SUNGROW SG2.0RS-S G3 5kW Single Phase Inverter Installation Guide

September 5, 2024
SUNGROW

SUNGROW SG2.0RS-S G3 5kW Single Phase Inverter

Specifications

  • Models: SG2.0RS-S, SG2.5RS-S, SG3.0RS-S, SG3.0RS, SG3.6RS, SG4.0RS, SG5.0RS, SG6.0RS
  • Website:http://support.sungrowpower.com/
  • Model Number: SG2.0-6.0RS-QIMUL-Ver18-202312
  • Compliance: RCM, RoHS, CE, UKCA, EU Declaration of Conformity
  • Standards: Low Voltage Directive 2014/35/EU, Electromagnetic compatibility 2014/30/EU, RoHS 2011/65/EU and 2015/863/EU

Product Usage Instructions

Safety Instructions

It is crucial to follow all safety instructions provided with the inverter to prevent injury, damage, or death. Make sure to read and understand all safety guidelines before proceeding with installation or maintenance.

Installation

  1. Ensure that the package contents are intact before installation.
  2. Only qualified personnel with proper training should perform the installation.
  3. Check the website or scan the QR code for the user manual before starting the installation process.
  4. Use intact and well-insulated cables during installation.

Operation

Always disconnect the inverter from external power sources before performing any maintenance. Qualified personnel should handle any service or maintenance tasks to avoid risks associated with high voltage.

Connection

Ensure all electrical connections comply with local and national standards. Obtain permission from the utility grid before connecting the inverter.

Frequently Asked Questions

Q: Can I dispose of the inverter with household waste?

A: No, do not dispose of the inverter with household waste.
Follow proper disposal guidelines to ensure environmental safety.

Q: What should I do if any components are damaged or missing during installation?

A: Contact SUNGROW or the distributor immediately if you encounter any damaged or missing components before proceeding with the installation.

INTRODUCTION

  1. Contents may be periodically updated or revised due to product development. The information in this guide is subject to change without notice. In no case shall this guide substitute for the user manual or related notes on the device.
  2. Make sure to read over, fully understand, and strictly follow the detailed instructions of the user manual and other related regulations before installing the equipment.
    • The user manual can be downloaded by visiting the website at http://support.sungrowpower.com/; or it can be obtained by scanning the QR code on the side of the equipment or the back cover of this guide.
  3. All installations must be performed by qualified personnel who should have training for the installation and commissioning of electrical systems, as well as dealing with hazards, and know the manual and the local regulations and directives.
  4. Before installation, check that the package contents are intact and complete compared to the packing list. Contact SUNGROW or the distributor in case of any damaged or missing components.
  5. The cable used must be intact and well-insulated. Operation personnel must wear proper personal protective equipment (PPE) all the time.
  6. Any violation could result in personal death injury or device damage and will void the warranty.

Safety

The inverter has been designed and tested strictly according to international safety regulations. Read all safety instructions carefully prior to any work and observe them at all times when working on or with the inverter.

Incorrect operation or work may cause:

  • injury or death to the operator or a third party; or
  • damage to the inverter and other properties.
  • Please follow the safety instructions related to the PV strings and the utility grid.

DANGER

  • Lethal voltage!
  • PV strings will produce electrical power when exposed to sunlight and can cause a lethal voltage and an electric shock.
  • Only qualified personnel can perform the wiring of the PV panels.

NOTICE

  • Danger to life from electric shock due to lethal voltage!
  • All electrical connections must be in accordance with local and national standards.
  • Only with the permission of the utility grid, the inverter can be connected to the utility grid.

Inverter

The icons on the inverter body are as follows.

EU Declaration of Conformity

within the scope of the EU directives

  • Low Voltage Directive 2014/35/EU (LVD)
  • Electromagnetic compatibility 2014/30/EU(EMC)
  • Restriction of the use of certain hazardous substances 2011/65/EU and 2015/863/EU (RoHS)
  • SUNGROW confirms herewith that the products described in this document comply with the fundamental requirements and other relevant provisions of the abovementioned directives.
  • The entire EU Declaration of Conformity can be found at support.sungrowpower.com.
  • The communication module that comes with the inverter and the technical parameters of wireless communication are listed in the table below.
  • The model of the communication module delivered shall prevail. The EU Declaration of Conformity for the communication module can be found at support.sungrowpower.com.

