GM Lighting MTR1-5CCT-X Mini Task Fixed and Adjustable Gimbal Downlight Instruction Manual

June 9, 2024
GM Lighting

GM-Lighting-logo

GM Lighting MTR1-5CCT-X Mini Task Fixed and Adjustable Gimbal Downlight

GM-Lighting-MTR1-5CCT-X-Mini-Task-Fixed-and-Adjustable-Gimbal-Downlight-
product

WARNING

BEFORE YOU START:

  • Please check local electrical codes before beginning
  • Turn the power off before installing
  • Make sure to use properly rated wire

NOTE:
WE RECOMMEND THAT YOU ENGAGE A QUALIFIED AND LICENSED ELECTRICIAN. ALL SYSTEM PARTS ARE COMPATIBLE WITH AND ONLY WORK TOGETHER. DO NOT ATTEMPT TO SWAP OUT OTHER MANUFACTURERS’ PRODUCTS. INSURE THAT BOTH WALL SWITCH AND LED DRIVER ARE GROUNDED IN ACCORDANCE WITH NEC OR LOCAL ELECTRICAL CODES.

DO NOT INSTALL IN AN APPLICATION THAT IS OUTSIDE OF THE PRODUCTS LISTED AMBIENT TEMPERATURE AND IN AN AREA THAT IS NOT EASILY ACCESSED FOR SERVICE REQUIREMENTS. DOWNLIGHT IS IC RATED.

MOUNTING AND CONNECTION

MOUNT AND CONNECT MINITASK DRIVER AND POWER SUPPLY PER INSTRUCTIONS THAT COME WITH THAT UNIT.

  1. Familiarize yourself with the downlight fixture model to be installed. Refer to Table (Fig. 1) for cutout hole size. 120V electrical power whip should be installed by a licensed electrician before proceeding.
    CAUTION: The space behind the location of the downlight must be clear of building materials and electrical components.
    Key to Ceiling Cut-Out SizeTO****
CAT. NO. NOM. SIZE CEILING CUT-OUT
MTR1-5CCT-X MTS1-5CCT-X MTRA1-5CCT-X 1” 2-1/8” DIA.
MTR2-5CCT-X MTS2-5CCT-X MTRA2-5CCT-X 2” 2-5/8” DIA.
  1. SELECT COLOR TEMP:
    Select the color temperature of the light source. You’ll find the color temp. selector switch on the side of the junction box. You must choose one of five color temperatures before mounting the Power Supply Box (Fig. 2).

  2. INSTALLATION PREP FOR REMODEL:
    Determine the position of your downlight (s) and trace a circle on the surface material. Using a keyhole saw or hole saw – cut through the surface (Fig. 3A). NOTE: It is easier to install the power supply box at this point. Go to Steps 4 & 5A next.

  3. INSTALLATION PREP FOR NEW CONSTRUCTION:
    Use CHDL-UNV-NCP’s new construction mounting plate. Consult the mounting instructions that come with this plate (Fig. 3B). Be sure you use the correct aperture cut-out (Fig. 1) to prepare the plate for use. New Construction Plate assists with the position of the hole location and Power Supply Box mount before drywall is installed. (Fig. 3B). Do steps 4 & 5B next.GM-Lighting-
MTR1-5CCT-X-Mini-Task-Fixed-and-Adjustable-Gimbal-Downlight-
fig-3
    Universal Construction Plate CHDL-UNV-NCP (Sold Separately. Scan QR Code for Installation Instructions)

  4. CONNECT INCOMING POWER:
    Open the Power Supply box cover and remove appropriate knock-outs to install fittings (1/2” trade size) with power leads. Connect Power Supply Box to the 120V power source using flexible conduit or Romex (by others) through the mounting hole. Using wire connectors, connect incoming leads to power supply input leads. Ground to the Green wire, Neutral to the White wire, and Hot Line to the Black wire of the box (Fig. 4).

MOUNT JUNCTION BOX AND PLATE INSTALL

  1. REMODEL INSTALLATION:
    Proceed to feed the junction box up into the hole, leaving the quick-connect cord hanging out of the trim hole for easy access. Go to Step 6 next.

  2. NEW CONSTRUCTION & PLATE INSTALLATION:
    Mount the power supply box to New Construction Plate before installing the plate. Position the plate at bottom of the studs, where the downlight hole in the ceiling will be. Nail plate to studs and install drywall. Locate the hole in a plate with a stud finder and cut out the hole to match the plate. Pull the quick-connect cord out of the trim hole for easy access.

  3. CONNECT FIXTURE TRIM:
    Connect the quick connector by inserting and twisting the male/female connectors until tight (Fig. 5).

  4. MOUNTING TRIM:
    Depress torsion mounting springs, and push Mini Task trim up into the hole, letting the springs snap into place (Fig. 6). Assure that trim is held firmly For the adjustable aiming version: rotate the fixture head in order to take advantage of the adjustable beam direction (Fig. 7).GM-Lighting-MTR1-5CCT-X
-Mini-Task-Fixed-and-Adjustable-Gimbal-Downlight-fig-6

©2022 GM Lighting
Specifications are subject to change without notice.

18700 Ridgeland Ave.Tinley Park, IL 60477
Toll-Free: 866-671-0811
FAX: 708-478-2640
www.gmlighting.net.
[email protected].

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

GM Lighting User Manuals

Related Manuals