AIRTECHNIC EU-Box Series Air Handling Units User Manual
- September 27, 2024
- AIRTECHNIC
Table of Contents
EU-Box Series Air Handling Units
“`html
Specifications:
-
Model: EU-Box Air Handling Units
-
Air Volume Range: 500 m3/h – 100,000 m3/h
-
Construction: Modular
-
Usage: Heating, cooling, filtering, mixing air, heat
recovery -
Medium Density: Up to 1.3 kg/m3
-
Maximum Humidity: 95%
-
Temperature Range: -30°C to 40°C
Product Usage Instructions:
Safety:
Before unpacking, installing, or performing any work on the
unit, carefully read and follow the operating instructions provided
in the manual. Always pay attention to safety advice and
warnings.
Assembly and Operation:
-
Ensure the AHUs are securely mounted and fitted with protection
guards suitable for the application before use. -
Use only as per design parameters and performance
specifications indicated on the data plate. -
Installation, electrical, and mechanical maintenance should be
done by qualified personnel.
Storage and Transport:
Store components in a dry, weather-protected place in their
original packaging. Cover open pallets with tarpaulin to protect
against dirt and maintain storage temperatures between -30°C and
40°C. Check bearings if stored for over a year before mounting.
Maintenance:
Regular maintenance is essential for optimal performance. Refer
to the maintenance section in the manual for detailed instructions
on servicing the AHUs.
FAQ:
Q: Can the AHUs handle aggressive gases and fumes?
A: The AHUs can handle slightly aggressive gases and fumes, but
it is recommended to consult with engineers for specific
applications.
Q: What should be done before mounting components stored for
over a year?
A: Before mounting components stored for more than one year,
check the bearings by turning them by hand to ensure they are in
good condition for operation.
“`
EU BOX
AIR HANDLING UNITS
1
V. 4
. ‘ ,
. This operating instruction contains important technical advice and
information about safety. Therefore
please pay attention to the operating instructions before unpacking,
installing or any other work is
undertaken on this unit.
CONTENTS
3
Safety
4
Description
4
Conditions of use
–
5
Storage – Transport
–
6
Assembling – Operation
15
Maintenance
2
AIR HANDLING UNITS
- :
EN
1. SAFETY
Industrial security symbols The following symbols refer to particular dangers
or give advice for safe operation :
! !
CAUTION! DANGER! SAFETY ADVICE
!
DANGER FROM ELECTRIC CURRENT OR HIGH VOLTAGE!
!
CRUSH DANGER!
! !
DANGER! DO NOT STEP UNDER HANGING LOAD!
! !
CAUTION! HOT SURFACE!
, !
IMPORTANT, INFORMATION!
3
EN
AIRTECHNIC , , . , , .
KM, !
KM . . , ! KM , ( ) ‘ .
2.
KM EU-Box, . , , , , , . , 500 m3/h 100.000 m3/h .
Safety advice
AIRTECHNIC Air Handling Units are produced in accordance with the latest
technical standards and our quality assurance program which includes material
and function tests ensure the final product is of high quality and durability.
Nevertheless these fans can be dangerous if they are not used and installed
correctly, according to our instructions.
Before installing and operating AHUs please, read the instructions carefully!
Only use fan and other components in modular AHUs after they have been
securely mounted and fitted with protection guards to suit the application.
Guards can be supplied for all fans in our program.
Installation, electrical and mechanical maintenance and service should only be
undertaken by qualified personnel!
The modular AHUs must be used only according to its design parameters, taking
into account its performance (data plate) and mediums passing through it!
2. DESCRIPTION
The EU-Box series AHUs are of modular construction and can be offered in any
desired combination. The AHUs are used for heating, cooling, filtering and
mixing air and also for heat recovery. With numerous unit sizes we are able to
produce air volumes from 500 m3/h to 100.000 m3/h in standard series and also
larger volumes in special conditions.
- : ( ) 1,3 kg/m3 95%.