WiNet-S

  • Radio technology WLAN 802.11b/g/n20/n40
    Radio spectrum: 802.11b/g/n20 2412 MHz ~ 2472 MHz

    • 802.11n40 2422 MHz ~ 2462 MHz
  • Maximum transmission power ≤ 20 dBm

  • Technical parameters listed above apply to EU countries only.

DANGER

  • Danger to life from electric shocks due to live voltage
  • Do not open the enclosure at any time. Unauthorized opening will void warranty and warranty claims and in most cases terminate the operating license.
  • When the enclosure lid is removed, live components can be touched which can result in death or serious injury due to electric shock.
  • Lethal danger from electric shock due to possibly damaged inverter
  • Only operate the inverter when it is technically faultless and in a safe state.
  • Operating a damaged inverter can lead to hazardous situations that can result in death or serious injuries due to electric shock.
  • WARNING Risk of inverter damage or personal injury
  • Do not connect or disconnect the PV and AC connectors when the inverter is running.
  • Wait at least 10 minutes for the internal capacitors to discharge after all electric devices are removed and the inverter is powered off.
  • Ensure that there is no voltage or current before connecting or disconnecting the PV and AC connectors.
  • WARNING All the warning labels and nameplates on the inverter body.
  • must be clearly visible; and
  • must not be removed, covered, or pasted.
  • CAUTION Risk of burns due to hot components!
  • Do not touch any hot parts (such as the heat sinks) during operation. Only the DC switch and the LCD panel can safely be touched at any time.
  • NOTICE Only qualified personnel can perform the country setting. Unauthorized alteration may cause a breach of the type-certificate marking.
  • Risk of inverter damage due to electrostatic discharge (ESD)!
  • By touching the electronic components, you may damage the inverter.

For inverter handling, be sure to:

  • avoid any unnecessary touching; and
  • wear a grounding wristband before touching any connectors.

Scope of Delivery

The images shown here are for reference. The actual quantity is based on delivery.

Mounting location

Installation tools

Mounting

  • Use appropriate mounting hardware for the wall type.
  • The image shown here is for reference only. The actual product received may differ.

Optimizer

Please ensure that the optimizer is installed facing the back of the module. Otherwise, the clip may be damaged.

  • Do not forcibly bend the clips when installing the optimizer by clips. Otherwise, the clip may be damaged.
  • Do not clamp the optimizer into holes in the module frame during installation. Otherwise, the optimizer cannot be removed or the clips may be damaged.
  • It is recommended to install optimizers on the same side of modules.
  • Do not clamp and remove the optimizer multiple times. Otherwise, the clip may become loose, affecting normal use.

PE

AC

  • It is recommended to use heavy-duty conduits when running cables through Cavity walls or layout cables with corresponding conduits.
  • An RCD is not required if either of these two installation methods is adopted according to the local standard AS3000-2018. (For “AU” and “NZ”)

DC

  • It is recommended to use heavy-duty conduits when running cables through Cavity walls or layout cables with corresponding conduits.
  • An RCD is not required if either of these two installation methods is adopted according to the local standard AS3000-2018 (For “AU” and “NZ”)

Optimizer

WLAN

Ethernet

COM2

Label Description

  • RS485 (A1, B1) Reserved
  • Meter (B2, A2) Smart energy meter interface
  • DRM (R, C) For external Demand Response Enabling Device (“AU”/”NZ”)
  • RSD (RSD-1, RSD-2) Reserved

The connection procedure for the meter and DRM are the same. Take meter connection as an example.

Power on

LED panel

  • In a normal state, the E-day and Pac information will be displayed alternately.
  • Also, you can touch the LED indicator to switch the information.
  • In the error state, touch the LED indicator to view multiple error codes.
  • If there is no operation for 5 minutes, the display screen will be off. Touch the LED indicator to activate it.
  • More information in the QR code or athttp://support.sungrowpower.com/
  • Web:www.sungrowpower.com
  • Sungrow Power Supply Co ., Ltd.

Documents / Resources

| SUNGROW SG2.0RS-S G3 5kW Single Phase Inverter [pdf] Installation Guide
SG2.0RS-S, SG2.0RS-S G3 5kW Single Phase Inverter, G3 5kW Single Phase Inverter, Single Phase Inverter, Phase Inverter, Inverter
---|---

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals