The NPU is held in place by 5 plastic headed bolts which allow easy assembly and removal. See Fig 14.
  • The coat hooks need fitting into the clean and dirty cubicles, these are secured in placed by nylon bolts and wingnuts. See Fig 15.BEACON-BB100-Modular-Shower-System- \(17\)
  • The shower head assemble is attached to the wall by a purpose made bracket, see Fig 16 & 17 which shows how this is located.BEACON-BB100-Modular-Shower-System- \(18\)BEACON-BB100-Modular-Shower-System- \(19\)
  • Next thread the suck up assembly tube through the shower panel as shown in Fig 18.BEACON-BB100-Modular-Shower-System- \(20\)
  • A sink has been manufactured specifically for this modular shower system, this is a requirement for UK models (HSG247). The sink is bolted to the shower side panel as shown in Fig 19 and is secured in place by M6 plastic headed nuts and bolts.BEACON-BB100-Modular-Shower-System- \(21\)

BB100 Service and Maintenance

The BB100 modular shower system is designed to provide a temporary shower facility on site in locations where it is not possible to site a trailer type decontamination unit. The panels and corner pieces must be kept in good order, this is critical to maintaining the integrity of the structure when assembled. Should any parts become damaged, contact Beacon International to arrange either a repair or new parts. Please see parts list for a full breakdown of componentry. When an NPU is used, DOP and PAT tests need to be carried out in line with legislation, water management systems and electrical components also need to be tested.

Daily Checks
When the BB100 is assembled, it needs to be checked at regular intervals, at least once a day. It is essential that all panels are securely fitted with roofs and bases positioned correctly to hold the panels securely in place. When an NPU is used, manometer readings must be checked and clean pre-filters fitted as required. Waste water filters also need to be checked when a water management or a waste water filtration system is connected to the BB100.

Weekly Inspections
The weekly check sheet on the following page can be used to record any problems encountered with your BB100 and associated equipment. Please see example maintenance log on the following page.

Maintenance Log Example

BEACON-BB100-Modular-Shower-System- \(22\) Service and Testing (BB100 – NPU)
Service and DOP (dispersed oil particulate) testing must be carried out by a qualified company, it is a legal requirement that companies carrying out servicing and testing of asbestos removal equipment hold a HSE Ancillary Licence.

Testing intervals can vary from one country to another.

  • UK – 6 Months
  • France – 12 Months
  • Netherlands – 12 Months
  • Italy – 12 Months
  • Greece – 12 Months
  • Turkey 12 Months
  • Australia – 6 Months
  • New Zealand – 6 Months

When NPU’s have been DOP and electrically tested, a test certificate must be supplied by the testing company, this certificate must be kept on record by both the owner of the NPU and by the company carrying out the testing. Testing must be carried out by trained personnel using only calibrated test equipment. As the manufacturer, Beacon International automatically issue service reminders in the UK when your NPU is due for service and testing. If you have purchased your machine through a distributor, they will notify you when your equipment is due for its periodic test.

Spares and Accessories for your BB100 and associated equipment.
Beacon International manufacture modular shower units as well as a wide range of other asbestos removal equipment. Spare parts and accessories are available for our whole range of equipment. See parts list on the following page which includes part reference number and description for each part that makes up the BB100.

Parts List

BB100

Part No. Component Description
SIDE PANEL (PLAIN) (MOD04)
MOD02 BLUE POLY PROP SIDE PLASTIC
MOD16 ‘U’ CHANNEL (SECTION C)
SIDE PANEL C/W MIRROR (MOD06)
MOD94 295×295 MIRROR
MOD02 BLUE POLY PROP PLASTIC
MOD16 ‘U’ CHANNEL (SECTION C)
SIDE PANEL (MOD04)

C/W HOLE FOR SUCK UP MOUNTING

MOD02| BLUE POLY PROP PLASTIC
MOD16| ‘U’ CHANNEL (SECTION C)
|
| SIDE PANEL (MOD04)

C/W HOLES FOR COAT HOOK RAIL

MOD02| WHITE POLY PROP PLASTIC
MOD16| ‘U’ CHANNEL (SECTION C)
|
| ROOF ASSEMBLY COMPLETE (MOD12)
C109| 15×3 GASKET
MOD10| 2×2” ALUMINIUM FRAME
MOD11| 950x950mm NATURAL PPC
|
| ALUMINIUM CORNER SECTION (MOD13)
C225| 10×6 GASKET
MOD14| CORNER POST          (SECTION A)
|
| DOOR PANEL COMPLETE (MOD08e)
C001| NAME PLATE
C109| 15×3 GASKET
MOD27| CLEAR FLAP
MOD27a| FLAP SECURING BAR (PLASTIC)
MOD03| WHITE POLYPROP DOOR PLASTIC
MOD15| SECTION B
MOD16| ‘U’ CHANNEL (SECTION C)
MOD17| SECTION D
MOD20| MAGNETIC TAPE
MOD21| BB100 DOOR HANDLE
MOD22| ALUMINIUM ‘L’ JOINER
MOD47| HINGE
| SHOWER HEAD/HOSE ASSEMBLY (D079)
---|---
D021| ¼ TURN VALVE
D058J| EXTENDED COUPLER
D065a| ½” HOSETAIL (ROUND)
D080| SHOWER HEAD/HOSE CONNECTOR
D081| SHOWER HEAD
D083| SHOWER HOSE
WMC21| 15mm COPPER PIPE
WMC22| SOLDER RING ELBOW
|
| SUCK UP ASSEMBLY (MOD25)
MOD64| ABS TUBE
MOD62| 90° ABS BEND
MOD63| ABS TANK CONNECTOR
D065b| ¾” HOSETAIL
|
| TOOLBOX COMPLETE (MOD19a)
D022A| 15mm RUBBER WASHER
D064| HOSE CONNECTOR
D079| SHOWER HEAD/HOSE ASSEMBLY
MOD18| RUBBER MALLET
MOD19| TOOLBOX
MOD23| COAT HOOK RAIL C/W SREWS & WINGNUTS
MOD24| SHOWER HEAD MOUNTING PLATE ASSEMBLY C/W SREWS & WINGNUTS
MOD25| BB SUCK UP ASSEMBLY
MOD28| SCREW & WINGNUT SET
Part No.| Description
---|---
MOD01| SHOWER MAT
MOD04| SIDE PANEL

