dormakaba ESA500 Fixed Sidelite all Glass Automatic Sliding Door with ESA II Controller Installation Guide
- June 3, 2024
- dormakaba
Table of Contents
- Tools Required:
- Components – Overview
- Header to Jamb Assembly
- Assembly
- Sidelite Mounting
- Securing the Sidelite
- Vertical Alignment for SX panel
- SX Panel Centerline Adjustment
- Adjustment of the Breakout-Unit
- Adjustment of the Roller Catch
- Adjustment of the End Stops
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
- 2 Phillips (Crosspoint) – for various #8, #10, and #14 screws
- 5/16 Hex Head bolts attaching end stops and operator parts 15/16″ wrench –
- 14 X 2-1/2″ PHSMS (Pocket Jambs)
- 14 X 3″ FHSMS (Tube Jambs)
- 10 X 1-1/2″ FHSMS
- 14 X 1-1/2″ HHSMS
- 14 Flat Washer
Installation Manual
DL2844-050 05-2022
ESA500
Fixed sidelite/all glass automatic sliding door with ESA II controller
Tools Required:
-
Screwdrivers
Small Straight (FlatBlade) – for Terminal Block wiring2 Phillips (Crosspoint) – for various #8, #10, and #14 screws
-
Wrenches / Sockets
7/16″ – for #1/4-20 Hex Head bolts attaching header to jambs 1/2″ (13mm) – for5/16 Hex Head bolts attaching end stops and operator parts 15/16″ wrench –
for carrier and anti-rise roller adjustment
-
Allen Wrenches
3mm – for “SX” & “SO” roller catch adjustment 1/8” – for “SO” arm stop & “SX” bottom pivot 5/32” – for “SO” top pivot 5mm (3/16”) – for “SO” arm pivot screw 7/32″ – for “SX” breakout adjustment 5/16″ – for carrier and anti-rise roller adjustment -
Electric Drill with the following drill bits
9/64″ (or#28) – for installing sensors & “SO” bottom roller stop 5/32″ (or#22) – for installing #10 sheet metal screws into adjacent storefront
13/64″ (or#7) – for installing #14 sheet metal screws into adjacent storefront 1/4″ – for clearance holes in jambs 82 degree Countersink -
Impact Drill with the following masonry bits
1/4″ – for #10 screw anchors 5/16″ – for #14 screw anchors -
Level – suggested 4′ minimum
-
Step Ladder – 4′ or 6’
-
Tape Measure
-
Caulking and Application Gun
-
Electrical Wire Strippers / Cutters – for sensor wiring
-
Grease [to hold “SX” bottom guide block on shaft]
-
BEA Universal Remote Control – for adjusting sensors
Suggested Fasteners Required – (Not supplied)
-
Jamb Attachment Screws
14 X 2-1/2″ PHSMS (Pocket Jambs)
14 X 3″ FHSMS (Tube Jambs)
Optional Anchors for masonry
-
Threshold Attachment Screws
10 X 1-1/2″ FHSMS
Optional Anchors for masonry
-
Header Attachment Screws
14 X 1-1/2″ HHSMS
14 Flat Washer
-
Construction Shims – for squaring door frame in opening
Components – Overview
1. Header Unit
2. Jamb
3. Fixed Sidelight (“O” Panel)| 4. Sliding Panel(“SX” Panel)
5. Motion Detector
6. Program Switch
---|---
Header to Jamb Assembly
Fasten the header unit to the jambs using (5) 1/4-20 x 1” hex bolts per side. (7/16” socket/wrench required.)
Assembly
- Place the header & jamb assembly into the rough opening.
- Level all sides and shim as required.
- Fasten assembly into rough opening, after verifying unit is level and plumb in all directions.
The mounting of the operator to the rough opening must meet applicable building codes and standards.
Sidelite Mounting
Feed the safety beam cables through the pre-drilled holes in the header and
lay in the radiused trough as shown above.
Stand the sidelite in place and plumb all sides. If necessary use shims below
the track to level any unevenness in the flooring.
Secure the sidelite in position using clamps or similar means.
Securing the Sidelite
- Verify that the sidelite is plumb in all directions and properly seated against the jamb.
- Pre-drill holes through header and sidelite on top with 1/8” drill.
- Use screws to attach the sidelite on top, to the header.
- Secure the bottom of the sidelite by drilling through the holes in the floor rail, shim as necessary, then fasten into place.
Verify that the sidelite is plumb in all directions and make any necessary adjustments.
Vertical Alignment for SX panel
Using the eccentric carrier wheel (CW), and the anti-riser wheel (AW), level the sliding panel. Tighten hex nuts to secure the adjustment.
Adjustment of the anti-riser roller: The anti-riser roller should not contact the top track anywhere along the slide path of the door.
SX Panel Centerline Adjustment
- With the lower belt bracket securely fastened and the upper belt bracket in its loose position, the SX panels can be properly adjusted to their center position.
- After panels are centered, fasten upper belt bracket to carrier. (7/16” socket or wrench required.)
Adjustment of the Breakout-Unit
- Loosen the set screws (a, b & c) to prevent interference while adjusting door. (7/32” Allen wrench required.)
- Use the adjustment screw (d) to lift (CW), or lower (CCW), the leading edge of door.
- Continue adjustment until the re-latch profiles are properly aligned.
- Tighten all set screws (a, b & c) until tight and secure.
Recheck the latched position alignment and readjust as necessary.
Adjustment of the Roller Catch
Align the roller catches as illustrated using the adjustment screws. (3mm
Allen wrench tool required.)
Pay close attention to the disengagement or breakout force.
Do not exceed ANSI A156.10 Standards.
Adjustment of the End Stops
End stops are installed at the factory. Adjustments should be made by loosening the bolt and sliding the stop to the appropriate position. Be sure adjustments are made symmetrically to the door opening, while providing proper finger safety per ANSI A156.10 standards. (½” socket or wrench required.)