FADINI HINDI 880 – evo Universal Hydraulic Piston Instruction Manual
- August 6, 2024
- FADINI
Table of Contents
- FADINI HINDI 880 – evo Universal Hydraulic Piston
- GENERAL WARNINGS FOR PEOPLE SAFETY
- GENERAL INFORMATION ABOUT THE PRODUCT
- COMPONENTS AND ACCESSORIES SUPPLIED WITH IT
- WIRING DIAGRAM AND ACCESSORIES
- FIRST OPERATIONS TO RUN THE PISTON SHAFT
- PREPARING THE FIXING PLATES
- FIXING GEOMETRY FOR THE GATE TO OPEN INWARDS
- FIXING GEOMETRY FOR THE GATE TO OPEN OUTWARDS
- FIXING THE OPERATOR
- SETTING HINDI 880-evo TO THE REQUIRED OPERATING MODES
- UNLOCKING FOR MANUAL OPERATIONS
- ADJUSTING THE THRUST POWER
- INSTALLING THE ELECTRIC LOCK
- FITTING THE REAR PROTECTION CAP AND COVER FIXING
- MAINTENANCE RECORD
- TECHNICAL DATA
- Product Specifications:
- FAQ (Frequently Asked Questions):
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
FADINI HINDI 880 – evo Universal Hydraulic Piston
INSTRUCTION MANUAL
GENERAL WARNINGS FOR PEOPLE SAFETY
THANK YOU
Thank you for purchasing a Fadini product.
Please read these instructions carefully before using this appliance. The
instructions contain important information which will help you get the best
out of the appliance and ensure safe and proper installation, use and
maintenance. Keep this manual in a convenient place so that you can always
refer to it for the safe and proper use of the appliance.
INTRODUCTION
This operator is designed for a specific scope of applications as indicated in this manual, including safety, control and signaling accessories as minimum required with Fadini equipment. □ Any applications not explicitly included in this manual may cause operation problems or damages to properties and people. □ Meccanica Fadini S.r.l. is not liable for damages caused by the incorrect use of the equipment, or for applications not included in this manual or for malfunctioning resulting from the use of materials or accessories not recommended by the manufacturer. □ The manufacturer reserves the right to make changes to its products without prior notice. □ All that is not explicitly indicated in this manual is to be considered not allowed.
BEFORE INSTALLATION
Before commencing operator installation assess the suitability of the access, its general condition and the structure. □ Make sure that there is no risk of impact, crushing, shearing, conveying, cutting, entangling and lifting situations, which may prejudice people safety. □ Do not install near any source of heat and avoid contacts with flammable substances. □ Keep all the accessories able to turn on the operator (transmitters, proximity readers, key-switches, etc) out of the reach of the children. □ Transit through the access only with stationary operator. □ Do not allow children and/or people to stand in the proximity of a working operator. □ To ensure safety in the whole movement area of a gate it is advisable to install photocells, sensitive edges, magnetic loops and detectors. □ Use yellow-black strips or proper signals to identify dangerous spots. □ Before cleaning and maintenance operations, disconnect the appliance from the mains by switching off the master switch. □ If removing the actuator, do not cut the electric wires, but disconnect them from the terminal box by loosening the screws inside the junction box.
INSTALLATION
All installation operations must be performed by a qualified technician, in observance of the Machinery Directive 2006/42/CE and safety regulations EN 12453 – EN 12445. □ Verify the presence of a thermal-magnetic circuit breaker 0,03 A – 230 V – 50 Hz upstream the installation. □ Use appropriate objects to test the correct functionality of the safety accessories, such as photocells, sensitive edges, etc. □ Carry out a risk analysis by means of appropriate instruments measuring the crushing and impact force of the main opening and closing edge in compliance with EN 12445. □ Identify the appropriate solution necessary to eliminate and reduce such risks.
In case where the gate to automate is equipped with a pedestrian entrance, it is appropriate to prepare the system in such a way to prohibit the operation of the engine when the pedestrian entrance is used. □ Apply safety nameplates with CE marking on the gate warning about the presence of an automated installation. □ The installer must inform and instruct the end user about the proper use of the system by releasing him a technical dossier, including: layout and components of the installation, risk analysis, verification of safety accessories, verification of impact forces and reporting of residual risks.
INFORMATION FOR END-USERS
The end-user is required to read carefully and to receive information concerning only the operation of the installation so that he becomes himself responsible for the correct use of it.
□ The end-user shall establish a written maintenance contract with the
installer/maintenance technician (on -call). □ Any maintenance operation must
be done by qualified technicians.
□ Keep these instructions carefully.
WARNINGS FOR THE CORRECT OPERATION OF THE INSTALLATION
For optimum performance of system over time according to safety regulations, it is necessary to perform proper maintenance and monitoring of the entire installation: the automation, the electronic equipment and the cables connected to these. □ The entire installation must be carried out by qualified technical personnel, filling in the Maintenance Manual indicated in the Safety Regulation Book (to be requested or downloaded from the site www.fadini.net/supporto/downloads). □ Operator: maintenance inspection at least every 6 months, while for the electronic equipment and safety systems an inspection at least once every month is required. □ The manufacturer, Meccanica Fadini S.r.l., is not responsible for non-observance of good installation practice and incorrect maintenance of the installation.
DISPOSAL OF MATERIALS
Dispose properly of the packaging materials such as cardboard, nylon, polystyrene etc. through specializing companies (after verification of the regulations in force at the place of installation in the field of waste disposal). Disposal of electrical and electronic materials: to remove and dispose through specializing companies, as per Directive 2012/19/UE. Disposal of substances hazardous for the environment is prohibited.
CE DECLARATION OF CONFORMITY of the manufacturer:
Meccanica Fadini S.r.l. (Via Mantova, 177/A – 37053 Cerea – VR – Italy)
declares under own responsibility that: Hindi 880-evo complies with the
2006/42/CE Machinery Directive, and also that it is sold to be installed in an
“automatic system”, along with original accessories and components as
indicated by the manufacturing company. An automatic gate operator is, by law,
a “machinery” and therefore the installer must fit the equipment with all of
the applicable safety norms. The installer is also required to issue the
installer’s Declaration of Conformity. The manufacturer is not liable for
possible incorrect use of the product. The product complies with the following
specific norms: analysis of the risks and subsequent action to cure them as
per EN 12445 and EN 12453, Low Voltage Directive 2014/35/UE, Electromagnetic
Compatibility 2014/30/UE.
In order to certify the product, the manufacturer declares under own
responsibility the compliance with the EN 13241-1 PRODUCT NORMS.
Tested and certified: marking and type testing according to ITT PDC No. 2392-2008. Director in charge
GENERAL INFORMATION ABOUT THE PRODUCT
HINDI 880-evo is an oil-hydraulic operator for external application on
swinging gates to automatically open and close them. It is an oil-hydraulic
product and therefore it possesses all the advantages this kind of technology
can offer such as reliability, smooth linear movements and adjustable thrust
power made possible by the pressure valves, it can suit any kind of swinging
gates. The main asset of HINDI 880-evo is that of including, in one version
only, all the available oil-hydraulic options as it can be turned into any of
the following units: double- or single-locking, non locking and in this case
the gates do not need any release action first and can be operated by hand in
either one direction or both travel directions (always reversible), adjustable
braking control in opening and closing or non braking option.
An electronic control board is required for the functioning of the operator
and has to be externally installed in a sheltered place. The electronic unit
controls all the moving functions either in automatic or semi-automatic modes,
depending on the user’s requirements. The operator can come complete with a
range of accessories that ensure safety and full control of the operations in
any application, public or private.
COMPONENTS AND ACCESSORIES SUPPLIED WITH IT
1 – N° 2 coded keys to open the sliding cover
2 – Cover front plug
3 – Anodized aluminium cover
4 – Inner manual release key
5 – Rear protection cap
6 – cable gland
7 – Oil-hydraulic operator: stroke range 150 mm, 280 mm and 400 mm 8 – N° 2
tie rods for cover fixing
9 – N° 2 grommet nuts for cover and plug fixing
11 – Front fixing for Hindi 880-evo strokes 150 mm and 280 mm 12 – front
fixing circlip
13 – Front fixing for Hindi 880-evo stroke 400 mm
14 – M12 self-locking nut
15 – Rear fixing to gate post
16 – M12x40 rear fixing screw
17 – Rear cap fixing pin
18 – Rear patching plate 150×150 mm – (optional) code No. 8311L
19 – Front patching plate120x120 mm – (optional) code No. 8310L
20 – Front patching plate 84×84 mm – (optional) code No. 8312L
SCOPE OF APPLICATION
WIRING DIAGRAM AND ACCESSORIES
Before fitting Hindi 880-evo make sure the installation is pre-set for all the safety and control accessories as required.
General layout: it is the installer’s responsibility to lay the connection pipes and tubes as properly and correctly required.