3. CONDITIONS OF USE
Centrifugal fans can be used for ventilation of :
clean air slightly dusty and greasy air slightly aggressive gases and fumes
(please refer to our engineers) mediums up to a density of 1,3 kg/m3 mediums
up to a max humidity of 95%.
4
AIR HANDLING UNITS
4. ,
H KM ( ) : K (, , ..). -30 C 40 C. 1 ( ). KM. , KM ( 1). , .. . , .
EN
4. STORAGE, TRANSPORT
Store components in a dry place and weather protected in its original packing
(if available) :
Cover open pallets with tarpaulin and protect the fans against dirt (i.e.
stones, splinters, wires, etc). Storage temperatures between -30 C and 40 C.
For storage duration of more than one year please check bearings on soft
running before mounting (turn by hand).
Forklifts and cranes can be used to transport modules. When employing a crane,
straps must be fastened on the modules of the AHU (drawing 1). Use suitable
assembling means such as scaffolds, in order to meet specifications.
Prior to lifting modules, lock all service and access doors.
! / DANGER!
! DO NOT STEP UNDER HANGING LOAD!
Straps from sturdy material
( ) Stanchion (wood or metal) Support
5
Unit module
Base frame
1 / Drawing 1
5. –
EN
5. ASSEMBLING – OPERATION
, , .
Installation and electrical connections must only be done by qualified and authorized personnel, in accordance with applicable regulations and the instructions of the manufacturer, designer or project’s engineer.
( ).
.K.M. , / . , , .
.K.M , : M , . T . T . A .
. .K.M. .
( ) ( 2).
Before installing remove transport conerpieces (when available).
A.H.U. should be assembled on a rigid, flat surface and/ or other support
structures.
The design and philosophy of the foundation should satisfy the acoustic
requirements and drain the water coming from the drip eliminator and the
humidifier, taking into account the height of the siphon, according the
subpressure of the fan at its installation point.
When installing A.H.U. on noise reducing base between unit and foundation,
apply the following procedure:
Using a marker, make a sketch outlining the complete unit on the foundation.
Place rubber strips on the foundation according the outline. Place the
assembled units onto the strips.
Vibration absorbers between the unit and the base are not required because
there are internal ones.
The flexible connection between the duct and the unit must be loose when
installed. Its length, after its placement and connection with the AHU and the
airduct, should be less than its original maximum length in the stretched and
disassembled state.
Unit modules must be assembled and placed before connecting them with the
supplied connecting (or sealing) material (drawing 2).
6
AIR HANDLING UNITS
EN
45 mm / 45 mm Profile
, . .
Gasket and external connection are placed, where it’s required. Optional placement of silicone sealant.
2 / Drawing 2
, / .
For the connection of the individual modules
and depending on the type and size of the unit, external and / or internal
connections points are used.
, , , . .
The hinges of the inspection doors must be adjusted properly using the screws, as shown in the pictures below, in order for the door to fit properly and securely in the opening and there is no air leakage. Additional adjustment of the hinges may be required after moving the unit and during the first start- up.
7
EN
, . .
When the adjustment of the hinges is completed and the door closes properly, we adjust the locks so that the door locks tightly and there is no air leakage. Additional adjustment of the locks may be required after moving the unit and during the first start-up.
, 2 . .
Use a long clamp, to bring the 2 sections closer. Install all necessary connecting elements before removing the clamp.
X
Use wood to protect the frame surface
PROPER INSTALLATION OF WEDGES
/ CAUTION / Use gentle force
Nylon face hammer Wood
PROPER REMOVAL OF WEDGES
/ CAUTION / Use gentle force
Nylon face hammer
8
AIR HANDLING UNITS
EN
E REMOVING SEQUENCE OF THE WEDGES
3
M 3
1
,
, .
2
After you remove wedge No 3
push the panel from its
inner side outwards
4
ALWAYS FOLLOW ALL SAFETY RULES
.. , , , .., . . , , .
, . , , .
All connections concerning electrical parts of the unit e.g. the motor for the
fans, the pumps, the electric heating elements, the actuators, etc., must be
in accordance with the manufacturer’s instructions and local regulations. The
electric heating elements should also have a safety switch. This switch should
be inspected after initial installation to ensure proper operation and then at
long intervals.
During maintenance work on the unit, the electric heating coils should be
freed from any foreign substance and cleaned whenever necessary. Also, for
ground wires that may be present and are placed in flexible connections of the
fan and ducts, it should be checked whether the installation has been done
correctly and whether it is necessary to tighten them.
.
Do not use metal conduit gland with plastic connector box.
9
EN
: : , . . . , .
. +10% , , .
VENTILATOR SECTION
Electrical connections : They are made in accordance with : Technical
connection regulations, local ordinances and international electrical codes.
The power supply must be compatible with the data indicated on its technical
characteristics plate.
The motor wiring must be done according to the electrical diagram in the
junction box.
Electrical cables inside the unit should be firmly secured against mechanical
impact or fan suction and be of sufficient length so that periodic belt and
pulley tension adjustments are not impeded.
The motor should be protected from overloading through a protection switch.
The thermal relays in the unit should be set with +10% of measured current,
but not exceeding the rated current of the motor.
: . . () . .
Prior to inspecting direction of rotation : Remove any foreign matter from
fan.
Check impeller rotation by hand for smooth running. Install protection guards
(accessories) or prevent easy access to fan. Start the unit for a short time
to check the direction of rotation based on the direction arrow on the fan
casing.
.
The motor can be overloaded when the fan rotates in the wrong direction.
10
AIR HANDLING UNITS
EN
A.C. H .
. , , 1 () 2 (). ( )
: M . H . A , . ; (. ); () , .
.
A , .. , ( )! H !
. ( , , , ).
Threephase A.C. motor. The direction of rotation can be reversed by changing
the two phases.
Singlephase motor. Change direction of rotation if necessary by changing Z1
(black) and Z2 (orange) (change of current direction in secondary winding)
Preparing the fan for initial operation : Mechanical installation as
specified. Electrical installation in accordance with current regulations.
Remove foreign substances from the air inlet and outlet area, as well as from
the inside of the fan.
Has the safe transport protection been removed from the ventilator frame? Is
the tension on the belt and pulleys sufficient? (see maintenance)? Protection
guards (accessories) are installed, there is no easy access to the fan, or the
fan is installed out of reach.
Only commence operation when it is installed in accordance with applicable
ordinances If the fan is started under free blow conditions, i.e. prior to
connecting to ducting system, the current consumption may exceed the normal
maximum (forbidden area of performance curve)!
The thermal protection of the motor may be activated!
Fan in operation. Observe correct function (smoothness of running, vibration,
unbalance, current consumption in all three phases, and possible
controllability).
( ) , , !
With regular checks of the fan inlet, make sure that no dirt has accumulated on the bumper (if any) and, if necessary, clean it!
. 90 .
AIR DAMPERS
All screw fitting and connections must be checked for sufficient tightness.
When utilizing an actuator, adjust the linkage so that a 90 swing angle is
guaranteed and the shutters reach end position when closed.
11
EN
: ; , . . 90 ( ;). ( ); ;
. .
& -, . . ( ).
( ) ! , ( ), 4.
( ) ! , ( ), 5. , . .
AIRING UNIT
WATER OULET
AIR DIRECTION
WATER INLET
4 / Drawing 4
Prepare Air Dampers for initial operation :
Mechanical components accordingly assembled? In case several dampers are
connected, the linkage must be checked. All screw fittings and connections are
to be checked for sufficient tightness.
Swing angle of 90 guaranteed (do dampers reach end position when closed)?
Actuators properly connected (Manufacturers instructions)? Level and gears are
free from interference
BAG FILTERS The filter elements to be fastened in frames using tension clamps.
Check for air tight placing of filter in filter frame.
PANEL & NORM FILTERS The Z-Line filters are inserted into filter frame. Check
for air tight placing of filer in the casing. Filter element must not be
damaged (filter will be unstable).
HEATING COIL (with warm water) Caution! When connecting water pipes, properly
connect water inlet and water outlet (in general reverse direction flow with
water inlet located at air exit side) as in drawing 4.
COOLING COIL (with cold water) Caution! When connecting water pipes, properly
connect water inlet and water outlet (in general reverse direction flow with
water inlet located at air exit side), as in drawing 5.
According to acoustic demands, pipes are to be connected with or without
elastic compensatory. Pipe connections above the Air Handing Unit must include
a flange, allowing easy access to the coils during maintenance and paper
AIRING UNIT
WATER INLET
WATER OULET
AIR DIRECTION
5 / Drawing 5
12
AIR HANDLING UNITS
EN
/ .
ENERGY RECOVERING SYSTEM
The most frequent energy regain system is that of plane plated air / air
exchangers.
& FIGURE OF THE CONDENSATES & SMELLS SIPHON
X : . (Bigger or equal to the negative pressure of coil section)
Y : /2. (Bigger or equal to X/2)
! … .
, , . , , , . , .
CAUTION! When tightening the pipes on the A.H.U’s coils and condensates, a
second spanner must be used to hold the locknut.
If condensate, drain and overflow pipes exist, make sure externally located
connections are connected to a siphon. The height of a siphon for low and
excess pressure, must be appropriate for the Air Handing Unit, according to
subpressure of the fan at this point, to prevent unwanted and unhealthy air
from entering or exiting connected pipes. When connecting coils with screw
thread on the pipes, all components must be properly supported to prevent
damages.
13
/ WRONG
EN
/ CAUTION
/ CORRECT
STABLE
– ..M. : , , . . , (). , . .
: . . , (). , , ( ), . . , : +5 C.
Heating coil (PWW) preparation for initial operation :
Appropriate installation of all mechanical components and connecting pipes.
Heating Coil during filling with water thoroughly deaerated. When necessary
re-tighten connections (Installation).
For long periods of down time and especially during freezing conditions, the
heating coil and connections should be emptied. Use compressed air to push out
residual water and remove all drain plugs.
Cooling coil (PKW) preparation for initial operation :
Appropriate installation of all mechanical components and connecting pipes?
Cooling Coil during filling with water thoroughly deaerated. When necessary
re-tighten connections (Installation).
For long periods of down time and especially during winter (freezing
conditions), the freezing piping and connections should be emptied. Use
compressed air to push out residual water and remove all drain plugs.
If you don’ t want to do this, you must make provision for anti-freezing
protection: closing of tampers or circulators’ operation at +5 C.
14
AIR HANDLING UNITS
- , .
EN
6. MAINTENANCE
Installation, service and electric work to be performed only by skilled and
qualified personnel and in accordance to applicable regulations and
manufacturers instructions.
AIRTECHNIC. , ( ).
Use only original spare parts manufactured and supplied by AIRTECHNIC. Use only commercial cleaning material paying attention to the prescribed safety measures and do not use any abrasive tools (surface protection will be destroyed).
: . ! ! . .
Before any maintenance work is undertaken please :
Stop fan in accordance to regulations and disconnect all poles from mains
supply.
Wait until impeller is stationary! Make sure that a restart is not possible!
Prevent water from entering heat exchangers. Allow heat exchangers to cool
down.
: ( ). . . .
: . 0,5 4 24 . . 6. : 1. . 2. . 3. . .
, !
Cleaning ventilator module : Clean inlet opening Clean impeller (when
necessary remove protection guard). Do not flood motor Do not bend impeller
blades Install protection guard.
