REZNOR VZ Gas Fired Low Intensity Radiant Tube Heaters Installation Guide

September 11, 2024
Reznor

REZNOR VZ Gas-Fired Low-Intensity Radiant Tube Heaters

GENERAL INFORMATION

DANGER
These kits are to be installed by a qualified service agency by these instructions and compliance with all codes and requirements of authorities having jurisdiction. Improper installation, adjustment, alteration, service, and maintenance can cause property damage, injury, or death. The qualified agency performing this work assumes responsibility for this installation.
NOTE: For heater suspension, turnbuckles with a hanger kit are recommended for convenience when leveling the system. Refer to these instructions along with the installation manual provided with the heater for complete heater suspension instructions. Refer to the installation manual provided with the unit for important safety information.

KIT COMPONENTS

When installing the hanger kit and/or turnbuckle kit, ensure that all components listed in Table 1 are available before beginning installation.
NOTE: Hanger kits include eleven (11) S-hooks and 50 feet of chain. Turnbuckle kits include two (2) turnbuckles and two (2) hex nuts. Refer to Table 2 for the minimum number of kits needed (may vary depending on the length of the suspension hardware).

DO NOT DESTROY. PLEASE READ CAREFULLY. KEEP IN A SAFE PLACE FOR FUTURE REFERENCE.

INSTALLATION

DANGER
The installer is responsible for installing the field-supplied structure suspension point hardware and for adequately supporting the weight of the heater.

WARNING
The heaters are designed so that the tube suspension points can be adjusted slightly to adapt to the structure. Each straight tube must have at least one suspension point. Straight tubes downstream and adjacent to an L-tube or U-tube require two suspension points.

CAUTION
A minimum of 12 inches (305 mm)—the total length of chain, S-hook, and/or turnbuckle—is required between the tubes and the structure suspension points.

  1. Suspend the heater by the installation manual provided with the heater using S-hooks, chains, and turnbuckles (as necessary) at all suspension points.
  2. To install turnbuckles:
    • Remove the right-hand thread eyebolt from the turnbuckle (see Figure 1) and install a hex nut on the eyebolt with the nut’s teeth away from the eye.

CAUTION
DO NOT tighten (lock) the hex nuts against the turnbuckles until the system is leveled. Locking the hex nuts against the turnbuckles is required to prevent the turnbuckles from turning when the system expands.

  • Thread eyebolt back into turnbuckle. DO NOT tighten (lock) the hex nut against the turnbuckle at this point.
  • Level the heater and THEN tighten (lock) the hex nut against each turnbuckle.

Specifications and illustrations are subject to change without notice or incurring obligations.
The latest version of this manual is available at www.reznorhvac.com.

2024 Nortek Global HVAC LLC, O’Fallon, MO. All rights reserved.
VZ-VZH-VZT-CK53,54,55,56 (08-24) 1047420-A

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals