smappee Smart EV Wall Charging with Solar and Off Peak User Guide

June 3, 2024
smappee

smappee Smart EV Wall Charging with Solar and Off Peak

Smappee EV Wall

Connect the CT to measure solar to the correct phase. Adjust the confi guration in the Smappee App when this is not the L1 phase.
When the solar installation is 3-phased, you need to purchase and install the EV Wall solar add-on.
In case of 3-phase delta (3*230 V), consult the full manual via the QR code:

Safety warning
Carrying out electrical work within the home or workplace can be dangerous and must be conducted according to the appropriate national safety standards and executed by a certifi ed electrician.
For safety purposes, it is also necessary to power off the installation before proceeding with the physical installation.
For further safety instructions and more detailed information, please consult the full manual at smappee.com/smappee-manuals or via the QR code:

How to install Smappee EV Wall

  1. Prepare the installation. Foresee a power supply & communication cable between the EV Wall and the distribution panel.

  2. Fix the mounting plate to the wall with the provided  plugs and screws.

  3. Attach the EV Wall housing to the EV Wall mounting plate with the provided small screws.

  4. Connect the power supply cable, communication cable and charging cable (if applicable) to the EV Wall.
    See diagrams overleaf. In case of 3-phase delta (3*230 V), please consult the full manual online.

  5. Connect the EV Wall modules as indicated in the diagram shown overleaf. The Connect, the EV Wall splitter, the CT Hub and Current Transformers (CTs) are installed inside the distribution panel.
    These components communicate with the charging station via the CAT 5/6 communication cable.

  6.  Connect the A and B cables and the communication cable to the cover’s PCB. Then attach the front cover to the EV Wall to close it. Switch on the power using the circuit breaker.

  7. Download the Smappee App and follow the instructions to configure your Smappee charging station.

  8. Once Smappee Connect shows a green pulsing light, validate the installation by verifying that the real-time bubbles show correctly measured values in the Smappee App/Dashboard.

  9. Create a user account for the customer and share the location with this new username. Write the username, password and email address in the Quick Starter Guide (included in the box together with this Quick Install Guide) and hand it to your customer. This user account can be used for the Smappee App and Dashboard and to set smart charging schedules.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals