GENERAL WARNINGS FOR PEOPLE SAFETY
THANK YOU
Thank you for purchasing a Fadini product.
Please read these instructions carefully before using this appliance. The
instructions contain important information which will help you get the best
out of the appliance and ensure safe and proper installation, use and
maintenance. Keep this manual in a convenient place so that you can always
refer to it for the safe and proper use of the appliance.
INTRODUCTION
This operator is designed for a speciöc scope of applications as indicated
in this manual, including safety, control and signaling accessories as minimum
required with Fadini equipment.
- Any applications not explicitly included in this manual may cause operation problems or damages to properties and people.
- Meccanica Fadini snc is not liable for damages caused by the incorrect use of the equipment, or for applications not included in this manual or for malfunctioning resulting from the use of materials or accessories not recommended by the manufacturer.
- The manufacturer reserves the right to make changes to its products without prior notice.
- All that is not explicitly indicated in this manual is to be considered not allowed.
BEFORE INSTALLATION
Before commencing operator installation assess the suitability of the access,
its general condition and the structure.
- To check that the ground is stable, to avoid subsequent settling or deformation in the traffic control post installation area.
- Make sure that there is no risk of impact, crushing, shearing, conveying, cutting, entangling and lifting situations, which may prejudice people safety.
- Do not install near any source of heat and avoid contacts with øammable substances.
- Keep all the accessories able to turn on the operator (transmitters, proximity readers, key-switches, etc) out of the reach of the children.
- Transit through the access only with stationary operator.
- Do not allow children and/or people to stand in the proximity of a working operator.
- To ensure safety in the whole movement area of a bollard it is advisable to install photocells, sensitive edges, magnetic loops and detectors.
- Use yellow-black strips or proper signals to identify dangerous spots.
- Before cleaning and maintenance operations, disconnect the appliance from the mains by switching off the master switch.
- If removing the actuator, do not cut the electric wires, but disconnect them from the terminal box by loosening the screws inside the junction box
INSTALLATION
All installation operations must be performed by a qualiöed technician, in
observance of the Machinery Directive 2006/42/CE and safety regulations EN
12453 – EN 12445.
- Verify the presence of a thermal-magnetic circuit breaker 0,03 A – 230 V – 50 Hz upstream the installation.
- Use appropriate objects to test the correct functionality of the safety accessories, such as photocells, sensitive edges, etc.
- Carry out a risk analysis by means of appropriate instruments measuring the crushing and impact force of the main opening and closing edge in compliance with EN 12445.
- Identify the appropriate solution necessary to eliminate and reduce such risks.
- In case where the gate to automate is equipped with a pedestrian entrance, it is appropriate to prepare the system in such a way to prohibit the operation of the engine when the pedestrian entrance is used.
- Apply safety nameplates with CE marking on the gate warning about the presence of an automated installation.
- The installer must inform and instruct the end user about the proper use of the system by releasing him a technical dossier, including: layout and components of the installation, risk analysis, veriöcation of safety accessories, veriöcation of impact forces and reporting of residual risks.
INFORMATION FOR END-USERS
The end-user is required to read carefully and to receive information
concerning only the operation of the installation so that he becomes himself
responsible for the correct use of it.
- The end-user shall establish a written maintenance contract with the installer/maintenance technician (on -call).
- Any maintenance operation must be done by qualiöed technicians.
- Keep these instructions carefully.
WARNINGS FOR THE CORRECT OPERATION OF THE INSTALLATION
For optimum performance of system over time according to safety regulations,
it is necessary to perform proper maintenance and monitoring of the entire
installation: the automation, the electronic equipment and the cables
connected to these.
- The entire installation must be carried out by qualiöed technical personnel, ölling in the Maintenance Manual indicated in the Safety Regulation Book (to be requested or downloaded from the site www.fadini.net/supporto/downloads).
- Operator: maintenance inspection at least every 6 months, while for the electronic equipment and safety systems an inspection at least once every month is required.
- The manufacturer, Meccanica Fadini snc, is not responsible for non-observance of good installation practice and incorrect maintenance of the installation.
