dormakaba L80 Muto Comfort Ceiling Mount with Dormotion Installation Guide

June 20, 2024
dormakaba

dormakaba Logo MUTO Comfort L80
Ceiling mount with Dormotion
Installation Manualdormakaba L80 Muto Comfort Ceiling Mount with
Dormotion 936045 – 11/2023
Original document

Technical specifications

1.1 Overview
These instructions are for installation of MUTO COMFORT sliding door system L80 for the following mounting and style versions:
1. Ceiling mount
1.1.1 General information

  • dormakaba requires use of tempered monolithic or tempered laminated glass.
  • dormakaba glass hardware is not suitable for application in rooms where chemicals (e.g. chlorine) are used as indoor swimming pools, saunas or salt-water pools.
  • Never move sliding panels faster than walking speed and always stop the door manually before it reaches end position.
  • Do not slide doors with excessive force. Install limiting stop to prevent door from opening too far.

1.1.2 Intended use

  • For sliding door in dry indoor areas only
  • For manual slowly opening and closing only

1.1.3 Glass requirements and fittings

  • The substructure/wall must be able to bear permanent loads and be level (max. tolerance: 1/16” [2] per 39” [1m]).
  • Fasteners must be sufficiently dimensioned for the substructure/wall and weight of the door.
  • When adjusting glass components, always stick to the required clearance for the respective hardware. Adjust clearance so glass does not come in contact with any hard surfaces such as glass, metal or concrete.
  • Do not use excessive force when installing the glass (avoid over tightening screws).

1.1.4 Requirements for glass panel

  • dormakaba requires use of fully tempered glass, which complies with ASTM C 1036 and ASTM C 1048. Secondary heat soaking processes are optional but not required. This applies to both tempered monolithic and tempered laminated glass.
  • Clamping area must be flat and uncoated (no self-cleaning coating!)
  • Never use glass with conchoidal fractures and/or damaged edges.

1.1.5 Safety instructions

  • Installation requires two people.
  • Only properly qualified and specially trained staff are authorized to mount dormakaba glass hardware.
  • Due to crushing hazards and possible injury caused by breakage of glass during mounting, corresponding protective clothing (especially gloves and protective goggles) is required.
  • Never clamp metal fitting hardware directly to glass surface.

1.1.6 Symbols used – Safety/Installation
CAUTION
Mounting components must meet the requirements of substructure/wall and door weight. Please read the technical information for fittings.
WARNING
Risk of breaking glass. When installing the door, support the door panel with a block of wood or similar object.
TIPS AND RECOMMENDATIONS
Information note
CLOSING EDGE

1.1.7 Maintenance, care, repair

  • Immediately replace damaged parts.
  • Always use original dormakaba parts.
  • Clean clamping area with alcohol-based standard commercial cleaning agent before mounting the glass hardware.
  • Use a damp clothe for occasional cleaning, especially the track.
  • Always use silicone – and oil-free cleaners (e.g. acetone).
  • Check glass hardware at regular intervals for proper positioning and smooth operation and correct adjustment.
  • High traffic door systems require inspection by properly qualified staff (specialized companies or installation firms.)

1.1.8 Disposal
Disposal in accordance with local, state and national regulations.

1.2 Specifications – technical data

| Single Door| Double Door
---|---|---
| L80| L80
Ceiling mount| Door leaf weight lbs [kg]*| ≤176lbs
[≤80]| 2 x ≤176lbs
[2 x ≤80]

  • Including weight of auxiliary hardware.

1.3 Tempered laminate glass (TLG) and adhesive specifications

Required parts for laminate glass with MUTO System (not included)| Part Number| Quantity| Usage recommendation
---|---|---|---
3M™ Scotch-Weld™ Urethane
Adhesive, DP 605 NS| 934.800| 1 tube| 1 tube per 4 roller carriers
3M™ Scotch-Weld™ EPX™ Plus II
Applicator with 1:1 Plunger 2| 934.801| 1 applicator| 1:1 plunger with 934.800 adhesive
3M™ Scotch-Weld™ EPX™ Plus II
Mixing Square Nozzle, 5.3mm 3| 934.805| Pk of 4| 4 nozzles per 1 tube of adhesive
MUTO TLG gasket set| 807.640| 1 set
Handling time frame| Function| Time
| Working life (time between 5 minutes @ 75°F application and clamping of carrier)
Handling strength| 20 minutes @ 73°F or more
Full cure time (normal door usage not recommended until full cure time as been met)| 48 hours @ 73°F or more

NOTE: Door glass should not be installed until the full cure time as been reached (see chart above).
Important safety-related information for the mounting and use of dormakaba glass hardware.
1.1 Clean clamping area with alcohol-based standard commercial cleaning agent before mounting the glass hardware.
1.2 Never clamp metal glass fitting hardware directly to glass surface.
1.3 Never use clamping product on surfaces with self-cleaning coatings.

2 Scotch-Weld™ EPX™ Plus II Applicator with 1:1 Plunger is a trademark of 3M.
3 Scotch-Weld™ EPX™ Plus II Mixing Square Nozzle is a trademark of 3M.

Installation instructions

2.1 Overalldormakaba L80 Muto Comfort Ceiling Mount with Dormotion -
Installation instructions

1.1 Cover
1.2 Brush strip
1.3 Track| 1.4 End cap
1.5 End stop
1.6 Cover clips| 1.7 Start/stop guide
1.8 Roller carrier| 1.9 Floor guide
1.10 Dormotion units
---|---|---|---

2.2 Securing track to mounting surface
Fig. 1 dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
1

2.2.1 Ensure the track is properly level and secure it to the ceiling per the appropriate measurements on the following page.
NOTE: SEE DIMENSION INSTRUCTIONS ON NEXT PAGE FOR REFERENCE.
2.2.2 Use appropriate fasteners according to the following recommendations.
NOTE:
OVERHEAD REINFORCEMENT:

The overhead reinforcement must be a minimum of ¼” [6] x 3” [76] steel angle, 16 gauge metal stud, or two pieces of 1-1/2” [38] thick wood blocking [double stacked], secured to studs or joists on a maximum 16” [406] centers for the length of the track. The overhead reinforcement may be flush on the overhead surface or on the interior of this surface.
Track mounting screws must fully penetrate the steel angle, metal stud, or at a minimum of 2” [51] into wood blocking, utilizing the predrilled holes in the MUTO track.
Consult with a structural engineer to determine if reinforcement is adequate for your specific application or to meet specific codes in your location.

2.3 Door/wall dimensions
Single door mountdormakaba L80 Muto Comfort Ceiling Mount with
Dormotion - Figure 2

Double door mountdormakaba L80 Muto Comfort Ceiling Mount with
Dormotion - Figure 5

2.4A Installing roller carriers: on monolithic glass ONLY
Fig. 2
DETERMINE THE LEADING (X) VERSUS TRAILING (Z) EDGE OF THE GLASS.
“LEADING IS SIDE CLOSEST TO LATCH CLOSED.”dormakaba L80 Muto Comfort Ceiling
Mount with Dormotion - Figure 3 Roller location on glass with DORMOTION unit

| L80
---|---
Single door| X| 3-1/8” [80]
Single door| Z| 1-9/16” [40]
Double door| X| 1-9/16” [40]
Double door| Z| 2-3/8” [60]
Legend

| Closing edge of door
Torque values
L80| 10ft lbs
[14Nm]
Hex key size
L80| 2.5mm

NOTE: FULLY CLEAN SURFACE OF GLASS WITH AN ALCOHOL-BASED MILD GLASS AND SURFACE CLEANER. ENSURE NO DEBRIS IS ON THE GASKET.
NOTE: ENSURE ROLLER CARRIER WHEELS ARE FREE OF DEBRIS.
2.4A.1 Slide roller carriers onto glass.
2.4A.2 Slide glass gasket and metal shim between glass and roller carrier.

  • NOTE: Orient gasket with rubber side facing the glass.