C/W HOLES FOR COAT HOOK MOUNTING (PLAIN)

MOD06| SIDE PANEL C/W MIRROR
MOD07| SIDE PANEL

C/W HOLE FOR SUCK UP MOUNTING

MOD08e| DOOR PANELS
MOD09| ALUMINIUM BASE
MOD12| ROOF ASSEMBLY COMPLETE
MOD13| ALUMINIUM CORNER SECTION
MOD19a| TOOLBOX COMPLETE

BB100 – NPU

Part No. Description
C001 Name Plate – Engrave on top of name plate

BS 8520-2:2009

C002| Manometer
C068| NPU Transit Plate Clip
C069| NPU Transit Plate Strike
C070| Gasket 20mmx5mm (Per metre)
C085| Red Warning Label
C109| Gasket 15mmx3mm (Per Metre)
C181| MHS-DCU Clamp Bolt (Male)
C182| MHS-DCU Clamp Bolt (Female)
C188| 1ft Tubular Heater Guard
E001| 110v 16a Plug Top
E009| 230v European Plug Top
E011| 1.5mm 3 Core Arctic Yellow Cable
E015| Conclamp Locknut
E017| 15 Amp Terminal Block
E044| Extended Cable Gland
E045| 1.5mm 3 Core Arctic Blue cable
E060| M6 Earth Bolt
E061| M6 Earth Nut
E062| 110v 16A Panel Socket
E092| 1ft Tubular Heater
F003| 12x12x2 Pre Filter
F018| 305x305x68mm HEPA Filter
M005| 110v 0.3 H.P. Motor
M006| 230v 0.3 H.P. BB100-NPU Fan Assembly
P032| MHS-DCU Case Complete

DECLARATION OF CONFORMANCE

Beacon International Ltd BB100 Modular Shower System & BB100 NPU This is to certify that Beacon International Ltd furnishes its products supplied to the European Community in accordance with the following directives and health and safety requirements.

  • 93/68/EEC CE Marketing Directive
  • IEC 335-1 General Safety Requirements, Part 1
  • IEC 335-2-41 Specific Safety Requirements, Part 1
  • IEC335-2-51 Specific Safety Requirements, Part 2
  • 73/23/EEC Low Voltage Directive (115v & 230v)
  • 89/336/EEC Electromagnetic Compatibility Directive
  • 89/392/EEC Machine Directive

further certify that the products here listed have been constructed in accordance with good engineering practices in regard to safety and quality by means of compliance through certification with ISO9001: 2008 International Quality System Standard.
BB100 Manufactured to HSG247
BB100-NPU Manufactured to BS8520-2:2009

Technical Information

BB100 Cubicles & BB100 Components – Dimensions & WeightsBEACON-BB100
-Modular-Shower-System- \(25\)

BB100-NPU Dimensions Weights and Performance

Model BB100- NPU
Length mm 385
Width  mm 525
Height mm 622
Weight (Kg) 20
Motors 1
Motor Power Watts 240
Voltage Available 110 / 230
Amperage 110v / /230v 1.6 / 0.75
Airflow m3/h 400
Pre Filter G4 290x290x45
HEPA Filter 99.997% 305x305x68

BB100-NPU Sound Levels

BB100-NPU Wiring Diagram

BEACON-BB100-Modular-Shower-System- \(27\)

Warranty

  • Beacon International Ltd offer warranty to the original purchaser of equipment.
  • Warranty will cover defects in both materials and workmanship for the period of one year from date of purchase.
  • The warranty excludes any consumable parts such as motor brushes, blocked filters or general wear and tear.
  • The warranty also excludes any accidental or intentional damage to equipment.
  • If the equipment is supplied through a distributor, the warranty must be claimed for through that distributor.
  • No claim will be granted without evidence of the validity of the claim, ie. Proof of purchase.
  • Beacon International Ltd reserve the right to charge in full or part for any repairs that are a result of misuse, neglect or wear and tear.

This equipment has been manufactured by:
Beacon International Ltd
Elgee Works
Victoria Street
Desborough
Northants
NN14 2LX
Tel. 0044 1536 762 939
Email. [email protected]

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

BEACON User Manuals

Related Manuals