DISPOSAL OF MATERIALS
Dispose properly of the packaging materials such as cardboard, nylon,
polystyrene etc. through specializing companies (after veriöcation of the
regulations in force at the place of installation in the öeld of waste
disposal). Disposal of electrical and electronic materials: to remove and
dispose through specializing companies, as per Directive 2012/19/UE. Disposal
of substances hazardous for the environment is prohibited.
CE DECLARATION OF CONFORMITY of the manufacturer:
Meccanica Fadini snc (Via Mantova, 177/A – 37053 Cerea – VR – Italy) declares under own responsibility that: Vigilo complies with the 2006/42/CE Machinery Directive, and also that it is sold to be installed in an “automatic system”, along with original accessories and components as indicated by the manufacturing company. An automatic gate operator is, by law, a “machinery” and therefore the installer must öt the equipment with all of the applicable safety norms. The installer is also required to issue the installer’s Declaration of Conformity. The manufacturer is not liable for possible incorrect use of the product. The product complies with the following speciöc norms: analysis of the risks and subsequent action to cure them as per EN 12445 and EN 12453, Low Voltage Directive 2014/35/UE, Electromagnetic Compatibility 2014/30/UE. In order to certify the product, the manufacturer declares under own responsibility the compliance with the EN 13241-1 PRODUCT NORMS.
INSTRUCTIONS TO BE FOLLOWED BEFORE INSTALLING THE OPERATOR
FOR OPTIMAL APPLICATION AND USE OF THE OPERATOR PLEASE READ THE INSTRUCTIONS
AND CONSULT EXPLANATORY DIAGRAMS
OVERVIEW
This product belongs to our range of retractable traffic control posts. It is
quick and easy to install, as it does not need to be adjusted or calibrated
and has been designed to regulate and prohibit vehicular access.
The oil-hydraulic bollards VIGILO 2250 (500 mm height, with or without LEDs),
VIGILO 2263 (600 mm height, with or without LEDs), VIGILO 2280 (800 mm height,
with or without LEDs) are ötted with posts made of rust-treated steel, 200 mm
diameter; bollards are also available in stainless steel AISI 304 version.
The product’s hallmark is its ease of installation: once the housing has been
secured, the operator can be introduced ready for operation, as soon as the
wiring has been completed.
As soon as the retractable post receives a command (from a key switch or radio
transmitter), it rises from its interred position. The post is clearly visible
at nighttime thanks to a reøective strip and the possibility of connecting a
øashing light or traffic light. Versions with led lights are also available to
signal when the post is in the fully up position and when moving up or down.
Using the electronic microprocessor programmer, the operator can also be
customised with presence indicator accessories (magnetic coils, photocells).
PRELIMINARY OPENING OF ALL FUNCTIONAL COMPONENTS
Start by removing the cover plate to reveal the operator and separate the
individual components, with the aid of a hoist (Pic. 2):
this makes it easy to extract the internal piston and hydraulic main unit
container unit.
IMPORTANT: TAKE CARE NOT TO TEAR OR CUT WIRES.
ELECTRICAL LAYOUT OF THE INSTALLATION
To check that the mains supply and voltage to the electric motor is 230 V at
50 Hz. The power supply to the operator’s built-in motor must be made using
electricitycables with a 1,5 mm² section for a maximum distance of 50 metres.
For distances of over 50 metres, use electric cables with sections suited to
the installation.
- Led øashing light with built-in aerial
- Stand alone radio receiver
- Electronic programmer
- Differential circuit breaker switch (sensitivity 30 mA, protection 6-10 A)
- Junction box, electric wires
- Photocell receiver
- VIGILO post
- Photocell projector
- Transmitter
- Traffic light with two lights
- Key-switch
ARRANGING THE HOUSING
Check soil natural permeability: 50 liters of water must be vable to soak away in not longer than 30/40 minutes.Otherwise provide a pipe to allow rain water to øow either into the sewage system or a sump well equipped with a submersed pump.
IMPORTANT: once the housing has been positioned and installation
completed, it is important for the top edge to be level with the ground.
PLACING THE TRAFFIC CONTROL POST INSIDE THE HOUSING
Before performing this operation, wait for the housing to be secured örmly in place. Do not commence until the concrete has set and the electric wire pipe has been secured and covered with soil.
