midmark TP200 Front Cover Upper Installation Kit Instruction Manual
- July 18, 2024
- Midmark
Table of Contents
Applies to Models: All
Special Tools: none
TP200 Front Cover Upper Installation Kit
Front Cover Upper Installation [Kit 002-11035-00]
Step 1:
Turn power switch to off. Unplug from power cord from back of delivery system.
Step 2:
Release pressure from pressure tank by holding cloth on tube and opening
valve. Step 3:
Move toggle switch for water bottles to middle position to release pressure
from water bottles. Step 4:
Remove both water bottles from the dental delivery system. Step 5:
Remove mat from lid. Open top lid by pulling lever back and lifting lid all
the way up. Step 6:
Pull side storage out. Remove by pushing drawer slide clips on side storage
towards the rear of delivery system to release from slide base and pull side
storage out. Step 7:
Remove screws (4) from hand piece bracket.
Step 8a: 4 handpiece
Loosen set screws (3) and remove control knobs. Loosen water valve nuts (3)
and remove trim nuts (3) from needle valves. Remove needle valves (3) and
label as needed. Step 8b: 5 handpiece
Loosen set screws (4) and remove control knobs. Loosen water valve nuts (4)
and remove trim nuts (4) from needle valves. Remove needle valves (4) and
label as needed. Step 9:
Remove knob cap and loosen knob clamp screw. Remove knob and clear indicator
disk from switch. Remove nut (1) and washer (1) from switch and remove switch.
Step 10:
Remove nuts (2) from gauge bracket and remove gauge bracket. Loosen and remove
fitting and gasket from gauge. Remove gauge. Step 11:
Remove fiber optics module and scaler module from PC board cover and place in
delivery system out of the way.
Remove nuts(2) and cover from water level LED PC board. Step 12:
Remove hex nuts(4) and water level PC Board from delivery system. Step 13:
Remove upper front cover. Step 14:
Install upper front cover and ensure tabs are under front and side covers as
shown. Step 15:
Connect wire harness from main PC board to water level LED PC board. Install
water level LED PC board onto screws under front panel. Secure with hex nuts
(4). Step 16:
Install water level PC Board cover and secure with hex nuts (2). Step 17:
insert gauge into upper front cover. Install fitting and gasket onto gauge.
Position gauge bracket onto gauge and secure with nuts (2). Step 18:
Insert switch into upper front cover and secure with washer (1) and nut (1).
Install knob and indicator disk onto switch. Tighten knob clamp screw and
install knob cap. Step 19a: 4 handpiece
Insert needle valves (3) into upper front cover. Install trim nuts (3) onto
needle valves and tighten water valve nuts (3). Install control knobs and
tighten set screws (3). Step 19b: 5 handpiece
Insert needle valves (4) into upper front cover. Install trim nuts (4) onto
needle valves and tighten water valve nuts (4).
Install control knobs and tighten set screws (4). Step 20:
Install screws (4) to handpiece bracket.
Step 21:
Move and secure fiber optics module and scaler module to PC board top cover.
Step 22:
Line up slides and push side storage all the way in so slides engage. Pull
side storage back out to ensure it is install completely. Step 23:
Close lid and push down on middle until a click is heard. Install mat onto
lid. Step 24:
Install both water bottles onto delivery system. Move toggle switch to add
pressure to water bottle for use. Step 25:
Plug in power cord to back of delivery system. Push power switch to on.
© 2024 Midmark Corp.
60 Vista Drive Versailles,
OH 45380 USA
1.800.643.6275
1.937.526.3662
midmark.com
TP200 20-42-FO-00012
Rev A2 ECO088522
003-10671-00
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>