VENETA 65101-11521-A Smartfit Day and Night Honeycomb Blind Installation Guide

June 9, 2024
Veneta

VENETA-65101-11520-A-Smartfit-Day-and-Night-Honeycomb-Blind-
logo

VENETA 65101-11521-A Smartfit Day and Night Honeycomb Blind

VENETA-65101-11520-A-Smartfit-Day-and-Night-Honeycomb-Blind-product-
image

How to install your
SmartTag Day & Night Honeycomb Blind (45mm Cell)

65101-11521-A

Required Tools

VENETA-65101-11520-A-Smartfit-Day-and-Night-Honeycomb-
Blind-01

Included Hardware

The hardware can be found in the end of every box.

Installation Brackets

Installing inside the window frame…
  • At top and bottom of window frame measure at least 12mm in from each end and 14mm back from front of window frame and mark where the screws will go.
  • We recommend drilling pilot holes for the screws using a 2mm bit.
  • Fix the Shoe Bases into position using 1 long screw for each Shoe ensuring the outer edge is to the outside of the window.

VENETA-65101-11520-A-Smartfit-Day-and-Night-Honeycomb-
Blind-05

Installing outside the window frame…
  • We recommend using a spirit level for vertical and horizontal alignment.
  • Place the blind in position and mark the top corners of the blind.
  • Measure 4mm down and 5mm in from the top left and top right of where the blind will sit, and mark the location of the L bracket outer screws (ensure screws are at least 16mm from window opening).
  • The measurement from this screw to the screw on the bottom brackets is the ‘order height’ minus 8mm (order height can be found on the outside of your box). And mark with a pencil.
  • Place L brackets in position and mark where the other screws will go.
  • We recommend drilling pilot holes for the screws using a 2mm bit.
  • Fix the L brackets into position using 2 long screws for each bracket.
  • Fix the Shoe Bases onto the L Brackets using 1 short bolt for each shoe, ensuring the outer edge is to the outside of the window.

Install Magnet Catches (if supplied)

  • On the top of the blind (top rail) note the measurements from the left of blind to each magnet.
    Installing inside the window frame…

  • At the top of the window frame measure from the left of Shoe Base and mark the same measurements on window frame.

  • Place magnet catch in position and mark the screw hole with a pencil, keep the screw hole minimum 23mm from the edge of the window frame.

  • We recommend drilling pilot holes for the screws using a 2mm bit.

  • Fix the magnet catches into position using 1 short screw per catch.

  • At the top of the architrave (or where blind will be positioned) measure from the left of Shoe Base and mark the same measurements on the architrave.

  • Position the L Bracket to line up with the magnets at the top of the blind and mark the screw holes with a pencil.

  • We recommend drilling pilot holes for the screws using a 2mm bit.

  • Fix the L Brackets into position using 2 long screws per bracket.

Attach Handle

  • Attach the handle to the handle support pre-attached on the rail then slide against the handle support to the left until the handle can’t move anymore.VENETA-65101-11520-A-Smartfit-Day-and-Night-Honeycomb-Blind-07

Install Blind

  • When installing the Shoe Slider, it is suggested to secure the bottom shoe slider first, and then unfasten the top cord to secure the top shoe slider. Please do NOT untie the top cord until the bottom shoe slider is secured.
  • Please note all blind cords are interconnected.
  • Ensure the cords are not crossed or tangled.
  • Place Shoe Sliders into centre of Shoe Bases and slide towards the outer edge of Shoe as per diagram below.VENETA-65101-11520-A-Smartfit-Day-and-Night-Honeycomb-Blind-08
Operating your Blind
  • Lower and raise the blind using the handles on the top, middle and bottom rails.
  • Note the blind will close firmly at the top utilizing the inbuilt magnets.

Maintaining your Blind

Dusting

  • Dust can be removed using a feather duster or vacuum with brush attachment on low suction.
Feedback?

We would love to know how you went with your installation…

Please write a review on our website at…
www.venetablinds.com.au

Need HELP?
Call our
Customer Service team for assistance
1300 836 382

Spot Cleaning

  • Use a warm damp cloth or a mild detergent for tougher stains.
  • Dab the affected area, but do not rub the fabric. Finish with just a warm damp cloth.
  • Allow the fabric to dry in the lowered position.

Ultrasonic

  • If ultrasonically cleaning the blind please specify that a mild solution must be used.
  • Note the rails should never be immersed in liquid.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals