STIEBEL ELTRON WPKI-HKM E Insulated Heat Pump Component Installation Guide
- June 5, 2024
- STIEBEL ELTRON
Table of Contents
STIEBEL ELTRON WPKI-HKM E Insulated Heat Pump Component
General information
This document is intended for contractors.
| Note
Read these instructions carefully before using the appliance and retain them
for future reference. Pass on the instructions to a new user if required
---|---
► This symbol indicates that you have to do something. The action you need to take is described step by step.
Relevant documents
We Operating and installation instructions for system components
Safety
Only a qualified contractor should carry out installation, commissioning, maintenance and repair of this compact installation.
General safety instructions
We guarantee trouble-free function and operational reliability only if original accessories and spare parts intended for the appliance are used.
Instructions, standards and regulations
| Note
Observe all applicable national and regional regulations and instructions
---|---
Product description
The heating compact installations WPKI-HK E and WPKI-HKM E are specifically designed for buffer cylinders SBP 200 E, SBP 400 E and SBP 700 E. In conjunction with the pipe set WPKI RB, they offer heating contractors a clear and easy means of connecting the heating system to the SBP E buffer cylinder.
The return ball valve contains a gravity brake to prevent unintentional natural circulation. The gravity brake can be opened manually by turning the handle approx. 45° to its end stop.
The compact heating installation WPKI-HK Eis suitable for operating a heating circuit without mixer.
The compact heating installation WPKI-HKM E is suitable for operating a heating circuit with mixer. The standard delivery includes a 3-way mixer with servomotor.
Standard delivery
The WPKI-HK E and the WPKI-HKM E are factory-sealed and comprise:
– high efficiency circulation pump ON 25, height 180 mm with 2 m connecting
cable
– tow-way ball valve with manual gravity brake in the return, complete with
handle
– tow-way ball valve in the flow, complete with handle
– two thermometers, 0 63 mm, display range 0-120 °C (red or blue facia ring
for identifying the flow and return)
– pump ball valve with flange and 1 ½” male (only WPKI-HK E)
– three-way mixer with variable bypass (only WPKI-HKM E)
– return pipe
– EPP insulation
– 2 fixing screws with washers and rawl plugs (in the pack)
Further accessories
– WPKI-HKV
The distributor, with 2 connection pairs respectively to the top and bottom,
is designed for the connection of two heating circuits in conjunction with the
heatixng compact installations WPKI-HK E and WPKI-HKM E.
Settings
WPKI-HKM E
3-waymixer
A bypass can be used to reduce the flow temperature by mixing in return water.
The bypass can be infinitely adjusted with the adjusting screw. For that, undo
locking screw approx. 1 mm. Tighten the locking screw again after completing
the adjustment. The mixer is regulated via the servomotor. In the delivered
condition, both mixer and bypass are closed, and the locking screw is tight.
- Adjusting screw
- Locking screw
Servomotor
The angle of rotation is electrically limited to 90°. Upon reaching its end
stops, the drive will be switched off and switched to zero volt. The
servomotor can be switched to manual control via the rotary selector on the
casing.
Installation
Circulation pump installation position
| Material losses
► Observe the circulation pump installation and operating instructions.
---|---
| Material losses
► Do not install the circulation pump on the ceiling or horizontally on the
floor.
---|---
Installation example for wall mounting
- WPKI-HK E
- WPKI-HKM E
- WPKI-HKV (not part of the standard delivery)
- Return
- Flow
① Fit the compact installation with the insulation to the existing pipework.
② Tighten the fittings by hand.
③ Mark the edges of the compact installation on the wall.
► Remove the compact installation from the wall.
► Mark the holes to be drilled.
► Drill the holes.
► Insert the rawl plugs into the holes
► Secure the lower insulation shell with the screws and washers supplied.
Installation example for cylinder mounting
- Return
- Flow
- WPKI-HK E
- WPKI-RB (not part of the standard delivery)
- SBP E (not part of the standard delivery
- Pipe bend with twin connector (not part of the standard delivery; to be used in connection with the buffer cylinder SBP 700 E)
Power supply
- brown (left-turning)
- blue (N)
- white (right-turning)
Specification
Output diagrams
High efficiency circulation pump
Lip = v (variable)
X Flow rate [m3/h] y Delivery head [m] z Power consumption [W]
High efficiency circulation pump
Lip= c (constant)
X Flow rate [m3/h] Y Delivery head [m] Z Power consumption [W]
Data table
Application limits
Max. permissible tem perature| oc| 95| 95
Hydraulic data
Flow ca pacity| m3 /h| 7.2| 5.8
Gravity brake opening pressure| MPa| 0.02| 0.02
Energy data
Energ}’ Efficiencl! Index EE i| | 0.2| 0.2
Versions
Circulation pump type| | Para 25-180/7- S0/SC-12| Para 25-180/7- S0/SC-12
Dimensions
Height| mm| 420| 420
Width| mm| 250| 250
Depth| mm| 269| 269
Connections
Connection above| | G1| G1
Connection below| | G 11/2A| G 11/2A
Values
Deliver}’ head| m| 7| 7
Max. flow rate| m3 /h| 3.3| 3.3
Servomotor data table
Rated voltage | 230 V 50/60 Hz |
---|---|
Connection | cable 3 x 1.5 mm2, 2 m long |
Rotational direction | optional acc. to wiring |
Position indicator | reversible scale plate |
Runtime | 140 sec |
Safety category | II (double insulated, without earth conductor) |
PI rating | IP 40 |
Ambient temperature | 0 °C to 50 °C |
Test symbols | CE |
Guarantee
The guarantee conditions of our German companies do not apply to appliances
acquired outside of Germany. In countries where our subsidiaries sell our
products a guarantee can only be issued by those subsidiaries. Such guarantee
is only granted if the subsidiary has issued its own terms of guarantee. No
other guarantee will be granted.
We shall not provide any guarantee for appliances acquired in countries where we have no subsidiary to sell our products. This will not affect warranties issued by any importers.
Environment and recycling
We would ask you to help protect the environment. After use, dispose of the
various materials in accordance with national regulations.
STIEBEL ELTRON GmbH & Co. KG
Dr.-Stiebel-Str. 33 I 37603 Holzminden
Tel. 05531 702-0 I Fax 05531 702-480
info@stiebel-eltron.de
www.stiebel-eltron.de
tecalor GmbH
Luchtringer Weg 3 I 37603 Holzminden
Tel. 05531 99068-95700 I Fax 05531 99068-95712
info@tecalor.de
www.tecalor.de
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>