- Use a hoisting hook to lift the piston unit with the post and main unit (using the eyebolt) and place on top of the housing.
- The subsequent phase of this operation consists in threading the motor, limit switch, solenoid valve and LED power supply electric wires through the piping and simultaneously starting to delicately place the operator inside the housing
IMPORTANT: PASS THE MOTOR, LIMIT SWITCH, SOLENOID VALVE AND LED POWER SUPPLY ELECTRIC WIRES THROUGH THE PIPING WITHOUT TEARING OR CUTTING THE CABLES.
**** For distances greater than 10 metres, make extensions using sealed junction boxes inside an accessible dividing box.
IF THE OPERATOR IS REMOVED
- Disconnect the main switch before opening the lid of the electric cable junction box.
- Do not cut the electric wires, rather remove them from the terminal board loosening the clamping screws inside the dividing box
MAGNETIC LOOP PREPARATIONS
IMPORTANT:
make sure that no other electro-magnetic sources are located on or under the
ground near the installation to prevent interference or any affecting action
with the magnetic loops of the vehicle detecting device if installed or with
any other electronic equipment included in the system for commanding and
controlling operations.
The magnetic loop detector is a safety device operating all the time to detect
any transiting vehicle: the bollard is prevented from rising should a vehicle
cross the loop.
A hole is to be dug in the ground as indicated (see relative instructions
sheet). For proper and correct functioning of the loop detector it is
recommended to strictly keep to the installation geometry as indicated in the
instructions.
ARRANGEMENT OF THE PHOTOCELLS
Electric cables laid in the ground in a corrugated sheath
ELECTRICAL CONNECTIONS TO THE CONTROL BOARD
FIRST OPERATION MANOEUVRES
NOTE WELL: supply the system with electric power only after all of the electrical connections have been made as required for proper operations.
Having terminated installation of the traffic control post and all the safety
and control accessories (all of the NC contacts on the Elpro S40 board are to
be bridged), and the respective connections with the Elpro S40 programmer, and
having completed thorough risk analysis, the örst operation manoeuvres can be
performed. If you have a radio transmitter, encode the radio receiver
according to the relative instructions before giving the command to raise the
retractable post, or give the manoeuvre command using a key switch. Once power
is supplied, connect the motor/pump cable and, satisöed that the limit switch
LEDs are properly alight, the post should move up on the örst commanding
pulse; should it fail, disconnect power supply and swap the connections to the
live terminals.
VERSION OF VIGILO WITH SOLENOID VALVE
In the version of VIGILO with solenoid valve no manual overriding action is
needed, and in case of power failure the post descends automatically øush with
pavement level. To enable the solenoid valve to operate properly, the electric
wires labelled “ELETTROVALVOLA – Solenoid valve” from the post assembly are to
be connected, through the voltage stabilizer, to terminals 22 and 23 in the
Elpro S40 control box.
GROUND-LEVEL CLOSURE – COVER PLATE
- Use the four screws to close the cover plate.
- Lift the retractable post for facilitate closure of the post cover with the buffer, give the command (by encoding a transmitter with the radio receiver or a key switch) to lift the retractable post.
TECHNICAL DATA
ELECTRIC MOTOR
- Power output: 0,25 kW (0,33 HP)
- Supply voltage: 230 Vac
- Frequency: 50 Hz
- Absorbed power: 400 W
- Absorbed current: 1,8 ÷ 3,5 A (6 A)
- Motor revolutions: 2.800 rpm
- Capacitor: 20 µF
- Service mode: S3
HYDRAULIC ACTUATOR
- Shaft diameter: 16 mm
- Piston diameter: 30 mm
- Pre-set pushing power: 15 daN
- Protection standard complete: IP 55
FEATURES | VIGILO 2250 | VIGILO 2263 | VIGILO 2280 |
---|---|---|---|
Impact resistance | 30.000 J | 30.000 J | 30.000 J |
Crash resistance | 160.000 J | 160.000 J | 160.000 J |
Max static load | 20.000 kg | 20.000 kg | 20.000 kg |
Bollard weight [B] | 102 kg | 110 kg | 131 kg |
Post diameter | ø 200 mm | ø 200 mm | ø 200 mm |
Post height | 500 mm | 600 mm | 800 mm |
Post önishing | powder coating polyester anthracite grey RAL 7016 | powder | |
coating polyester anthracite grey RAL 7016 | powder coating polyester |
anthracite grey RAL 7016
Post material| S235JRH steel| S235JRH steel| S235JRH steel
Post material Stainless Steel/inox version| AISI 304| AISI 304| AISI 304
Bollard thickness| 4 mm| 4 mm| 4 mm
Ground sleeve treatment| hot dip galvanization| hot dip galvanization| hot dip
galvanization
PERFORMANCE – VIGILO 2250
-
Frequency of use: intensive
-
Service cycle: rise ~5,1 s
dwell 30 s
lower ~4,3 s
dwell 30 s -
Complete cycle time: ~69 s
-
Complete cycles rise-dwell-lower-dwell: No. 52/hour
-
Annual cycles (with 8 hours of use per day): No. 151.840
PERFORMANCE – VIGILO 2263
-
Frequency of use: intensive
-
Service cycle rise: ~5,9 s
dwell 30 s
lower ~5,2 s
dwell 30 s -
Complete cycle time: ~71 s
-
Complete cycles rise-dwell-lower-dwell: No. 51/hour
-
Annual cycles (with 8 hours of use per day): No. 148.920
PERFORMANCE – VIGILO 2280
-
Frequency of use: intensive
-
Service cycle rise: ~7,7 s
dwell 30 s
lower ~7,0 s
dwell 30 s -
Complete cycle time: ~74 s
-
Complete cycles rise-dwell-lower-dwell: No. 48/hour
-
Annual cycles (with 8 hours of use per day): No. 140.160
OVERALL DIMENSIONS AND DIAGRAM
Overall dimensions| A| B| C| D| E| F|
G| H
---|---|---|---|---|---|---|---|---
Vigilo 2250| 500| 410| ø 200| 410| 170| ø 275| 850| 1.350
Vigilo 2263| 600| 960| 1.560
Vigilo 2280| 800| 1.140| 1.940
N.W.
- Measurements are in millimeters (mm).
- Each Vigilo bollard is supplied equipped with electric cables of 10 meters in length (for electric motor, limit switch, solenoid valve, leds).
WARNINGS
-
Installation operations, testing, analysis of the risks and future maintenance are to be executed by qualiöed and authorized technicians in compliance with the existing regulations (www.fadini.net/supporto/download).
-
This automatic system is intended to be exclusively used for the applications described in this manual, including all of the safety and command accessories, at least as required.
-
Any application not indicated in this manual may cause malfunctioning or damages to people and properties.
-
Make sure the soil is adequate to take the bollard to avoid that settling at a later stage causes problems to the system.
-
Make sure the site is free from utilities that may interfere with it.
-
Make sure that electromagnetic sources are at a suitable distance from the accessories, especially from the loop detectors.
The magnetic öelds of other sources might affect the detections of the safety loops as well as those of the other command and safety devices of the system. -
Make sure the power supply to the electric motor is 230 V (50 Hz).
-
It is recommended either of the following power supply cables:
- 10 meters electric cable 4×1 mm² for motor pump power supply;
- 10 meters electric cable 3×0,5 mm² for limit switches.
The section of the ground cable is to be chosen in compliance with the requirements of the installation site.
-
In case any components or accessories need replacing, use only original parts as provided by the manufacturer.
-
The installer shall provide the önal user with information related to all of the operating commands and functions of the system, including that concerning lowering of the post in case of an emergency (manual release operation).
-
The installer shall inform the önal user of the dangers coming from the presence of persons, especially children, in the proximity of the bollard.
-
The manufacturer reserves the right to change this manual without previous notice.
As far as conöguration and execution of the system are concerned, these are to comply with the laws in the country of installation.
Meccanica Fadini is not liable for any possible damages derived from incorrect
use or from any use not indicated in this manual, furthermore it is not
answerable for malfunctioning caused by the use of materials or accessories
not approved by the company itself.