2.4A.3 Secure roller carriers to glass using appropriate-size hex key at 10 ft lbs [14 Nm].

2.4B Installing roller carriers: on tempered laminate glass ONLY
Fig. 3
DETERMINE THE LEADING (X) VERSUS TRAILING (Z) EDGE OF THE GLASS.
“LEADING IS SIDE CLOSEST TO LATCH CLOSED.”dormakaba L80 Muto Comfort Ceiling
Mount with Dormotion - Figure 6 Roller location on glass with DORMOTION unit

| L80
---|---
Single door| X| 3-1/8” [80]
Double door| X| 1-9/16” [40]
Single door| Z| 1-9/16” [40]
Double door| Z| 2-3/8” [60]
Legend

| Closing edge of door
Hex key size
L80| 2.5mm
Torque values
L80| 4ft lbs
[5Nm]

dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
7

NOTE: THE RECOMMENDED ADHESIVE’S SET-UP TIME IS 20 MINUTES FOR THE DUO- PAK CARTRIDGES.
NOTE: USE 1:1 RATIO PLUNGER WITH THE 3M™ Scotch-Weld™ Urethane Adhesive.
NOTE: FULLY CLEAN SURFACE OF GLASS WITH AN ALCOHOL-BASED MILD GLASS AND SURFACE CLEANER. ENSURE NO DEBRIS IS ON THE GASKET.
NOTE: ENSURE ROLLER CARRIER WHEELS ARE FREE OF DEBRIS.
2.4B.1 Slide carriers onto glass.
2.4B.2 Replace existing gasket with TLG gasket.
2.4B.3 Slide laminated glass gasket and metal shim between glass and roller carrier.
NOTE: Orient gasket with rubber side facing the glass.
2.4B.4 Replace existing set screws with vented set screws.
2.4B.5 Tighten vented set screws at 4 ft lbs [5Nm].
NOTE: Onto scrap material, first dispense approximately 12″ of 3M™ Scotch-Weld™ Urethane Adhesive prior to application to prevent mixing errors and ensure optimal hardening.
2.4B.6 Dispense adhesive into vented set screws on both sides of carrier.
Stop application when adhesive can be seen past edge of roller carrier.
DO NOT WIPE any excess adhesive from glass surface. Allow adhesive to dry and scrape off glass surface with a beveled-edge chisel or putty knife.
NOTE: Keep glass flat during curing process.
NOTE: See chart in Specifications section for appropriate curing time.

2.5 Install DORMOTION start/stop
Fig. 4
PRODUCT SHIPPED WITH 7/8” [22] PIN INSTALLED.
PIN CAN BE CHANGED TO 1” [25] IF NECESSARY.

Torque

Set screws| 3 ft lbs
[3 Nm]
Hex key size
Set screws| 3 mm
Hex screws| 3 mm

dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
9 NOTE: Determine a pin length based upon how square and plumb the opening is.
2.5.1 If required, change pin in start/stop assembly.

  • Remove hex screws.
  • Remove existing pin and plate.
  • Swap in appropriate pin and plate.
  • Replace hex screws.

2.5.2 Slide start/stop onto glass.
2.5.3 Center equally between the carriers.
2.5.4 Slide glass gasket between start/stop and glass.
NOTE: Orient with gasket facing glass.
2.5.5 Secure start/stop via set screws.

2.6 Disengaging the anti-jump
Fig. 5

dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
10 NOTE: Anti-jump shipped engaged.

Hex key size

L80| 2.5mm

2.6.1 Disengage the anti-jump on roller carrier.
NOTE: Using the appropriate-size hex key, push antijump adjustment screw IN and turn COUNTERCLOCKWISE 90° to disengage anti-jump.

2.7 Installing the end stops
Fig. 6dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
11

Hex key size

L80| 2mm

2.7.1 Slide end stops into each end of the track.
NOTE: Loosen bottom section of end stop for easier install.
NOTE: Be sure set screw is flush with back of end stops.
NOTE: Exact location/adjustments will be determined in “Adjustment End Stop Location” step.

2.8 Install glass/rollers in track
Fig. 7
If installing/hanging tempered laminated glass panels, ensure carrier adhesive has cured for 48 hours. See Specifications for more information on cure time. ENSURE ROLLERS AND TRACK ARE FREE OF DEBRIS.
2.8.1 Place glass on setting blocks on floor for stability.
2.8.2 Tip glass and rollers upward and rest rollers on track.

2.9 Install floor guide
Fig. 8
dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
13 ANTI-JUMP IS DISENGAGED!
2.9.1 Align centerline of glass with centerline of floor guide.
2.9.2 Be sure the glass is plumb.
2.9.3 Mark appropriate floor guide measurements.
2.9.4 TEMPORARILY REMOVE GLASS AND ROLLERS FROM TRACK.
2.9.5 Pre-drill into mounting surface using a 5/16″ drill bit.
2.9.6 Secure floor guide anchor with included fasteners.

2.10 Install floor guide: continued
Fig. 9
dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
142.10.1 SET GLASS AND ROLLERS ONTO TRACK.
2.10.2 Slide floor guide over floor guide anchor and tighten with set screws.
2.10.3 Remove setting blocks.
NOTE: Be sure glass is centered in floor guide.
2.10.4 Adjust using set screws.

2.11 Engaging anti-jump
Fig. 10
dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
15

Hex key size

L80| 2.5mm

2.11.1 Engage anti-jump on roller carrier.
2.11.2 Using appropriate-size hex key, push anti-jump adjustment screw IN and turn CLOCKWISE 90° to engage anti-jump.

2.12 Adjustment door height
Fig. 11

Door height adjustment tolerance L80 +3/16″ [+5] -3/16″ [-5]
XL150/80 torque L80 torque

10 ft lbs
[14 Nm]| 5 ft lbs
[6 Nm]
Hex key size

L80| 2.5mm

2.12.1 Set height of glass door.
2.12.2 Loosen height adjustment locking screws of carrier.
2.12.3 Using appropriate-size hex key, turn height adjustment screw CLOCKWISE or COUNTERCLOCKWISE to raise or lower glass.
NOTE: Be sure glass is level during this adjustment.

2.13 Adjustment end stop location: LEADING end stop
Fig. 12dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
18 NOTE: bi-folding: Be sure there is a 1/4″ [6] gap between the right and left hand sets.

Hex key size

L80| 2mm

Set end stop locations:
2.13.1 Slide end stop to desired location on track. Bumper should touch edge of roller carrier.

L80 torque| 2 ft lbs
[3 Nm]
---|---

Adjustment end stop location: TRAILING end stop
Fig. 13dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
20 NOTE: bi-folding: Be sure there is a 1/4” [6] gap between the right and left hand sets.

Hex key size

L80| 2mm

Set end stop locations:
2.13.1 Slide end stop to desired location on track. Bumper should touch edge of roller carrier.

L80 torque| 2 ft lbs
[3 Nm]
---|---

2.14 Install DORMOTION units
Fig. 14 DM unit installationdormakaba L80 Muto Comfort Ceiling Mount
with Dormotion - Figure 22

RH Dormotion -door closed
2.14.1 Rotate RH DM fastening plates.

  • Using 4 mm hex key, loosen fastening plate hex screws.
  • Rotate fastening plates until they are parallel to the DM unit (Fig. 14.2)
  • Snug hex screws.

2.14.2 Move door to close position.

  • For installation of RH DM unit, door must be in the closed position against bumper.

Fig. 14.7 RH DM unit aligned in track

2.14.3 Align DM unit in track, engage DM hook in DM trigger.

  • Align DM unit in track (Fig. 14.7).
  • Slide DM unit over the DM trigger block until the DM hook engages the DM trigger (Fig. 14.4)

2.14.4 Use adjustment tool to set DM unit final position.

  • Place adjustment tool flat against DM unit with fork between DM hook and DM end stop (Fig. 14.5).

  • Slide DM unit over until hook and DM end stop are against the fork.
    This sets 5 mm gap (fork gap).

  • Trigger height: Adjust so trigger sets on top of adjustment tool (Para. 2.15).

2.14.5 Secure the DM unit in position.

  • NOTE: Insure door is fully closed against bumper before performing this step.
  • Using 4 mm hex key, tighten DM unit fastening plate socket head cap screws . Fastening plates must engage the track (Fig. 14.6 and .8).
    Torque

    Socket head cap screws| 3 ft lbs [4 Nm]

Fig. 14.8 RH DM unit installed in track Fig. 14 DM unit installation (Con’t)
dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
32

LH Dormotion -door open
2.14.6 Rotate DM fastening plates.

  • Using 4 mm hex key, loosen fastening plate hex screws.
  • Rotate fastening plates until they are parallel to the DM unit (Fig. 14.10)
  • Snug hex screws.

2.14.7 Move door to open position.

  • For installation of LH DM unit, door must be in the open position against bumper.

Fig. 14.15 LH DM unit aligned in track

2.14.8 Align DM unit in track, engage DM hook in DM trigger.

  • Align DM unit in track (Fig. 14.15).
  • Slide DM unit over the DM trigger block until the DM hook engages the DM trigger (Fig. 14.12)

2.14.9 Set DM unit final position.

  • Place adjustment tool flat against DM unit with fork between DM hook and DM end stop (Fig. 14.13).

  • Slide DM unit over until hook and DM end stop are against the fork.
    This sets 5 mm gap (fork gap).

  • Trigger height: Adjust so trigger sets on top of adjustment tool (Para. 2.15).

2.14.10 Secure the DM unit in position.

  • NOTE: Insure door is fully open against bumper before performing this step.
  • Using 4 mm hex key, tighten DM unit fastening plate socket head cap screws . Fastening plates must engage the track (Fig. 14.16).
    Torque

    Socket head cap screws| 3 ft lbs [4 Nm]

Fig. 14.16 LH DM unit installed in track

2.15 Adjust start/stop pin height (if necessary)

Fig. 15

2.15.1 Adjust HEIGHT of start/stop pin, if necessary:

  • Loosen hex screws.
  • Slide pin and plate up or door.

Hex key size

Hex screws| 3 mm

2.16 Cover clips
Fig. 16dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
27 2.16.1 Insert cover clips into track. (One clip per foot)
2.16.2 Insert perpendicular to track, and turn CLOCKWISE to snap into place.

2.17 Install brush profile
Fig. 17
dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
282.17.1 Measure and cut brush to appropriate length.
2.17.2 Slide brush into cover.

2.18 Install view protection clips
Fig. 18
TO BE USED WITH ONE OR MULTIPLE SIDELITE APPLICATIONS.dormakaba L80 Muto
Comfort Ceiling Mount with Dormotion - Figure 292.18.1 Slide door open until it meets the end stop.
2.18.2 Measure and cut view protection profile to fit into empty sliding portion of track – 3/16″ [5].
2.18.3 Snap view protection clips onto inside of cover as shown.
2.18.4 Use minimum 1 clip per foot of profile.
Exception: If profile is minimum of 1 foot in length, use 2 clips.

2.19 Install cover and view protection profile
Fig. 19
dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
302.19.1 Secure cover to clips and snap into place.
NOTE: Roll cover from the bottom upwards. Ensure the bottom of the cover is supported by the groove in the cover clip.
2.19.2 Tip view protection profile up into track and snap down into cover and onto track as shown.

2.20 Install end caps
Fig. 20dormakaba L80 Muto Comfort Ceiling Mount with Dormotion - Figure
31 2.20.1 Snap end caps onto track.

Scan for product details and downloads.
Call 800-523-8483 or visit glasstechserv.us@dormakaba.com for assistance or warranty information

https://bit.ly/3v0h9lh?r=qr

dormakaba Logodormakaba USA, Inc.
1 Dorma Drive, Drawer AC
Reamstown, PA 17567
MUTO Comfort 11-2023 936045

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

dormakaba User Manuals

Related Manuals