Inspecting belts and pulleys : The belts and pulleys should be observed
regularly during initial operation. After 0,5 to 4 hours of full load
operation and afterwards 24 operating hours the belts and pulleys should be
checked if retensioning is necessary.
Remove belt protection. Check belts according to drawing 6. If necessary
retension belts : 1. Loosen locking screw located on side of motor rail.
2. Tense belts by adjusting tensioning bolt as needed.
3. Fasten locking screw on motor rail. Install belt protection.
When replacing fan belts becomes necessary, loosen belt drive!
15
EN
() . () . (C). . (D) . (Ea).
. . 10 .
; ; ( ); ; ;
( 3 ) : . , . . (). . . : ( ). .
6 / Drawing 6
Measuring device with tension hook (A) placed in the middle of fan belt. Put
drag indicator (B) in position. Raise profile dependent tested tension
according to scale (C). Pull measuring device with right angled direction
downwards. On scale (D) of drag indicator read depth of impression. If
necessary adjust initial tension to preset depth impression (Ea).
Improper belt tension cannot guarantee flawless operation and will lead to
premature failure of the belts. To much tension will damage ball bearings.
When tensioning the belt, make sure belt deviation does not exceed 10 of side
flush point.
General Inspection Bearing clearance too large? Bearing lubricant leaking?
Surface affected (corrosive medium)? Unusual noises? Is fan performance for
eventual canal system expansion sufficient?
AIR DAMPERS Periodically (every 3 months) check for: Performance. Dirt, soil
or other foreign matter. Damages. Corrosion. Parts are firmly mounted. Moving
components move smoothly and easy. As Necessary: Lubricate Bearings (Plastic
Bearings do not require lubricating). Clean.
16
AIR HANDLING UNITS
EN
, , . : . . . . . -: . . . . . .
K FILTER CLASS
G3 – G4 – M5
F6
F7 – F8 – F9
FILTERS Filters are not reusable and should be replaced once the bellow listed
pressure loss is reached.
Replacing Bag filters: Open service Access. Loosen Tension Clamps. Extract Bag
Filter. Insert new Bag Filter. Tighten Tension Clamp. Close Service Access.
Replacing filters and Z-Line Filters : Open service Access. Loosen Tension
Clamps. Extract Filter. Insert new Filter. Tighten Tension Clamp. Close
Service Access.
RECOMMENDED END PRESSURE DIFFERENCE
80 ÷ 100
120 ÷ 150
150 ÷ 200
, .
For better control of the filters, installation of an optional differential manometer with acoustic or illuminated sign is recommended in the filter unit.
( 3 ) : . , . . (). . : (.. ).
WATER SPRAY HUMIDIFIER
Periodically (every 3 months) check for:
Performance. Dirt, soil or other foreign matter. Damages. Salts. Parts are
firmly mounted. As Necessary:
Clean (e.x.with vinegar).
17
EN
T ( )
HEAT EXCHANGER SECTION (with warm or cold water)
FUNCTION
, . Check Cooling and Heating Coils for dama-ges corrosion and dirt
accumulation.
. Check Forward and Reverse water flow functions.
. Deaerated.
. Clean Airflow side.
: . Extra for Cooling Coils: check water outlet for air traps.
: , . Extra for Cooling Coils: Check drop eliminator for damages, corrosion
and dirt accumulation.
E / PERFORM
PERIODIC
AS NEEDED
X
X X X
X
X
() . , . ()!
‘ . AIRTECHNIC ROA-LW.
Badly soiled heat exchangers will be limited in their function and must be
cleaned immediately. To clean the fins, use a vacuum, compressed air or a soft
brush. Never use hard or sharp object to clean heat exchangers!
Drop eliminators which are soiled will lead to condensation passing through.
To clean drop eliminator fins AIRTECHNIC recommends ROGALW.
AIRTECHNIC
.
AIRTECHNIC products are subject to steady quality controls and are in accordance with valid regulation.
18
AIR HANDLING UNITS 19
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>