It is to be noted that the product respects the impact and breakout resistance
values as indicated provided that the installation of the same is carried out
in observance of the speciöcations included in this manual of instructions.
Various factors are to be carefully taken into consideration such as
compaction index, soil permeability coefficient, concrete type, which may
affect the indicated values even signiöcantly.
PRODUCT SPECIFICATIONS
Heavy duty, fully retractable, automatic bollard made up of an incorporated
oil-hydraulic motor pump unit and an oil-hydraulic actuator inside the moving
cylinder. Suitable for applications in private and commercial areas, and for
industrial installations. IP67. The height of the rising cylinder (from ground
level) can be 500/600/800 mm. The rising cylinder is made of S235JRH steel,
thickness 4 mm and Ø 200 mm, cataphoresis treated and powder coated. Rising
cylinder also available in AISI 304 brushed stainless steel. Rubber ring on
rising cylinder head. Cataphoresis treated aluminium cover with slip proof
önish on treadable top.
Rising cylinder ötted with high intensity, microprismatic, retroreøecting
approved sticker (h 80 mm), available with signal LEDs (N.8) with øashing
light ötted all around the top. Hot dip galvanized steel casing for ground
foundation, ötted with a cover allowing access to the hydraulic release for
manual lowering of the bollard by a special spanner in an emergency. Impact
resistance 30.000 J, breakout resistance 160.000 J, static load max 1.600 kg
in standing position, max 20.000 kg in lowered position. Working temperature
-40 °C +80 °C. Supply voltage 230 Vac ± 10%, 50 Hz. Absorbed power 330 W.
Rising time ~ 5,1 s [rising cylinder H 500 mm], ~ 5,9 s [rising cylinder H 600
mm] ~ 7,7 s [rising cylinder H 800 mm].
Frequency of use 2.000 cycles/day. Hydraulic device to lock the bollard in the
standing position, on request a solenoid valve can be ötted for the
spontaneous descent of the bollard in case of a power failure.
MAINTENANCE
OPERATIONS FOR ORDINARY ROUTINE MAINTENANCE OF FADINI AUTOMATIC BOLLARDS (EVERY SIX MONTHS)
The standard maintenance routine sequence is as follows:
- Clean the ground cylinder and suck all material settlements.
- Clean water drains located at the bottom of the ground cylinder and/or excavation pit.
- Check any possible oil leaking from the hydraulic piston and, in case, öx it.
- Overhaul the screws fastening the bollard to the ground cylinder, making sure they are properly tightened and lubricated.
- Check the oil-hydraulic motor-pump and oil pressure by assessing the rising times of the bollard. If required, top up oil in the reservoir and/or parallel add an extra capacitor to the existing one (instructions manual is to be referred to).
- Check the correct functioning of the signal LED lights (if incorporated) in the bollard head.
- Sight check the electronic board controlling the bollard/s (e.g.: “øooded” relay contacts, oxidized terminal clamps, etc.).
- Check the correct functioning and positioning of the limit switches.
- Check the release system for bollard manual operations.
- Clean and recondition the rising cylinder if required, e.g.: paint patching up, replacing the back reøecting sticker and /or the cover ötted with rubber edge.
IF OPTIONAL ACCESSORIES ARE INCLUDED, FURTHER MAINTENANCE IS REQUIRED AS FOLLOWS:
- Check the correct functioning of the safety accessories such as the inductive loop/s and the photocells.
- Check the correct functioning of the radio receiver and all of the remote controls.
- Check the correct functioning of the pressure switch.
- Check the correct functioning of the beeper.
- Check the correct functioning of the traffic lights and the respective control card.
- Check the correct functioning of the solenoid valve in emergency cases such as power failure or disconnection, assess therefore the status of the 24 Vdc voltage stabilizer.
- Check the correct functioning of E.A.R. 35 acoustic analyzer to lower the bollard in emergency
MANUAL RELEASE OPERATIONS
In the case of a blackout, the post can be lowered manually following the instructions show in pic. 15.
Insert the release key in the release key recess
Release the hydraulic circuit by turning the release key one turn anti-
clockwise
Press to lower the post manually
Block the hydraulic circuit by turning the release key clockwise (tighten until securely locked)