PORTOR LIGHTING PT-DLSB2-R Series LED Lighting Solutions Instruction Manual

August 17, 2024
PORTOR LIGHTING

PT-DLSB2-R SERIES

PT-DLSB2-R-6I-12W-5CCT / PT-DLSB2-R-4I-9W-5CCT

INSTALLATION INSTRUCTIONS

ASSEMBLY INSTRUCTIONS
  1. PREPARING FOR INSTALLATION: DISCONNECT ELECTRICAL POWER BEFORE INSTALLING OR SERVICING ANY PART OF THIS FIXTURE.
  2. LOCATE A SUITABLE POSITION TO PLATE THE FIXTURE AND OPEN IN ACCORDANCE TO THE CUT-HOLE DIMENSIONS (REFER TO HOLE CUT TABLE FOR APPROPRIATE SIZE).
  3. RUN ELECTRICAL WIRE FROM THE SWITCH (POWER SUPPLY) THROUGH THE MOUNTING HOLE-USE NMD90 ROMEX OR BX CABLE.

IMPORTANT
READ ALL INSTRUCTIONS BEFORE INSTALLING FIXTURES. RETAIN FOR FUTURE REFERENCE.

SAFETY
FOR YOUR SAFETY, THIS FIXTURE MUST BE WIRED IN ACCORDANCE TO LOCAL ELECTRICAL CODES AND ORDINANCES. ALL WORK SHOULD BE DONE BY A QUALIFIED ELECTRICIAN.

WARNING
MAKE CERTAIN POWER IS OFF FROM THE ELECTRICAL PANEL BEFORE STARTING INSTALLATION OR ATTEMPTING ANY MAINTENANCE. INDOOR INSTALLATION ONLY.

TOOLS REQUIRED

| | |
---|---|---|---
Safety goggle| Drill Saw / Saw| Measuring tape| Electrical Wiring (use type and gauge suitable for application to connect the fixtures)

INSTALLATION ( CONSULT A QUALIFIED ELECTRICIAN BEFORE INSTALLING )

DRIVER WIRING
  1. Open the hardwire box swing cover and remove the appropriate knockout (s).
  2. Insert the electrical supply cable through the knockout and secure with a cable connector (sold separately).
  3. Using wire nuts, connect green ground wire of cable to green wire on box. Connect white wire of cable to white wire of box. Connect black wire of cable to black wire of box. ( Figure 1 )
  4. Place all wiring and connections back in to the box and close the cover.
  5. Insert hardwire box through the mounting hole. ( Figure 2 )
    NEW CONSTRUCTION APPLICATIONS: Hardwire box shall be firmly secured to studs, joists, or similar fixed structural units.
    REMODEL APPLICATIONS: Do not require the hardwire box to be firmly secured after the mounting plates, studs, joists, or structural units have been concealed.
FIXTURE INSTALLATION
  1. Connect the fixture to the hardwire box by inserting and twisting the male/female connectors. Select the desired Color Temperature. ( Figure 3 )
  2. Push spring loaded clips on the fixture upwards and insert fixture base in to the mounting hole. Release the clips and fixture will be pulled flush to the ceiling. ( Figure 4 )
  3. Once assembly is complete, turn on power to confirm fixture is working properly.

HOLE CUT SIZE:
4” round and square: 4.3” (110 mm)
6” round and square: 6.3” (160 mm)

Figure 1

  1. Power supply
  2. WHITE – N
  3. BLACK – L
  4. COPPER – G
  5. Cable to fixture

Figure 2

Figure 3 Figure 4

www.portorlighting.com

Specification subject to change without notice

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

PORTOR LIGHTING User Manuals

Related Manuals