PORTOR LIGHTING PT DL31 Downlight Instruction Manual

June 1, 2024
PORTOR LIGHTING

PORTOR LIGHTING PT DL31 Downlight Instruction Manual

ASSEMBLY INSTRUCTIONS

  1. PREPARING FOR INSTALLATION: DISCONNECT ELECTRICAL POWER BEFORE INSTALLING OR SERVICING ANY PART OF THIS FIXTURE.
  2.  THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES. OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING THAT MAY CAUSE UNDESIRED OPERATION.

PACKAGE CONTENTS

INSTALLATION ( CONSULT A QUALIFIED ELECTRICIAN BEFORE INSTALLING )

SURFACE MOUNT INSTALLATION (Suitable for j-box with 4”

round/square/octagonal with 1.5” depth)

Fig. 1

Turn off the power. Make sure the switch is OFF.

Fig. 2

Remove the screws on both side of the junction box, and the take off the junction box.

Fig. 3

Toggle the button to adjust the CCT, total 5 CCT can be selected.

Fig. 4

According to the embedded junction box to choose the screws (E or F)
Then, use screwdriver to lock the mounting bracket (C) to the embedded junction box with screws (E or F)

Fig.5

Firstly, choose suitable wire nuts (B).
Then, use the wire nuts (B) to connect the wire in the embedded junction box with the wires on down light (black to black, white to white, green to green)

Fig. 6

Push the downlight into the mounting bracket to complete the installation.

Make sure the clips willlock to the bracket.

Read More About This Manual & Download PDF:

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

PORTOR LIGHTING User Manuals

Related Manuals