1 – Flasher
2 – Controller (installed in a protected and sheltered place) with plug-in
radio receiver
3 – 230 V – 50 Hz – 0,03 A magneto-thermal differential circuit breaker (not
supplied with the equipment) (2,5 mm² cable section beyond 100 m)
4 – Recess photocell receiver
5 – Hindi 880-evo
6 – Open position gate stop (compulsory, not supplied with the equipment)
7 – Electric lock: Hindi 880-evo non locking version and with gate leafs wider
than 2,0 m
8 – Closed position gate stop (compulsory, not supplied with the equipment)
9 – Recess photocell transmitter
10 – Stud 0,5 m – code 153L
11 – Recess key-switch – code 143L
12 – Remote control
IMPORTANT: gate stops in open and closed gate positions are absolutely necessary for the proper functioning of Hindi 880-evo.
FIRST OPERATIONS TO RUN THE PISTON SHAFT
Before fixing the operator to the gate and gate post, power supply Hindi 880-evo and run the piston shaft fully out; then swap the phases and run it 5-6 mm in.
IMPORTANT: then fully screw the ball bearing fixing eye into the shaft (Pic. 4).
PREPARING THE FIXING PLATES
First weld the front and rear fixing plates to the patching plates (Pic. 5), after assessing the installation measurements as indicated in Pic. 6 and Pic. 7 (or in Pic. 8, in the case where opening is required to be outwards).
Misalignment between post- and gate-fixings:
FIXING GEOMETRY FOR THE GATE TO OPEN INWARDS
FIXING GEOMETRY FOR THE GATE TO OPEN OUTWARDS
FIXING THE OPERATOR
Once finished with the mounting plates, unscrew the ball bearing eye by 5-6 mm
(the center distance with the locknut to be 25-30 mm): in this way a certain
amount of thrust force to close direction is ensured with the gate/s in closed
position. Important: eventually tighten the locknut hard with the help of the
holding spanner supplied with the equipment.
Fasten Hindi 880-evo on to the mounting plates by means of the supplied bolt
and circlips (Pic. 9).
SETTING HINDI 880-evo TO THE REQUIRED OPERATING MODES
General description
It is required first of all that the valve cover be removed. To do this,
remove the fastening screw inside the cover itself (Pic. 10).
The adjusting screws and by-passes of the operator are all in the valve block
and in the operator head (Pic.11).
NOTE WELL: the oil-hydraulic operator Hindi 880-evo comes FACTORY PRE-SET as a bidirectional locking and non braking unit.
The pictures that follow illustrate all of the possible setting options to turn the operator into the version that most meets the installation requirements.
UNLOCKING FOR MANUAL OPERATIONS
The manual release of Hindi 880-evo operator is required to allow the gate/s
to be moved by hand in case the bidirectional or single locking versions of
Hindi 880-evo are installed.
Insert the supplied coded key into the dedicted lock barrel in the valve block
cover and turn it anti-clockwise to slide the lid open. The manual release key
is factory-located inside, turn it by one to two turns anti-clockwise.
Once the manual operations are over, the hydraulic circuit must be re-locked
by turning the release key clockwise until securely tightened (Pic. 18).
ADJUSTING THE THRUST POWER
In order to adjust the thrust power in opening and closing loosen or tighten
the screws located inside the valve block cover, to be accessed by the
dedicated coded key (Pic. 19).
Red screw = it adjusts the thrust power in the closing cycle of the gate/s.
Green screw = it adjusts the thrust power in the opening cycle of the gate/s.
INSTALLING THE ELECTRIC LOCK
An electric lock is always required to be fitted to the gate/s whenever Hindi 880-evo corresponds to the reversible version (non locking action by the hydraulic circuit) and the gate leaf is wide up to or wider than 2,0 meters (Pic. 20 and Pic. 21).
FITTING THE REAR PROTECTION CAP AND COVER FIXING
MAINTENANCE RECORD
TECHNICAL DATA
Product Specifications:
-
Model: Hindi 880 – evo
-
Type: Universal hydraulic piston
-
Compliance: EN 13241, EN 12453, EN 12445
-
Certifications: ITT PDC N. 2392-2008
-
-
FAQ (Frequently Asked Questions):
Q: What are the key safety considerations when using the piston?
A: Ensure that the door structure can handle the weight and movement of the door throughout its operation. Proper electrical setup and safety accessories are crucial for safe usage.
Q: How do I know if the piston is suitable for my door system?
A: Refer to the product manual for guidance on selecting the appropriate piston stroke length based on your door requirements.