WYNDHAM COLLECTION WC-5151-60-SGL 60 Inch Single Vanity with optional Carrara Marble Counter Installation Guide
- June 11, 2024
- WYNDHAM COLLECTION
Table of Contents
WYNDHAM COLLECTION WC-5151-60-SGL 60 Inch Single Vanity with optional
Carrara Marble Counter Installation Guide
- Prior to installation please check received items against the “Packing List”. Please report any missing items to your retailer immediately
- Protect all surfaces from sharp objects, high heat sources, direct prolonged sunlight and chemical hazards.
- Professional installation recommended
- Please install on a level surface. If minor door and drawer alignment is required, please follow the easy directions on the next page.
PACKING LIST
(Not all components may be included, depending upon your purchase)
-
Main Cabinet / 1
-
Counter & Sink / 1 (may not be included)
HOW TO ADJUST HINGES (if required)
-
install
-
remove
-
adjust height
-
adjust laterally
-
adjust depth
REQUIRED TOOLS NOT IN BOX
-
Silicone sealant
-
Spirit Level
-
Phillips Screwdriver
-
Tape measure
-
Pencil
-
Electric Drill
INSTALLATION INSTRUCTIONS
Scan the QR code with your phone to watch detailed video instructions or visit
www.wyndhamcollection.com/alignment
-
CABINET ALIGNMENT GUIDE
ALL cabinets are aligned, and metal trim is adjusted on a level floor before packaging. After shipping and reaching its destination, the cabinet doors and drawers may require minor alignment, depending on the condition of the floor where it will be installed. DO NOT move/adjust the door hinges or drawer glides before leveling/adjusting the cabinet on the floor. Start by adjusting the back two feet #3 and #4 by bringing the cabinet to a level position. Use a spirit level to ensure accuracy. After adjusting all four feet (front and back) check the metal trim alignment. If the metal trim lines are not aligned, start adjusting the middle two feet #5 and #6 (under the cabinet) by moving the adjustable feet UP or DOWN depending on the condition of your floor. After leveling the metal trim lines using the middle feet (under the cabinet) make sure all 6 vanity feet are firmly resting on the floor and the cabinet is perfectly level. By following the above instructions all the metal trim lines should now be aligned. Minor adjustment may be necessary by adjusting the door hinges and drawer glides, see How To Adjust Hinges on page 1, and How to Adjust Drawer Slides on page 4. -
Backboard is pre-cut for ease of installation for hot and cold valves and drains.
-
Install the counter. Seal around the top of the cabinet with clear silicone sealant. Do not over apply. Allow to dry 24 hours for proper curing
-
Remove the handles from inside the cabinet doors and drawers and reinstall on the outside. Do not over tighten when reattaching.
-
Plug in electrical outlet and USB charging hub.
HOW TO ADJUST DRAWER SLIDES (if required)
-
Up and Down Adjustment
-
Side Adjustment
-
Depth Adjustment
Scan the QR code with your phone to watch detailed video instructions or visit
www.wyndhamcollection.com/3dslides
Backboard Cutouts
*Note: All measurements are ± 1/4”.
Electrical Outlets with Charging Hub
Easy to install Long 5 foot plug in cord 2 electrical outlets, 125V 15A Tamper
Resistant (TR) outlets Power reset switch 2 USB ports, 5V 2.1A Max Use with
ground-fault circuit interrupter (GFCI) outlets only Residential use only
Follow all applicable electrical codes ETL Listed Conforms to UL Standard 962A
Certied to CAN/CSA Standard C22.2 No. 308