SLOAN SU-7409 Top Spud Urinal Instruction Manual
- June 9, 2024
- SLOAN
Table of Contents
SLOAN SU-7409 Top Spud Urinal
INSTALLATION INSTRUCTIONS
WARNING: Any vitreous china can chip or break if the bolts or nuts are over-tightened or if mishandled. Personal injury can occur if product is mishandled.
BEFORE YOU START…
- Observe all local plumbing and building codes.
- Check for any damage to the new urinal before installation.
- Make sure the wall is strong enough to support the new urinal prior to installation. Reinforce or install a urinal carrier if necessary
WHAT YOU WILL NEED…
- Electric Drill (heavy duty 1/2” VSR hammer drill preferred if mounting to concrete wall)
- High Speed or carbide tipped masonry bits if mounting to concrete wall
- Putty knife or sharp scraper
- Screwdrivers (phillips and flat head)
- Safety glasses
- Measuring tape and marker
- Level (24” minimum preferred)
- Caulking gun and caulk
- Channel lock pliers, adjustable wrench, and utility knife
- Manual or electric drain cleaner
- Additional materials and tools may be required for rough-in and reinforcing
NOTE: Plumbing System Requirements
√ Minimum Flowing Pressure: 25 PSI
WARNING: Hazardous gases can escape through the waste pipe if new urinal is not installed quickly. A temporary fix: place a rag in the waste pipe hole.
NEW INSTALLATIONS
- Remove the temporary rag (if used) from the waste pipe hole.
- Apply thread sealant to waste pipe threads and install new outlet flange on pipe.
INSTALL NEW WALL HANGER BRACKET (INCLUDED)
Note: Standard (and ADA) height dimensions provided for your reference
*ADA requires a lip height of 17” or lower. To allow for variances and assure compliance Sloan recommends roughing the drain line to achieve a 16-½ ” lip height.
- Wall must be properly reinforced to support urinal.
- Determine position for new wall hanger bracket and mark hole locations.
Reinforced wall framing/ urinal carrier
- Drill holes in wall (use wall anchors if needed).
- Mount and level wall hanger bracket using mounting screws and washers (included).
INSTALL NEW URINAL
- Install urinal on wall hanger bracket and secure bottom of urinal with bolts
CAUTION! Do not overtighten the bolts. Breakage and chipping of vitreous
china can occur.
Note: Check if urinal is level. If not, adjust bracket.
Hand tighten hex acorn nut into one end of each bolt before carefully securing
and tightening them
COMPLETING THE INSTALLATION
- Install flush valve to manufacturer’s installation instructions.
- Turn on water supply valve.
- Flush urinal a few times and check all connections for water seepage.
- Caulk urinal perimeter where urinal meets the wall surface to provide a suitable hygienic seal.
- Drop in Urinal Fragrance pad (included).
- Recheck for leaks for a few days.
- Record model number for reference and fill out and send in warranty card.
CARE AND CLEANING OF VITREOUS CHINA
Clean urinals with a cleaner safe for vitreous china such as Sloan’s Waterfree Urinal Cleaner/Deodorizer. Spray and wipe clean using soft cloth. Soft abrasive cleaners may be used to remove stains.
LIMITED WARRANTY
Sloan Valve Company warrants its vitreous china products to be made of first class materials, free from defects of material or workmanship under normal use and to perform the service for which they are intended in a thoroughly reliable and efficient manner when properly installed and serviced, for a period of three years from date of purchase. During this period, Sloan Valve Company will, at its option, repair or replace any part or parts which prove to be thus defective if returned to Sloan Valve Company, at customer’s cost, and this shall be the sole remedy available under this warranty. No claims will be allowed for labor, transportation or other incidental costs. This warranty extends only to persons or organizations who purchase Sloan Valve Company’s products directly from Sloan Valve Company for purpose of resale.
THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF. IN NO EVENT IS SLOAN VALVE COMPANY RESPONSIBLE FOR ANY CONSEQUENTIAL DAMAGES OF ANY MEASURE WHATSOEVER.
NOTE: IN NO EVENT SHALL THE SLOAN VALVE COMPANY BE LIABLE FOR INCIDENTAL DAMAGES, RESULTING FROM IMPROPER INSTALLATION, OR FOR DAMAGES CAUSED BY NEGLECT, ABUSE OR ALTERATION.
The information contained in this document is subject to change without notice.
Customer Support
SLOAN VALVE COMPANY
10500 Seymour Avenue
Franklin Park, IL 60131
Phone: 1-800-9-VALVE-9 (982-5839) or
1-847-671-4300
Fax: 1-800-447-8329 or
1-847-671-4380
sloan.com
Copyright © 2018 Sloan Valve Company
Rev. 1 (05/18)
Code No. 0816160
Documents / Resources
|
SLOAN SU-7409 Top Spud
Urinal
[pdf] Instruction Manual
SU-7409 Top Spud Urinal, SU-7409, SU-7409 Spud Urinal, Top Spud Urinal, Spud
Urinal, Urinal
---|---
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>