Eastbrook 36.0037 Wall Hung Drawer Vanity Units Instruction Manual

September 4, 2024
Eastbrook

36.0037 Wall Hung Drawer Vanity Units

“`html

Specifications:

  • Product: Bathroom Vanity Units
  • Installation Types: Floorstanding and Wall Hung
  • Maintenance: Regular cleaning and inspection required
  • Materials: High-quality components for durability

Product Usage Instructions:

1. Installation for Floorstanding Vanity Units:

1. Mark the two holes levelly on the wall.

2. Drill the holes using a proper size drill bit.

3. Insert expansion wall plug or appropriate alternative wall
fixing.

4. Screw in the tapping screws and add cover caps on the
screws.

5. When fitting the basin to the unit, apply adequate silicone
between basin and unit to prevent water ingress.

2. Installation for Wall Hung Vanity Units:

1. Mark the holes levelly on the wall.

2. Drill the holes using a proper size drill bit.

3. Insert expansion wall plug or appropriate alternative wall
fixing.

4. Screw in the tapping screws.

5. Apply adequate silicone between basin and unit when fitting
to prevent water ingress.

Component Adjustment:

  1. Drawer Slider Adjustment: Turn the screw
    clockwise to raise the drawer, anti-clockwise to lower it.

  2. Soft Closing Hinge Adjustment:
    – Up/Down Adjustment
    – In/Out Adjustment
    – Left/Right Adjustment

  3. Wall Hanging Bracket Adjustment: Turn the
    screw anti-clockwise to lengthen the hook’s protrusion.

Aftercare and Maintenance:

  • Ensure proper ventilation in the bathroom.
  • Avoid abrasive cleaning materials and acidic substances.
  • Regularly check hinges and sliders every 6 months.
  • Keep the vanity unit dry and wipe off any spillages
    promptly.

FAQ:

Q: Can I install the vanity unit by myself?

A: It is recommended to use qualified plumbers and have 2 people
during installation for safety and proper positioning.

Q: How often should I check the hinges and sliders?

A: It is advised to check hinges and sliders every 6 months for
any loose screws that need tightening.

“`

Bathroom Furniture Instructions and Maintenance
PLEASE READ BELOW NOTES BEFORE INSTALLING YOUR VANITY UNITS. – Use protective gloves and eye protection at all times – Please use qualified plumbers to install the vanity unit – 2 people are required to install the units – Check the parts are fully supplied – Never install products or components which looks damaged – Hinges for doors and sliders for drawers may need to be checked and adjusted to achieve
proper position after installation – Please avoid direct sunlight as this will affect the painted surface colour change – If fixing to a stud or panelled wall, proper framework is required to support a wall hung unit
NECESSARY TOOLS (not supplied)
1. Installation for Floorstanding Vanity Units

Mark the two holes levelly on the wall. Drill the holes using proper size drill bit. Insert expansion wall plug or appropiate alternative wall fixing.
Screw in the tapping screws. Add cover caps on the screws.

When fitting the basin to the unit, adequate silicone is required between basin and unit to prevent potential water ingress.

2. Installation for Wall Hung Vanity Units

23 23 25

120 7

Floor

Recommending height includes basin

Unit side

screw holes location

This part has been pre-fitted on vanity unit

This wall clip is required to be fixed onto wall

Mark the holes levelly on the wall. Drill the holes using proper size drill bit. Insert expansion wall plug or appropiate alternative wall fixing.
Screw in the tapping screws.

When fitting the basin to the unit, adequate silicone is required between basin and unit to prevent potential water ingress.

Components Adjustment
1. Drawer slider adjustment
If you need some fine adjustment, turn the screw clockwise to to get the drawer “up”, turn the screw anti-clockwise to get the drawer “down”

2. Soft closing hinge adjustment
Up/Down Adjustment In/Out Adjustment

Up/Down Adjustment

Left/Right Adjustment

3. Wall hanging bracket adjustment

Turn the screw anti-clockwise to lengthen the hook’s protrusion
Once the vanity unit is fitted, if required, turn this screw clockwise for “down” and anti-clockwise for “up”

Aftercare and Maintenance
– Make sure your bathroom is well ventilated – Do not use abrasive cleaning materials which will hurt the surface finish – Do not use any cleaning with acidic substances or soda. We suggest use cleaning agents with a PH of 7 – The vanity unit must be kept dry and not subject to continuous moisture – All spillages and splashes must be wiped off – Do not lean on fully opened doors or drawers – Check the hinges and sliders every 6 months and any loose screws must be tightened
Technical Helpline: 01452 317890 (Open times: Mon – Fri 8:00am-17:pm) Email: technical@eastbrookco.com Eastbrook Road, Gloucester GL4 3DB

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals