Custom Dynamics CD-FILL-COV-B Support Rail Bolt Covers Installation Guide
- July 4, 2024
- Custom Dynamics
Table of Contents
Custom Dynamics CD-FILL-COV-B Support Rail Bolt Covers
Product Information
Specifications
- Part Numbers: CD-FILL-COV-B, CD-FILL-COV-C
- Package Contents:
- Support Rail Bolt Covers (2)
Product Usage Instructions
- Remove all necessary parts to detach the battery negative cable from the battery.
- Remove both saddlebags and store them in a safe place to prevent damage.
- Clean the area at the support rails with denatured alcohol and let it dry for 1-2 minutes.
- Remove the protective red film from the back of the Support Rail Bolt Cover and place it into the support rails, covering the support bolts.
- Attention: Please read all information below before installation.
- Alignment: Tabs need to be filed down or clipped.
- Warning: Disconnect the negative battery cable from the battery following the owner’s manual. Failure to do so may result in electrical shock, injury, or fire. Secure the negative battery cable away from the positive side of the battery and all other positive voltage sources on the vehicle.
- Safety First: Always wear appropriate safety gear, including safety glasses, when performing any electrical work. It is highly recommended that safety glasses be worn throughout this installation process. Ensure the vehicle is on a level surface, secure, and cool.
- Important: The ambient installation temperature must be 60 degrees F or higher. Allow 24 hours for the tape to cure before washing or prolonged use of the vehicle.
We thank you for purchasing the Custom Dynamics® Support Rail Bolt Covers. Our products utilize the latest technology and high quality components to ensure you the most reliable service. We offer one of the best warranty programs in the industry and we back our products with excellent customer support, if you have questions before or during installation of this product please call Custom Dynamics® at 1(800) 382-1388.
Part Numbers: CD-FILL-COV-B CD-FILL-COV-C
Package Contents
Support Rail Bolt Covers (2)
Fits : 2009-2024 Harley -Davidson® FLHT, FLHR, FLHX, and FLTR Touring models (Including CVO). Requires installation of ProBEAM® Fillerz® Lights (Sold separately).
ATTENTION
Please read all information below before the Installation
- Warning : Disconnect negative battery cable from battery; refer to owner’s manual. Failure to do so may result in electrical shock, injury, or fire. Secure the negative battery cable away from the positive side of battery and all other positive voltage sources on vehicle.
- Safety First: Always wear appropriate safety gear including safety glasses when performing any electrical work. It is highly recommended that safety glasses be worn throughout this installation process. Be sure vehicle is on level surface, secure and cool.
- Important: Ambient install temperature must be 60 degrees F or higher. Allow 24 hours for tape to cure before washing or prolonged use of the vehicle
Installation:
Note : Must be installed with Custom Dynamics® ProBEAM® Fillerz® lights (sold separately). In addition, these covers can only be added at the time of Fillerz® installation, they cannot be added after Fillerz® are already installed on the motorcycle.
- Remove all necessary parts to remove the battery negative cable from the battery.
- Remove both saddlebags and store them in a safe place to prevent damage.
- Clean area at support rails with denatured alcohol, let dry 1-2 minutes.
- Remove protective red film from back of the Support Rail Bolt Cover and place into the support rails covering the support bolts.
- Continue to the installation instructions for the ProBEAM® Fillerz® installation.
Note : The alignment tabs on the ProBEAM® Fillerz® will need to be removed. Recommend filing down or clipping. Shown in Figure 1.
Questions?
- Email : info@CustomDynamics.com or
- Call us at 1 800-382-1388 M-TH 8:30 AM-5:30 PM / FR 9:30 AM-5:30 PM EST
FAQ
Q: What should I do if I encounter alignment issues during installation?
A: If alignment issues arise, carefully file down or clip the alignment
tabs as needed to ensure proper fit.
Q: What is the recommended ambient temperature for installing /the Support
Rail Bolt Covers?
A: The ambient installation temperature should be 60 degrees F or higher
for optimal results.
Q: Where can I contact for additional questions or support?
A: For further inquiries, you can email
info@CustomDynamics.com or call 1
800-382-1388 during business hours:
Monday to Thursday 8:30 AM-5:30 PM and Friday 9:30 AM-5:30 PM EST.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>