SUNPOWER RESERVE-BAT-1-DC-10.1-INT Solar Storage Battery Installation Guide

June 9, 2024
SUNPOWER

SUNPOWER RESERVE-BAT-1-DC-10.1-INT Solar Storage Battery

Transport

NOTICE

  • Risk of injury when lifting the battery as the battery weighs 90 kg. There is risk of injury if the battery is litted incorrectly while being transported.
  • Transport the battery always as described below.
  • Handle with care, choose the corresponding handling method according to the weight, and pay
    attention to safety.

During transportation, please follow these guidelines:

  1. The original packaging should be used for transportation.

  2. Handle with care, choose the corresponding handling method according to the weight, and pay attention to safety.

  3. During transportation, please keep the packaging away from dangerous sources and take waterproofing measures.

  4. Secure the packaging during transportation.

Dimensions

NOTICE
For additional batteries, keep a minimum spacing of 300mm. Do not stack batteries.
Dimensions

Product Overview

Product Overview

(1) Power button
(2) Battery circuit breaker
(3) LED display
(4) BAT+ power connector
(5) BAT- power connector
(6) Grounding
(7) BMS COM 1
(8) BMS COM 2 (with terminal resistor)

LED Display

The three LED indicators on the front cover provide information about the State of Change (SOC) operational status of the battery.

Symbol Description

| White LEDs flash
| White LEDs on
| LEDs are off
LED Indicator| No.| SOC| Description
---|---|---|---
LEDs show the SOC status| 1| | SOC≤10%
2| | 10%<SOC≤30%
3| | 30%<SOC≤50%
4| | 50%<SOC≤60%
5| | 60%<SOC≤90%
6| | 90%<SOC≤100%

Scope of Delivery

Scope of Delivery

Mounting Location

Installation
Electrical Connection

Grounding

Commissioning

White
Yellow Refer to manual

Connecting to the Inverter Ports

DANGER

  • DO NOT short circuit the battery terminals. First, complete the – terminal connections between battery and inverter and then complete the + terminal connections.
  • Touching a shorted battery connection may result in lethal injuries due to electric shock and massive energy release.
  • Switch off the battery breaker located on the right side of the battery when making connections.
  • Please connect both ends of one battery power cable completely before connecting the next power cable to avoid short-circuiting of the positive and negative battery power cables.



Connecting More Batteries

NOTICE

Connect the cables between the batteries and route them from the rear side of the battery.

Mounting the Side Plates

Mounting the Screw Plugs

For better appearance, the top of the expanded btery needs to be locked with plastic screws and plastic covers.

This Quick Installation Manual is not replacing the Safety and Installation Instructions, it is a short introduction to the product installation. The reference remains the Safety and Installation Instructions

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SUNPOWER User Manuals

Related Manuals